DEPARTMENT OF AGRARIAN REFORM

CY 2013 PHYSICAL PLAN BED NO. 2 MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS

PREVIOUS YEAR PERFORMANCE ACCOMPLISHME INDICATORS REGION/PROVINC NTS E (PIs) (2012)

CY 2013 PHYSICAL TARGETS

CY 2013 QUARTERLY PHYSICAL TARGETS

118,265

160,001

160,001

1,207 57 734 247 169 564 525 23 16 8,057 175 1,046 6,832 5 5,315 213 874 387 1,215 1,220 771 515 120 6,420 372 299 362 1,717 3,393 278

1,422 349 670 112 290 617 435 21 162 11,778 1 3,151 2,235 6,366 24 3,854 177 364 492 98 1,294 651 528 250 4,996 475 68 379 409 3,406 259

1,422 349 670 112 290 617 435 21 162 11,778 1 3,151 2,235 6,366 24 3,854 177 364 492 98 1,294 651 528 250 4,996 475 68 379 409 3,406 259

1ST

2ND

3RD

4TH

MFO1: LAND TENURE INSTRUMENTS AWARDED TO LANDLESS FARMERS AND LANDOWNERS COMPENSATION I. LAND TENURE IMPROVEMENT (LTI) A. Land Acquisition and Distribution

Gross area covered for PHILIPPINES distribution (1 + 2), in CAR ABRA APAYAO BENGUET IFUGAO KALINGA MOUNTAIN PROVINCE I ILOCOS NORTE ILOCOS SUR LA UNION PANGASINAN II BATANES CAGAYAN ISABELA NUEVA VIZCAYA QUIRINO III AURORA BATAAN BULACAN NUEVA ECIJA NORTH NUEVA ECIJA SOUTH PAMPANGA TARLAC ZAMBALES IV-A BATANGAS CAVITE LAGUNA QUEZON I QUEZON II RIZAL Page 1 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) IV-B MARINDUQUE OCCIDENTAL MINDORO ORIENTAL MINDORO PALAWAN ROMBLON V ALBAY CAMARINES NORTE CAMARINES SUR A CAMARINES SUR B CATANDUANES MASBATE SORSOGON VI AKLAN ANTIQUE CAPIZ GUIMARAS ILOILO NEGROS OCCIDENTAL NORTH NEGROS OCCIDENTAL SOUTH VII BOHOL CEBU NEGROS ORIENTAL SIQUIJOR VIII BILIRAN EASTERN SAMAR LEYTE NORTHERN SAMAR SOUTHERN LEYTE WESTERN SAMAR IX SIBUGAY ZAMBOANGA DEL NORTE ZAMBOANGA DEL SUR X BUKIDNON NORTH BUKIDNON SOUTH CAMIGUIN LANAO DEL NORTE MISAMIS OCCIDENTAL MISAMIS ORIENTAL

Page 2 of 76 LTI

4,725 583 505 736 2,359 542 2,931 398 278 596 823 165 483 189 7,490 95 167 1,036 312 737 2,241 2,902 5,940 1,983 1,929 2,028 978 74 72 565 69 90 109 3,151 1,524 1,308 319 11,319 2,153 1,479 17 1,771 5,278 622

5,237 364 839 1,245 1,990 800 14,649 977 2,120 3,836 5,229 343 1,101 1,042 23,414 812 277 2,366 600 1,354 10,415 7,590 4,883 1,090 1,736 2,051 6 10,364 40 66 7,663 1,379 218 998 4,994 2,712 1,631 651 12,039 3,486 2,555 33 2,927 2,497 542

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH 5,237 364 839 1,245 1,990 800 14,649 977 2,120 3,836 5,229 343 1,101 1,042 23,414 812 277 2,366 600 1,354 10,415 7,590 4,883 1,090 1,736 2,051 6 10,364 40 66 7,663 1,379 218 998 4,994 2,712 1,631 651 12,039 3,486 2,555 33 2,927 2,497 542

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

1.

New lands for acquisition and distribution

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) XI COMPOSTELA VALLEY DAVAO CITY DAVAO DEL NORTE DAVAO DEL SUR DAVAO ORIENTAL XII NORTH COTABATO SARANGANI SOUTH COTABATO SULTAN KUDARAT CARAGA AGUSAN DEL NORTE AGUSAN DEL SUR DINAGAT ISLAND SURIGAO DEL NORTE SURIGAO DEL SUR ARMM BASILAN LANAO DEL SUR MAGUINDANAO SULU TAWI-TAWI Gross area covered for PHILIPPINES acquisition and distribution, in CAR ABRA

3,892 806 435 1,302 529 820 42,658 10,770 7,261 13,179 11,448 11,579 2,205 7,296 546 219 1,313 2,038 555 976 507 -

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

5,719 1,306 586 901 1,740 1,185 40,112 10,328 7,338 13,439 9,007 9,588 1,370 5,265 38 146 2,769 6,337 3,731 410 669 1,527

4TH 5,719 1,306 586 901 1,740 1,185 40,112 10,328 7,338 13,439 9,007 9,588 1,370 5,265 38 146 2,769 6,337 3,731 410 669 1,527

70,001 632

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration APAYAO Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

BENGUET Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

632 632

632 632

632 632

632 Page 3 of 76 LTI

632

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

-

-

-

4TH

IFUGAO

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

KALINGA Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

MOUNTAIN PROVINCE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

I ILOCOS NORTE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

458

-

435 435

435 435

435 435

435

435

ILOCOS SUR Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

LA UNION Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

10 10

10 10

10 10

10

10

PANGASINAN Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

14 14

14 14

14 14

14

Page 4 of 76 LTI

14

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) II BATANES

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

8,599

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1 1

1 1

1 1

1

1

CAGAYAN Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,453 1,453

1,453 1,453

1,453 1,453

1,453

1,453

ISABELA Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

754 754

754 754

754 754

754

754

NUEVA VIZCAYA Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

6,366 6,366

6,366 6,366

6,366 6,366

6,366

6,366

QUIRINO Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

24 24

24 24

24 24

III AURORA Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

24 973

24

-

-

-

-

-

BATAAN Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

100 100

100 100

100 100

100

Page 5 of 76 LTI

100

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

-

-

-

4TH

BULACAN

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

NUEVA ECIJA NORTH Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

NUEVA ECIJA SOUTH Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

451 451

451 451

451 451

451

451

PAMPANGA Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

322 322

322 322

322 322

322

322

TARLAC Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

ZAMBALES Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

100 100

100 100

100 100

IV-A BATANGAS Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

100 727

100

460 460

460 460

460 460

460

Page 6 of 76 LTI

460

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

-

-

-

4TH

CAVITE

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

LAGUNA Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

267 267

267 267

267 267

267

267

QUEZON I Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

QUEZON II Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

RIZAL Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

IV-B MARINDUQUE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

3,145

-

210 210

210 210

210 210

210

210

OCCIDENTAL MINDORO Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

662 662

662 662

662 662

662

Page 7 of 76 LTI

662

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

ORIENTAL MINDORO

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

771 771

771 771

771 771

771

771

PALAWAN Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,502 1,502

1,502 1,502

1,502 1,502

1,502

1,502

ROMBLON Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

V ALBAY Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

6,880

-

977 977

977 977

977 977

977

977

CAMARINES NORTE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

2,100 2,100

2,100 2,100

2,100 2,100

2,100

2,100

CAMARINES SUR A Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

CAMARINES SUR B Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,459 1,459

1,459 1,459

1,459 1,459

1,459

Page 8 of 76 LTI

1,459

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

CATANDUANES

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

343 343

343 343

343 343

343

343

MASBATE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,101 1,101

1,101 1,101

1,101 1,101

1,101

1,101

SORSOGON Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

900 900

900 900

900 900

VI AKLAN Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

900 5,617

900

489 489

489 489

489 489

489

489

ANTIQUE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

233 233

233 233

233 233

233

233

CAPIZ Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

2,366 2,366

2,366 2,366

2,366 2,366

2,366

2,366

GUIMARAS Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

292 292

292 292

292 292

292

Page 9 of 76 LTI

292

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

-

-

-

4TH

ILOILO

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

NEGROS OCCIDENTAL NORTH Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

2,237 2,237

2,237 2,237

2,237 2,237

2,237

2,237

NEGROS OCCIDENTAL SOUTH Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

VII BOHOL Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,284

-

467 467

467 467

467 467

467

467

CEBU Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

811 811

811 811

811 811

811

811

NEGROS ORIENTAL Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

SIQUIJOR Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

6 6

6 6

6 6

6

Page 10 of 76 LTI

6

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) VIII BILIRAN

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

5,129 14 14

14 14

14 14

14

14

EASTERN SAMAR Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

48 48

48 48

48 48

48

48

LEYTE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

2,708 2,708

2,708 2,708

2,708 2,708

2,708

2,708

NORTHERN SAMAR Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,293 1,293

1,293 1,293

1,293 1,293

1,293

1,293

SOUTHERN LEYTE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

68 68

68 68

68 68

68

68

WESTERN SAMAR Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

998 998

998 998

998 998

IX SIBUGAY Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

998 2,603

998

1,336 1,336

1,336 1,336

1,336 1,336

1,336

Page 11 of 76 LTI

1,336

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

ZAMBOANGA DEL NORTE

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,085 1,085

1,085 1,085

1,085 1,085

1,085

1,085

ZAMBOANGA DEL SUR Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

182 182

182 182

182 182

X BUKIDNON NORTH Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

182 4,111

182

369 369

369 369

369 369

369

369

BUKIDNON SOUTH Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,682 1,682

1,682 1,682

1,682 1,682

1,682

1,682

CAMIGUIN Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

33 33

33 33

33 33

33

33

LANAO DEL NORTE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

555 555

555 555

555 555

555

555

MISAMIS OCCIDENTAL Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,473 1,473

1,473 1,473

1,473 1,473

1,473

Page 12 of 76 LTI

1,473

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

-

-

-

4TH

MISAMIS ORIENTAL

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

XI COMPOSTELA VALLEY

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

2,476

-

564 564

564 564

564 564

564

564

DAVAO CITY Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

317 317

317 317

317 317

317

317

DAVAO DEL NORTE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

172 172

172 172

172 172

172

172

DAVAO DEL SUR Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

602 602

602 602

602 602

602

602

DAVAO ORIENTAL Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

820 820

820 820

820 820

XII NORTH COTABATO Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

820 21,029

820

3,236 3,236

3,236 3,236

3,236 3,236

3,236

Page 13 of 76 LTI

3,236

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

SARANGANI

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

5,781 5,781

5,781 5,781

5,781 5,781

5,781

5,781

SOUTH COTABATO Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

6,962 6,962

6,962 6,962

6,962 6,962

6,962

6,962

SULTAN KUDARAT Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

5,050 5,050

5,050 5,050

5,050 5,050

CARAGA AGUSAN DEL NORTE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

5,050 5,482

5,050

616 616

616 616

616 616

616

616

AGUSAN DEL SUR Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

3,306 3,306

3,306 3,306

3,306 3,306

3,306

3,306

DINAGAT ISLAND Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

SURIGAO DEL NORTE Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

146 146

146 146

146 146

146

Page 14 of 76 LTI

146

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

SURIGAO DEL SUR

Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,414 1,414

1,414 1,414

1,414 1,414

ARMM BASILAN Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

1,414 856

1,414

-

-

-

-

-

LANAO DEL SUR Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

MAGUINDANAO Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

SULU Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration

-

-

-

-

-

TAWI-TAWI Claimfolder Documentation Survey Claimfolder Processing Claimfolder Valuation CLOA Generation/Registration 2.

Pipelined landholdings (in 2012) for distribution during the year

856 856

856 856

856 856

856 Area distributed, in hectares PHILIPPINES CAR ABRA

Claimfolder Valuation CLOA Generation/Registration

856

90,000 789 -

Page 15 of 76 LTI

-

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

APAYAO

Claimfolder Valuation CLOA Generation/Registration

349 349

349

BENGUET Claimfolder Valuation CLOA Generation/Registration

38 38

38

IFUGAO Claimfolder Valuation CLOA Generation/Registration

112 112

112

KALINGA Claimfolder Valuation CLOA Generation/Registration

290 290

290

MOUNTAIN PROVINCE Claimfolder Valuation CLOA Generation/Registration

I ILOCOS NORTE

Claimfolder Valuation CLOA Generation/Registration

159

-

-

-

ILOCOS SUR Claimfolder Valuation CLOA Generation/Registration

-

-

LA UNION Claimfolder Valuation CLOA Generation/Registration

11 11

11

PANGASINAN Claimfolder Valuation CLOA Generation/Registration

148 II BATANES

Claimfolder Valuation CLOA Generation/Registration

148 3,179

148

-

-

CAGAYAN Claimfolder Valuation CLOA Generation/Registration

1,698 1,698

1,698

ISABELA Claimfolder Valuation CLOA Generation/Registration

1,481 1,481

1,481

NUEVA VIZCAYA Claimfolder Valuation CLOA Generation/Registration

-

-

QUIRINO Claimfolder Valuation CLOA Generation/Registration

-

Page 16 of 76 LTI

-

3RD

4TH

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) III AURORA

Claimfolder Valuation CLOA Generation/Registration

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

2,881 177 177

177

BATAAN Claimfolder Valuation CLOA Generation/Registration

264 264

264

BULACAN Claimfolder Valuation CLOA Generation/Registration

492 492

492

NUEVA ECIJA NORTH Claimfolder Valuation CLOA Generation/Registration

98 98

98

NUEVA ECIJA SOUTH Claimfolder Valuation CLOA Generation/Registration

843 843

843

PAMPANGA Claimfolder Valuation CLOA Generation/Registration

329 329

329

TARLAC Claimfolder Valuation CLOA Generation/Registration

528 528

528

ZAMBALES Claimfolder Valuation CLOA Generation/Registration

150 IV-A BATANGAS

Claimfolder Valuation CLOA Generation/Registration

150 4,269

150

15 15

15

CAVITE Claimfolder Valuation CLOA Generation/Registration

68 68

68

LAGUNA Claimfolder Valuation CLOA Generation/Registration

112 112

112

QUEZON I Claimfolder Valuation CLOA Generation/Registration

409 409

409

QUEZON II Claimfolder Valuation CLOA Generation/Registration

3,406 3,406

3,406

RIZAL Claimfolder Valuation CLOA Generation/Registration

259 259

Page 17 of 76 LTI

259

3RD

4TH

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) IV-B MARINDUQUE

Claimfolder Valuation CLOA Generation/Registration

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

2,093 154 154

154

OCCIDENTAL MINDORO Claimfolder Valuation CLOA Generation/Registration

177 177

177

ORIENTAL MINDORO Claimfolder Valuation CLOA Generation/Registration

474 474

474

PALAWAN Claimfolder Valuation CLOA Generation/Registration

488 488

488

ROMBLON Claimfolder Valuation CLOA Generation/Registration

800 V ALBAY

Claimfolder Valuation CLOA Generation/Registration

800 7,769

800

-

-

CAMARINES NORTE Claimfolder Valuation CLOA Generation/Registration

20 20

20

CAMARINES SUR A Claimfolder Valuation CLOA Generation/Registration

3,836 3,836

3,836

CAMARINES SUR B Claimfolder Valuation CLOA Generation/Registration

3,770 3,770

3,770

CATANDUANES Claimfolder Valuation CLOA Generation/Registration

-

-

MASBATE Claimfolder Valuation CLOA Generation/Registration

-

-

SORSOGON Claimfolder Valuation CLOA Generation/Registration

142 VI AKLAN

Claimfolder Valuation CLOA Generation/Registration

142 17,797

142

323 323

323

ANTIQUE Claimfolder Valuation CLOA Generation/Registration

44 44

Page 18 of 76 LTI

44

3RD

4TH

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

CAPIZ

Claimfolder Valuation CLOA Generation/Registration

-

-

GUIMARAS Claimfolder Valuation CLOA Generation/Registration

308 308

308

ILOILO Claimfolder Valuation CLOA Generation/Registration

1,354 1,354

1,354

NEGROS OCCIDENTAL NORTH Claimfolder Valuation CLOA Generation/Registration

8,178 8,178

8,178

NEGROS OCCIDENTAL SOUTH Claimfolder Valuation CLOA Generation/Registration

7,590 VII BOHOL

Claimfolder Valuation CLOA Generation/Registration

7,590 3,599

7,590

623 623

623

CEBU Claimfolder Valuation CLOA Generation/Registration

925 925

925

NEGROS ORIENTAL Claimfolder Valuation CLOA Generation/Registration

2,051 2,051

2,051

SIQUIJOR Claimfolder Valuation CLOA Generation/Registration

VIII BILIRAN

Claimfolder Valuation CLOA Generation/Registration

5,234

-

25 25

25

EASTERN SAMAR Claimfolder Valuation CLOA Generation/Registration

18 18

18

LEYTE Claimfolder Valuation CLOA Generation/Registration

4,955 4,955

4,955

NORTHERN SAMAR Claimfolder Valuation CLOA Generation/Registration

86 86

86

SOUTHERN LEYTE Claimfolder Valuation CLOA Generation/Registration

150 150

Page 19 of 76 LTI

150

3RD

4TH

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

WESTERN SAMAR

Claimfolder Valuation CLOA Generation/Registration

IX SIBUGAY

Claimfolder Valuation CLOA Generation/Registration

2,391

-

1,376 1,376

1,376

ZAMBOANGA DEL NORTE Claimfolder Valuation CLOA Generation/Registration

546 546

546

ZAMBOANGA DEL SUR Claimfolder Valuation CLOA Generation/Registration

469 X BUKIDNON NORTH

Claimfolder Valuation CLOA Generation/Registration

469 7,928

469

3,117 3,117

3,117

BUKIDNON SOUTH Claimfolder Valuation CLOA Generation/Registration

873 873

873

CAMIGUIN Claimfolder Valuation CLOA Generation/Registration

-

-

LANAO DEL NORTE Claimfolder Valuation CLOA Generation/Registration

2,372 2,372

2,372

MISAMIS OCCIDENTAL Claimfolder Valuation CLOA Generation/Registration

1,024 1,024

1,024

MISAMIS ORIENTAL Claimfolder Valuation CLOA Generation/Registration

542 XI COMPOSTELA VALLEY

Claimfolder Valuation CLOA Generation/Registration

542 3,243

542

742 742

742

DAVAO CITY Claimfolder Valuation CLOA Generation/Registration

269 269

269

DAVAO DEL NORTE Claimfolder Valuation CLOA Generation/Registration

729 729

729

DAVAO DEL SUR Claimfolder Valuation CLOA Generation/Registration

1,138 1,138

Page 20 of 76 LTI

1,138

3RD

4TH

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

DAVAO ORIENTAL

Claimfolder Valuation CLOA Generation/Registration

365 XII NORTH COTABATO

Claimfolder Valuation CLOA Generation/Registration

365 19,083

365

7,092 7,092

7,092

SARANGANI Claimfolder Valuation CLOA Generation/Registration

1,557 1,557

1,557

SOUTH COTABATO Claimfolder Valuation CLOA Generation/Registration

6,477 6,477

6,477

SULTAN KUDARAT Claimfolder Valuation CLOA Generation/Registration

3,957 CARAGA AGUSAN DEL NORTE

Claimfolder Valuation CLOA Generation/Registration

3,957 4,106

3,957

754 754

754

AGUSAN DEL SUR Claimfolder Valuation CLOA Generation/Registration

1,959 1,959

1,959

DINAGAT ISLAND Claimfolder Valuation CLOA Generation/Registration

38 38

38

SURIGAO DEL NORTE Claimfolder Valuation CLOA Generation/Registration

-

-

SURIGAO DEL SUR Claimfolder Valuation CLOA Generation/Registration

1,355 ARMM BASILAN

Claimfolder Valuation CLOA Generation/Registration

1,355 5,481

1,355

-

-

LANAO DEL SUR Claimfolder Valuation CLOA Generation/Registration

3,731 3,731

3,731

MAGUINDANAO Claimfolder Valuation CLOA Generation/Registration

410 410

410

SULU Claimfolder Valuation CLOA Generation/Registration

669 669

Page 21 of 76 LTI

669

3RD

4TH

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

1ST

2ND

3RD

4TH

TAWI-TAWI

Claimfolder Valuation CLOA Generation/Registration 3. New lands for acquisition (pipelining for 2014 distribution)

CY 2013 QUARTERLY PHYSICAL TARGETS

671 671 Area documented PHILIPPINES with approved survey CAR ABRA

177,578

-

-

-

4,230 -

-

-

-

-

-

-

1,305 1,305

1,305 1,305

1,305

133 133

133 133

133

824 824

824 824

824

1,969 1,969

1,969 1,969

1,969

-

-

-

157 157

157 157

157

-

-

-

149 149

149 149

149

1,412 1,412

1,412 1,412

1,412

-

-

-

1,219 1,219

1,219 1,219

1,219

Claimfolder Documentation Survey APAYAO

1,305

Claimfolder Documentation Survey BENGUET

133

Claimfolder Documentation Survey IFUGAO

824

Claimfolder Documentation Survey KALINGA

1,969

Claimfolder Documentation Survey MOUNTAIN PROVINCE

-

Claimfolder Documentation Survey I ILOCOS NORTE

1,718 157

Claimfolder Documentation Survey ILOCOS SUR

-

Claimfolder Documentation Survey LA UNION

149

Claimfolder Documentation Survey PANGASINAN

1,412

Claimfolder Documentation Survey II BATANES

7,156 -

Claimfolder Documentation Survey CAGAYAN Claimfolder Documentation Survey

Page 22 of 76 LTI

671

1,219

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) ISABELA

Claimfolder Documentation Survey

Page 23 of 76 LTI

30

124 124

124 124

124

115 115

115 115

115

1,450 1,450

1,450 1,450

1,450

810 810

810 810

810

748 748

748 748

748

541 541

541 541

541

1,449 1,449

1,449 1,449

1,449

331 331

331 331

331

2,634 2,634

2,634 2,634

2,634

370 370

370 370

370

232 232

232 232

232

370

Claimfolder Documentation Survey LAGUNA

30 30

11,551 2,634

Claimfolder Documentation Survey CAVITE

30 30

331

Claimfolder Documentation Survey IV-A BATANGAS

1,921

1,449

Claimfolder Documentation Survey ZAMBALES

1,921 1,921

541

Claimfolder Documentation Survey TARLAC

1,921 1,921

748

Claimfolder Documentation Survey PAMPANGA

3,986

810

Claimfolder Documentation Survey NUEVA ECIJA SOUTH

3,986 3,986

1,450

Claimfolder Documentation Survey NUEVA ECIJA NORTH

3,986 3,986

115

Claimfolder Documentation Survey BULACAN

4TH

5,568 124

Claimfolder Documentation Survey BATAAN

3RD

30

Claimfolder Documentation Survey III AURORA

2ND

1,921

Claimfolder Documentation Survey QUIRINO

1ST

3,986

Claimfolder Documentation Survey NUEVA VIZCAYA

CY 2013 QUARTERLY PHYSICAL TARGETS

232

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) QUEZON I

Claimfolder Documentation Survey

Page 24 of 76 LTI

1,625

68 68

68 68

68

363 363

363 363

363

559 559

559 559

559

503 503

503 503

503

677 677

677 677

677

1,243 1,243

1,243 1,243

1,243

2,278 2,278

2,278 2,278

2,278

2,996 2,996

2,996 2,996

2,996

3,124 3,124

3,124 3,124

3,124

421 421

421 421

421

3,151 3,151

3,151 3,151

3,151

421

Claimfolder Documentation Survey MASBATE

1,625 1,625

3,124

Claimfolder Documentation Survey CATANDUANES

1,625 1,625

2,996

Claimfolder Documentation Survey CAMARINES SUR B

5,392

2,278

Claimfolder Documentation Survey CAMARINES SUR A

5,392 5,392

16,452 1,243

Claimfolder Documentation Survey CAMARINES NORTE

5,392 5,392

677

Claimfolder Documentation Survey V ALBAY

1,298

503

Claimfolder Documentation Survey ROMBLON

1,298 1,298

559

Claimfolder Documentation Survey PALAWAN

1,298 1,298

363

Claimfolder Documentation Survey ORIENTAL MINDORO

4TH

2,170 68

Claimfolder Documentation Survey OCCIDENTAL MINDORO

3RD

1,625

Claimfolder Documentation Survey IV-B MARINDUQUE

2ND

5,392

Claimfolder Documentation Survey RIZAL

1ST

1,298

Claimfolder Documentation Survey QUEZON II

CY 2013 QUARTERLY PHYSICAL TARGETS

3,151

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) SORSOGON

Claimfolder Documentation Survey

Page 25 of 76 LTI

231

4,062 4,062

4,062 4,062

4,062

852 852

852 852

852

5,060 5,060

5,060 5,060

5,060

5,684 5,684

5,684 5,684

5,684

4,991 4,991

4,991 4,991

4,991

1,405 1,405

1,405 1,405

1,405

1,239 1,239

1,239 1,239

1,239

4,140 4,140

4,140 4,140

4,140

-

-

-

10,206 20

Claimfolder Documentation Survey EASTERN SAMAR

231 231

-

Claimfolder Documentation Survey VIII BILIRAN

231 231

4,140

Claimfolder Documentation Survey SIQUIJOR

790

1,239

Claimfolder Documentation Survey NEGROS ORIENTAL

790 790

6,784 1,405

Claimfolder Documentation Survey CEBU

790 790

4,991

Claimfolder Documentation Survey VII BOHOL

3,240

5,684

Claimfolder Documentation Survey NEGROS OCCIDENTAL SOUTH

3,240 3,240

5,060

Claimfolder Documentation Survey NEGROS OCCIDENTAL NORTH

3,240 3,240

852

Claimfolder Documentation Survey ILOILO

4TH

4,062

Claimfolder Documentation Survey GUIMARAS

3RD

231

Claimfolder Documentation Survey CAPIZ

2ND

21,670 790

Claimfolder Documentation Survey ANTIQUE

1ST

3,240

Claimfolder Documentation Survey VI AKLAN

CY 2013 QUARTERLY PHYSICAL TARGETS

20 20

20 20

20

237 237

237 237

237

237

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) LEYTE

Claimfolder Documentation Survey

Page 26 of 76 LTI

80

3,075 3,075

3,075 3,075

3,075

854 854

854 854

854

3,593 3,593

3,593 3,593

3,593

1,841 1,841

1,841 1,841

1,841

4,283 4,283

4,283 4,283

4,283

3,535 3,535

3,535 3,535

3,535

3 3

3 3

3

4,139 4,139

4,139 4,139

4,139

861 861

861 861

861

1,680 1,680

1,680 1,680

1,680

1,827 1,827

1,827 1,827

1,827

1,680

Claimfolder Documentation Survey XI COMPOSTELA VALLEY

80 80

861

Claimfolder Documentation Survey MISAMIS ORIENTAL

80 80

4,139

Claimfolder Documentation Survey MISAMIS OCCIDENTAL

1,024

3

Claimfolder Documentation Survey LANAO DEL NORTE

1,024 1,024

3,535

Claimfolder Documentation Survey CAMIGUIN

1,024 1,024

14,502 4,283

Claimfolder Documentation Survey BUKIDNON SOUTH

5,770

1,841

Claimfolder Documentation Survey X BUKIDNON NORTH

5,770 5,770

3,593

Claimfolder Documentation Survey ZAMBOANGA DEL SUR

5,770 5,770

6,288 854

Claimfolder Documentation Survey ZAMBOANGA DEL NORTE

4TH

3,075

Claimfolder Documentation Survey IX SIBUGAY

3RD

80

Claimfolder Documentation Survey WESTERN SAMAR

2ND

1,024

Claimfolder Documentation Survey SOUTHERN LEYTE

1ST

5,770

Claimfolder Documentation Survey NORTHERN SAMAR

CY 2013 QUARTERLY PHYSICAL TARGETS

10,097 1,827

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) DAVAO CITY

Claimfolder Documentation Survey

Page 27 of 76 LTI

3,106

2,673 2,673

2,673 2,673

2,673

12,980 12,980

12,980 12,980

12,980

7,899 7,899

7,899 7,899

7,899

12,421 12,421

12,421 12,421

12,421

4,624 4,624

4,624 4,624

4,624

2,730 2,730

2,730 2,730

2,730

4,258 4,258

4,258 4,258

4,258

5 5

5 5

5

1,535 1,535

1,535 1,535

1,535

3,188 3,188

3,188 3,188

3,188

2,595 2,595

2,595 2,595

2,595

3,188

Claimfolder Documentation Survey ARMM BASILAN

3,106 3,106

1,535

Claimfolder Documentation Survey SURIGAO DEL SUR

3,106 3,106

5

Claimfolder Documentation Survey SURIGAO DEL NORTE

1,756

4,258

Claimfolder Documentation Survey DINAGAT ISLAND

1,756 1,756

11,716 2,730

Claimfolder Documentation Survey AGUSAN DEL SUR

1,756 1,756

4,624

Claimfolder Documentation Survey CARAGA AGUSAN DEL NORTE

736

12,421

Claimfolder Documentation Survey SULTAN KUDARAT

736 736

7,899

Claimfolder Documentation Survey SOUTH COTABATO

736 736

37,924 12,980

Claimfolder Documentation Survey SARANGANI

4TH

2,673

Claimfolder Documentation Survey XII NORTH COTABATO

3RD

3,106

Claimfolder Documentation Survey DAVAO ORIENTAL

2ND

1,756

Claimfolder Documentation Survey DAVAO DEL SUR

1ST

736

Claimfolder Documentation Survey DAVAO DEL NORTE

CY 2013 QUARTERLY PHYSICAL TARGETS

9,546 2,595

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

LANAO DEL SUR

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

1,544 1,544

1,544

2,517 2,517

2,517 2,517

2,517

1,762 1,762

1,762 1,762

1,762

1,128 1,128

1,128 1,128

1,128

3,467

3,467

299

299

299

359

359

1,762

Claimfolder Documentation Survey TAWI-TAWI

1,544 1,544 2,517

Claimfolder Documentation Survey SULU

4TH

1,544

Claimfolder Documentation Survey MAGUINDANAO

3RD

1,128

Claimfolder Documentation Survey

B. Support Activities to Land Acquisition and Distribution 1.

Inspection, verification and approval of survey returns (DARARMM) 1.1 In support of distribution of new lands

Area placed under IVAS,DAR-ARMM in hectares

10,402

1.2

Area placed under IVAS,DAR-ARMM in hectares

897

For subdivision of collective CLOAs

2.

Reconstitution of lost/burnt/missing titles

3.

Issuance of Notice of Coverage (NOCs) (for CA Under Phase 3B) 3.1

Personal/Substituted/Other Services

11,298

Titles reconstituted, number NATIONWIDE

No. of landholdings issued with NOCs

PHILIPPINES CAR ABRA APAYAO BENGUET IFUGAO KALINGA MOUNTAIN PROVINCE I ILOCOS NORTE ILOCOS SUR LA UNION PANGASINAN II BATANES CAGAYAN ISABELA NUEVA VIZCAYA QUIRINO

Page 28 of 76 LTI

3,467

1,435

359

359

34,834

18,036

16,798

18

18

15

15

3

3

41 29

41 29

1 11 3,103

1 11 1,554

120 2,981 2

61 1,491 2

1,549 59 1,490

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) III AURORA BATAAN BULACAN NUEVA ECIJA NORTH NUEVA ECIJA SOUTH PAMPANGA TARLAC ZAMBALES IV-A BATANGAS CAVITE LAGUNA QUEZON I QUEZON II RIZAL IV-B MARINDUQUE OCCIDENTAL MINDORO ORIENTAL MINDORO PALAWAN ROMBLON V ALBAY CAMARINES NORTE CAMARINES SUR A CAMARINES SUR B CATANDUANES MASBATE SORSOGON VI AKLAN ANTIQUE CAPIZ GUIMARAS ILOILO NEGROS OCCIDENTAL NORTH NEGROS OCCIDENTAL SOUTH VII BOHOL CEBU NEGROS ORIENTAL SIQUIJOR

Page 29 of 76 LTI

894 106 108 259 34 89 22 191 85 1,425 414 109 92 201 448 161 683 253 35 249 142 4 7,951 2,059 977 634 501 9 2,110 1,661 3,320 28 117 278 49 292 1,179 1,377 541 105 167 269 -

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST 385 35 47 107 20 41 12 83 40 849 239 64 52 110 289 95 385 152 20 134 75 4 3,981 1,029 488 318 251 9 1,055 831 1,638 14 60 139 25 140 587 673 260 52 73 135

2ND 509 71 61 152 14 48 10 108 45 576 175 45 40 91 159 66 298 101 15 115 67 3,970 1,030 489 316 250 1,055 830 1,682 14 57 139 24 152 592 704 281 53 94 134

3RD

4TH

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

3.2

Publication at National Level

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) VIII BILIRAN EASTERN SAMAR LEYTE NORTHERN SAMAR SOUTHERN LEYTE WESTERN SAMAR IX SIBUGAY ZAMBOANGA DEL NORTE ZAMBOANGA DEL SUR X BUKIDNON NORTH BUKIDNON SOUTH CAMIGUIN LANAO DEL NORTE MISAMIS OCCIDENTAL MISAMIS ORIENTAL XI COMPOSTELA VALLEY DAVAO CITY DAVAO DEL NORTE DAVAO DEL SUR DAVAO ORIENTAL XII NORTH COTABATO SARANGANI SOUTH COTABATO SULTAN KUDARAT CARAGA AGUSAN DEL NORTE AGUSAN DEL SUR DINAGAT ISLAND SURIGAO DEL NORTE SURIGAO DEL SUR ARMM BASILAN LANAO DEL SUR MAGUINDANAO SULU TAWI-TAWI DARCO-BLAD

Page 30 of 76 LTI

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

6,639

3,321

3,318

321 4,917 816 401 184 553 337 85 131 1,617 629 82 45 796 3 62 1,022 446 220 214 130 12 4,367 2,912 617 294 544 2,409 532 1,023 249 605 251 72

161 2,459 408 201 92 293 185 42 66 1,033 509 56 36 398 1 33 754 223 206 186 130 9 2,190 1,456 315 147 272 1,208 266 512

160 2,458 408 200 92 260 152 43 65 584 120 26 9 398 2 29 268 223 14 28 3 2,177 1,456 302 147 272 1,201 266 511

125 305 126 36

124 300 125 36

179

90

89

17,417

9,018

8,399

3RD

4TH

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

CoverageINSTRUMENTS of HLI Per SupremeAWARDED Court decision LAND4.TENURE TO LANDLESS 4.1 4.2

Support Activities to DARPO-Tarlac PBD-Related Projects In Compliance to the LTI-PBD Integration Framework

5.

Communication Plan and Cascading/Popularization of Agency Commitments for LTI

6.

Monitoring of the 25 High-LAD Provinces & Other Provinces

7.

8.

DARCO & DARPO DARCO & DARPO TARLAC NATIONWIDE 25 HIGH-LAD PROVINCES; 71 OTHER

Transformation of problematic landholdings to workable

REGIONAL AND NATIONAL LEVEL

Support to the AO 34 Inter-Agency Study Team

NATIONAL LEVEL

C. Leasehold Operations 1. Preparation, registration and implementation of leasehold agreements/contracts

Area placed under PHILIPPINES leasehold agreement, CAR ABRA APAYAO BENGUET IFUGAO KALINGA MOUNTAIN PROVINCE I ILOCOS NORTE ILOCOS SUR LA UNION PANGASINAN II BATANES CAGAYAN ISABELA NUEVA VIZCAYA QUIRINO III AURORA BATAAN BULACAN NUEVA ECIJA NORTH NUEVA ECIJA SOUTH PAMPANGA TARLAC

Page 31 of 76 LTI

15,022

17,254

590 153 139 105 193 333 227 80 26 362 1 112 56 101 92

500 100 200 100 100 160 100 50 10 250 26 90 31 103 -

1,388

6,413

5,540

3,913

-

-

-

-

33

175 35 60 40 40 64 40 20 4 62

160 40 60 30 30 48 30 15 3 112

100 10 50 20 20 38 20 15 3 43

3 9 3 18

6 22 8 26

12 40 14 46

5 19 6 13

65 15 30 10 10 10 10 -

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) ZAMBALES

Page 32 of 76 LTI

-

-

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) IV-A BATANGAS CAVITE LAGUNA QUEZON I QUEZON II RIZAL IV-B MARINDUQUE OCCIDENTAL MINDORO ORIENTAL MINDORO PALAWAN ROMBLON V ALBAY CAMARINES NORTE CAMARINES SUR A CAMARINES SUR B CATANDUANES MASBATE SORSOGON VI AKLAN ANTIQUE CAPIZ GUIMARAS ILOILO NEGROS OCCIDENTAL NORTH NEGROS OCCIDENTAL SOUTH VII BOHOL CEBU NEGROS ORIENTAL SIQUIJOR VIII BILIRAN EASTERN SAMAR LEYTE NORTHERN SAMAR SOUTHERN LEYTE WESTERN SAMAR IX SIBUGAY ZAMBOANGA DEL NORTE ZAMBOANGA DEL SUR

Page 33 of 76 LTI

544 110 166 60 87 90 30 196 85 46 65 1,689 84 183 172 304 487 358 100 472 91 25 154 10 148 44 629 109 372 44 103 1,808 243 186 192 101 1,086 1,744 626 909 210

440 66 104 60 50 160 195 45 150 6,106 1,041 289 178 178 420 3,800 200 410 90 10 100 10 100 50 50 590 100 350 40 100 2,630 200 1,000 230 200 1,000 1,470 600 800 70

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND 45 5 20

3RD

4TH

146 24 32 25 20 45

144 24 32 18 15 55

105 13 20 17 15 40

24

63 15

69 15

39 15

24 390 70 25 20 20 35 200 20 5 5 59 9 35 5 10 245

48 2,321 425 110 63 63 160 1,400 100 159 30 5 40 4 40 20 20 240 45 135 15 45 935

54 2,068 446 80 60 60 120 1,250 52 123 30

24 1,327 100 74 35 35 105 950 28 123 30

30 3 30 15 15 161 26 100 10 25 825

30 3 30 15 15 130 20 80 10 20 625

25 100 25 20 75 127 45 75 7

75 350 85 75 350 528 220 280 28

55 350 65 55 300 415 170 225 20

45 200 55 50 275 400 165 220 15

20

-

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

X BUKIDNON NORTH BUKIDNON SOUTH CAMIGUIN LANAO DEL NORTE MISAMIS OCCIDENTAL MISAMIS ORIENTAL XI COMPOSTELA VALLEY DAVAO CITY DAVAO DEL NORTE DAVAO DEL SUR DAVAO ORIENTAL XII NORTH COTABATO SARANGANI SOUTH COTABATO SULTAN KUDARAT CARAGA AGUSAN DEL NORTE AGUSAN DEL SUR DINAGAT ISLAND SURIGAO DEL NORTE SURIGAO DEL SUR ARMM BASILAN LANAO DEL SUR MAGUINDANAO SULU TAWI-TAWI

1,917 291 336 37 102 1,021 129 797 255 54 231 230 27 3,696 932 511 484 1,769 245 71 106 68 -

1,678 250 300 28 100 900 100 850 200 100 200 250 100 1,700 700 1,000 275 75 100 100 -

42,699

79,119

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

150 25 30 10 75 10 100 20 10 25 35 10 135 60

675 95 110 15 50 360 45 340 85 45 80 90 40 575 225

470 75 90 10 25 245 25 235 50 30 50 75 30 625 225

383 55 70 3 15 220 20 175 45 15 45 50 20 365 190

75 -

350 130 50

400 85 25

175 60 -

-

40

30

30

40 -

30

-

-

1,826 913

913 1,826

400 200

200 400

30 -

D. Post-LAD Tenurial Security Sustainability Programs 1.

Subdivision of Issued Collective CLOAs into individual titles

Area of Collective CLOA with subdivision survey

PHILIPPINES CAR ABRA

1,267 281

6,507 1,826 913

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration APAYAO

75

400 200

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

Page 34 of 76 LTI

913 1,826

200 400

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) BENGUET

89

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

658

38

469

221

70

563

945

711 -

92

79

-

632

749

-

250

1,264 -

-

74

150

ISABELA

1,179

92 183

-

-

1,498 749

749 1,498

500 250

250 500

-

-

300 150

150 300

200 100

100 200

92 183

-

749 1,498

250 500

-

150 300

200 100

Page 35 of 76 LTI

183 92

945 1,889

300

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

945 1,889

2,309 -

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration CAGAYAN

1,889 945

70 140

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration II BATANES

70 140

1,498

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration PANGASINAN

140 70

469 937

-

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration LA UNION

469 937

2,181 183

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration ILOCOS SUR

937 469

658 1,315

1,889

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration I ILOCOS NORTE

658 1,315

140

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration MOUNTAIN PROVINCE

1,315 658

937

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration KALINGA

4TH

1,315

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration IFUGAO

3RD

100 200

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) NUEVA VIZCAYA

11

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND 60

-

844

456 42

219

30

780

105

205

8

478

30

337

53

155

188

100

-

821

393 100

Page 36 of 76 LTI

205 409

956 478

478 956

674 337

337 674

311 155

155 311

200 100

100 200

1,643 821

821 1,643

1,953 976

976 1,953

205 409

478 956

337 674

155 311

100 200

821 1,643

5,152 1,953 976

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

409 205

780 1,559

1,643

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration IV-A BATANGAS

780 1,559

200

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration ZAMBALES

1,559 780

219 438

311

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration TARLAC

219 438

674

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration PAMPANGA

438 219

844 1,689

956

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration NUEVA ECIJA SOUTH

844 1,689

409

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration NUEVA ECIJA NORTH

1,689 844

60 120

1,559

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration BULACAN

60 120

6,189 438

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration BATAAN

120 60

1,689

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration III AURORA

4TH

120

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration QUIRINO

3RD

976 1,953

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) CAVITE

-

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

158

52

499

239

500

-

221

2

222

1,109 352

575

29

221

125

346

586

500

17

56

1,464 316

Page 37 of 76 LTI

222 444

1,150 575

575 1,150

441 221

221 441

692 346

346 692

1,000 500

500 1,000

111 56

56 111

1,000 500

500 1,000

222 444

575 1,150

221 441

346 692

500 1,000

56 111

5,298 1,000 500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

444 222

221 442

111

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration V ALBAY

221 442

1,000

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration ROMBLON

442 221

500 1,000

692

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration PALAWAN

500 1,000

441

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration ORIENTAL MINDORO

1,000 500

499 998

3,394 1,150

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration OCCIDENTAL MINDORO

499 998

444

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration IV-B MARINDUQUE

998 499

158 315

442

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration RIZAL

158 315

1,000

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration QUEZON II

315 158

998

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration QUEZON I

4TH

315

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration LAGUNA

3RD

500 1,000

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) CAMARINES NORTE

162

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST 250

42

564

35

500

451

335

428

250

30

250

954 91

625

-

1,000

405

535

205

550

ILOILO

102

500 250

250 500

500 250

250 500

1,250 625

625 1,250

2,000 1,000

1,000 2,000

1,070 535

535 1,070

1,100 550

550 1,100

1,000 500

500 1,000

335 669

250 500

250 500

625 1,250

1,000 2,000

535 1,070

550 1,100

1,000 500

Page 38 of 76 LTI

335 669

1,100

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

669 335

500 1,000

1,070

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration GUIMARAS

500 1,000

2,000

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration CAPIZ

1,000 500

564 1,129

7,420 1,250

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration ANTIQUE

564 1,129

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration VI AKLAN

1,129 564

250 500

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration SORSOGON

250 500

669

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration MASBATE

500 250

1,000

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration CATNADUANES

4TH

1,129

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration CAMARINES SUR B

3RD

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration CAMARINES SUR A

2ND

500 1,000

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) NEGROS OCCIDENTAL NORTH

115

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

250

36

250

4,960 1,808

791

1,069

750

2,076

375

7

3

2,567 159

1,000

630

1,000

725

375

255

250

SOUTHERN LEYTE

798

375 750

6 3

3 6

2,000 1,000

1,000 2,000

2,000 1,000

1,000 2,000

750 375

375 750

500 250

250 500

2,199 1,100

1,100 2,199

375 750

3 6

1,000 2,000

1,000 2,000

375 750

250 500

2,199 1,100

Page 39 of 76 LTI

750 375

750 1,500

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

750 1,500

750

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration NORTHERN SAMAR

1,500 750

791 1,582

2,000

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration LEYTE

791 1,582

7,949 2,000

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration EASTERN SAMAR

1,582 791

250 500

6

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration VIII BILIRAN

250 500

750

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration SIQUIJOR

500 250

250 500

1,500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration NEGROS ORIENTAL

250 500

3,838 1,582

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration CEBU

500 250

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration VII BOHOL

4TH

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration NEGROS OCCIDENTAL SOUTH

3RD

1,100 2,199

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) WESTERN SAMAR

-

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

250

1,386 482

349

151

359

753

815

1,401 345

250

553

500

-

17

-

250

362

472

MISAMIS ORIENTAL

141

500 250

250 500

1,000 500

500 1,000

33 17

17 33

500 250

250 500

944 472

472 944

2,000 1,000

1,000 2,000

815 1,630

250 500

500 1,000

17 33

250 500

472 944

2,000 1,000

Page 40 of 76 LTI

815 1,630

944

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

1,630 815

359 717

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration MISAMIS OCCIDENTAL

359 717

33

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration LANAO DEL NORTE

717 359

349 697

1,000

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration CAMIGUIN

349 697

4,977 500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration BUKIDNON SOUTH

697 349

250 500

1,630

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration X BUKIDNON NORTH

250 500

717

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration ZAMBOANGA DEL SUR

500 250

3,044 697

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration ZAMBOANGA DEL NORTE

4TH

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration IX SIBUGAY

3RD

1,000

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) XI COMPOSTELA VALLEY

2,699 543

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

200

-

900

1,364

750

696

612

96

250

16,772 8,353

1,006

74

688

1,456

928

6,889

966

5,296 -

Page 41 of 76 LTI

612 1,224

500 250

250 500

2,013 1,006

1,006 2,013

1,375 688

688 1,375

1,857 928

928 1,857

1,933 966

966 1,933

1,708 854

854 1,708

612 1,224

250 500

1,006 2,013

688 1,375

928 1,857

966 1,933

7,365 1,708 854

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

1,224 612

750 1,500

1,933

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration CARAGA AGUSAN DEL NORTE

750 1,500

1,857

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration SULTAN KUDARAT

1,500 750

900 1,800

1,375

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration SOUTH COTABATO

900 1,800

7,177 2,013

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration SARANGANI

1,800 900

200 400

500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration XII NORTH COTABATO

200 400

1,224

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration DAVAO ORIENTAL

400 200

1,500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration DAVAO DEL SUR

4TH

1,800

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration DAVAO DEL NORTE

3RD

5,424 400

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration DAVAO CITY

2ND

854 1,708

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) AGUSAN DEL SUR

373

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST 400

DINAGAT ISLAND

-

400 800

32 16

16 32

3,325 1,663

1,663 3,325

1,663

SURIGAO DEL SUR

247

1,500 750

750 1,500

750

-

897 448

448 897

448

-

-

-

-

-

-

-

-

-

-

-

-

TAWI-TAWI

-

-

-

Page 42 of 76 LTI

-

-

-

NATIONWIDE

-

-

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

448 897

-

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration SULU

750 1,500

-

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration MAGUINDANAO

1,663 3,325

897 897

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration LANAO DEL SUR

16 32

1,500

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration ARMM BASILAN

400 800

3,325

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

Support to Case Build-Up Activities for the Cancellation of CLOAs

800 400

16

4,676

4TH

32

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration SURIGAO DEL NORTE

3RD

800

Review, validate and redocument LHs and ARBs Conduct Survey Individual CLOA generation & registration

1.1

2ND

-

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

-

-

-

-

-

-

-

-

-

181 181

361 361

181 181 361

243 243

485 485

243 243 485

-

-

-

-

-

-

-

-

-

-

-

-

114 114

227 227

114 114 227

Redocumentation of Distributed But Not YetTO Documented (DNYD) LAND2.TENURE INSTRUMENTS AWARDED LANDLESS and DNYP-DBP Lands 2.1 DNYD lands

Area redocumented, in PHILIPPINES hectares CAR ABRA

18,784 846 -

CF Redocumentation including field investigation Conduct survey field work CF Processing APAYAO

-

CF Redocumentation including field investigation Conduct survey field work CF Processing BENGUET

-

CF Redocumentation including field investigation Conduct survey field work CF Processing IFUGAO

361

CF Redocumentation including field investigation Conduct survey field work CF Processing KALINGA

485

CF Redocumentation including field investigation Conduct survey field work CF Processing MOUNTAIN PROVINCE

-

CF Redocumentation including field investigation Conduct survey field work CF Processing I ILOCOS NORTE

227 -

CF Redocumentation including field investigation Conduct survey field work CF Processing ILOCOS SUR

-

CF Redocumentation including field investigation Conduct survey field work CF Processing LA UNION

-

CF Redocumentation including field investigation Conduct survey field work CF Processing PANGASINAN CF Redocumentation including field investigation Conduct survey field work CF Processing

Page 43 of 76 LTI

227

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) II BATANES

3RD

4TH

-

-

-

250 250

500 500

250 250 500

250 250

500 500

250 250 500

95 95

189 189

95 95 189

18 18

36 36

18 18 36

12 12

23 23

12 12 23

70 70

140 140

70 70 140

38 38

76 76

38 38 76

50 50

100 100

50 50 100

-

-

-

-

-

-

500

CF Redocumentation including field investigation Conduct survey field work CF Processing NUEVA VIZCAYA

2ND

500

CF Redocumentation including field investigation Conduct survey field work CF Processing ISABELA

1ST

1,225 -

CF Redocumentation including field investigation Conduct survey field work CF Processing CAGAYAN

CY 2013 QUARTERLY PHYSICAL TARGETS

189

CF Redocumentation including field investigation Conduct survey field work CF Processing QUIRINO

36

CF Redocumentation including field investigation Conduct survey field work CF Processing III AURORA

469 23

CF Redocumentation including field investigation Conduct survey field work CF Processing BATAAN

140

CF Redocumentation including field investigation Conduct survey field work CF Processing BULACAN

76

CF Redocumentation including field investigation Conduct survey field work CF Processing NUEVA ECIJA NORTH

100

CF Redocumentation including field investigation Conduct survey field work CF Processing NUEVA ECIJA SOUTH

-

CF Redocumentation including field investigation Conduct survey field work CF Processing PAMPANGA CF Redocumentation including field investigation Conduct survey field work CF Processing Page 44 of 76 LTI

-

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) TARLAC

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

ZAMBALES

33 33

66 66

33 33 66

32 32

64 64

32 32 64

94 94

188 188

94 94 188

108 108

215 215

108 108 215

9 9

18 18

9 9 18

64

CF Redocumentation including field investigation Conduct survey field work CF Processing 859 188

CF Redocumentation including field investigation Conduct survey field work CF Processing CAVITE

215

CF Redocumentation including field investigation Conduct survey field work CF Processing LAGUNA

18

CF Redocumentation including field investigation Conduct survey field work CF Processing QUEZON I

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

QUEZON II

-

-

73 73

145 145

73 73 145

147 147

293 293

147 147 293

-

-

-

88 88

175 175

88 88 175

551 551

1,102 1,102

551 551 1,102

145

CF Redocumentation including field investigation Conduct survey field work CF Processing RIZAL

293

CF Redocumentation including field investigation Conduct survey field work CF Processing IV-B MARINDUQUE

1,277 -

CF Redocumentation including field investigation Conduct survey field work CF Processing OCCIDENTAL MINDORO

175

CF Redocumentation including field investigation Conduct survey field work CF Processing ORIENTAL MINDORO CF Redocumentation including field investigation Conduct survey field work CF Processing Page 45 of 76 LTI

4TH

66

CF Redocumentation including field investigation Conduct survey field work CF Processing

IV-A BATANGAS

3RD

1,102

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) PALAWAN

ANTIQUE

Page 46 of 76 LTI

-

250 250

500 500

250 250 500

50 50

100 100

50 50 100

125 125

250 250

125 125 250

125 125

250 250

125 125 250

59 59

118 118

59 59 118

250 250

500 500

250 250 500

250 250

500 500

250 250 500

75 75

150 150

75 75 150

50 50

100 100

50 50 100

2,350 150

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

-

500

CF Redocumentation including field investigation Conduct survey field work CF Processing VI AKLAN

-

500

CF Redocumentation including field investigation Conduct survey field work CF Processing SORSOGON

-

118

CF Redocumentation including field investigation Conduct survey field work CF Processing MASBATE

-

250

CF Redocumentation including field investigation Conduct survey field work CF Processing CATNADUANES

-

250

CF Redocumentation including field investigation Conduct survey field work CF Processing CAMARINES SUR B

4TH

100

CF Redocumentation including field investigation Conduct survey field work CF Processing CAMARINES SUR A

3RD

2,218 500

CF Redocumentation including field investigation Conduct survey field work CF Processing CAMARINES NORTE

2ND

-

CF Redocumentation including field investigation Conduct survey field work CF Processing V ALBAY

1ST

-

CF Redocumentation including field investigation Conduct survey field work CF Processing ROMBLON

CY 2013 QUARTERLY PHYSICAL TARGETS

100

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) CAPIZ

EASTERN SAMAR

Page 47 of 76 LTI

50 50 100

250 250

500 500

250 250 500

250 250

500 500

250 250 500

250 250

500 500

250 250 500

50 50

100 100

50 50 100

75 75

150 150

75 75 150

125 125

250 250

125 125 250

8 8

15 15

8 8 15

126 126

252 252

126 126 252

149 149

297 297

149 149 297

1,909 252

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

100 100

15

CF Redocumentation including field investigation Conduct survey field work CF Processing VIII BILIRAN

50 50

250

CF Redocumentation including field investigation Conduct survey field work CF Processing SIQUIJOR

250 250 500

150

CF Redocumentation including field investigation Conduct survey field work CF Processing NEGROS ORIENTAL

500 500

515 100

CF Redocumentation including field investigation Conduct survey field work CF Processing CEBU

250 250

500

CF Redocumentation including field investigation Conduct survey field work CF Processing VII BOHOL

4TH

500

CF Redocumentation including field investigation Conduct survey field work CF Processing NEGROS OCCIDENTAL SOUTH

3RD

500

CF Redocumentation including field investigation Conduct survey field work CF Processing NEGROS OCCIDENTAL NORTH

2ND

100

CF Redocumentation including field investigation Conduct survey field work CF Processing ILOILO

1ST

500

CF Redocumentation including field investigation Conduct survey field work CF Processing GUIMARAS

CY 2013 QUARTERLY PHYSICAL TARGETS

297

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) LEYTE

2ND

500 500

250 250 500

125 125

250 250

125 125 250

55 55

110 110

55 55 110

250 250

500 500

250 250 500

250 250

500 500

250 250 500

50 50

100 100

50 50 100

50 50

100 100

50 50 100

500 500

1,000 1,000

500 500 1,000

-

-

110

500

CF Redocumentation including field investigation Conduct survey field work CF Processing IX SIBUGAY

700 500

CF Redocumentation including field investigation Conduct survey field work CF Processing ZAMBOANGA DEL NORTE

100

CF Redocumentation including field investigation Conduct survey field work CF Processing ZAMBOANGA DEL SUR

100

CF Redocumentation including field investigation Conduct survey field work CF Processing X BUKIDNON NORTH

1,758 1,000

CF Redocumentation including field investigation Conduct survey field work CF Processing BUKIDNON SOUTH

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

CAMIGUIN

8

CF Redocumentation including field investigation Conduct survey field work CF Processing LANAO DEL NORTE CF Redocumentation including field investigation Conduct survey field work CF Processing Page 48 of 76 LTI

4TH

250 250

CF Redocumentation including field investigation Conduct survey field work CF Processing WESTERN SAMAR

3RD

250

CF Redocumentation including field investigation Conduct survey field work CF Processing SOUTHERN LEYTE

1ST

500

CF Redocumentation including field investigation Conduct survey field work CF Processing NORTHERN SAMAR

CY 2013 QUARTERLY PHYSICAL TARGETS

4 4

8 8

4 4 8

250 250

500 500

250 250 500

500

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) MISAMIS OCCIDENTAL

SULTAN KUDARAT

Page 49 of 76 LTI

75 75 150

250 250

500 500

250 250 500

50 50

100 100

50 50 100

50 50

100 100

50 50 100

250 250

500 500

250 250 500

50 50

100 100

50 50 100

250 250

500 500

250 250 500

250 250

500 500

250 250 500

125 125

250 250

125 125 250

50 50

100 100

50 50 100

250

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

150 150

500

CF Redocumentation including field investigation Conduct survey field work CF Processing SOUTH COTABATO

75 75

1,350 500

CF Redocumentation including field investigation Conduct survey field work CF Processing SARANGANI

50 50 100

100

CF Redocumentation including field investigation Conduct survey field work CF Processing XII NORTH COTABATO

100 100

500

CF Redocumentation including field investigation Conduct survey field work CF Processing DAVAO ORIENTAL

50 50

100

CF Redocumentation including field investigation Conduct survey field work CF Processing DAVAO DEL SUR

4TH

100

CF Redocumentation including field investigation Conduct survey field work CF Processing DAVAO DEL NORTE

3RD

1,300 500

CF Redocumentation including field investigation Conduct survey field work CF Processing DAVAO CITY

2ND

150

CF Redocumentation including field investigation Conduct survey field work CF Processing XI COMPOSTELA VALLEY

1ST

100

CF Redocumentation including field investigation Conduct survey field work CF Processing MISAMIS ORIENTAL

CY 2013 QUARTERLY PHYSICAL TARGETS

100

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

CARAGA AGUSAN DEL NORTE

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

4TH

1,234 100

CF Redocumentation including field investigation Conduct survey field work CF Processing AGUSAN DEL SUR

3RD

50 50

100 100

50 50 100

250 250

500 500

250 250 500

11 11

21 21

11 11 21

307 307

613 613

307 307 613

-

-

-

274 274

547 547

274 274 547

-

-

-

-

-

-

-

-

-

137

137

137

500

CF Redocumentation including field investigation Conduct survey field work CF Processing DINAGAT ISLAND CF Redocumentation including field investigation Conduct survey field work CF Processing

-

SURIGAO DEL NORTE

21

CF Redocumentation including field investigation Conduct survey field work CF Processing SURIGAO DEL SUR

613

CF Redocumentation including field investigation Conduct survey field work CF Processing ARMM BASILAN

547 -

LANAO DEL SUR

547

-

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing MAGUINDANAO

-

CF Redocumentation including field investigation Conduct survey field work CF Processing SULU

-

CF Redocumentation including field investigation Conduct survey field work CF Processing TAWI-TAWI

-

CF Redocumentation including field investigation Conduct survey field work CF Processing 2.2

Reconstitution of titles

No. of titles

Nationwide

Page 50 of 76 LTI

547

137

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS 2.3 DNYP-DBP Lands LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) Area redocumented, in PHILIPPINES hectares CAR ABRA

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

-

-

-

19,935 -

CF Redocumentation including field investigation Conduct survey field work CF Processing

APAYAO

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

BENGUET

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

IFUGAO

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

KALINGA

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

MOUNTAIN PROVINCE

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

I ILOCOS NORTE

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

ILOCOS SUR

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

LA UNION CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

PANGASINAN CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

Page 51 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) II BATANES

3,713

CAGAYAN

1,106

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

553

1,106

553 1,106

ISABELA

2,607

CF Redocumentation including field investigation Conduct survey field work CF Processing

1,304

2,607

1,304 2,607

NUEVA VIZCAYA

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

QUIRINO

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

III AURORA

1,704 241

CF Redocumentation including field investigation Conduct survey field work CF Processing

121

241

121 241

BATAAN

184

CF Redocumentation including field investigation Conduct survey field work CF Processing

92

184

92 184

BULACAN

129

CF Redocumentation including field investigation Conduct survey field work CF Processing

65

129

65 129

NUEVA ECIJA NORTH

587

CF Redocumentation including field investigation Conduct survey field work CF Processing

294

587

294 587

NUEVA ECIJA SOUTH

314

CF Redocumentation including field investigation Conduct survey field work CF Processing

157

314

157 314

PAMPANGA CF Redocumentation including field investigation Conduct survey field work CF Processing

136 68

136

68 136

Page 52 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) TARLAC

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

-

-

-

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

ZAMBALES

113

CF Redocumentation including field investigation Conduct survey field work CF Processing

57

113

57 113

IV-A BATANGAS

883 -

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

CAVITE CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

LAGUNA CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

QUEZON I

196

CF Redocumentation including field investigation Conduct survey field work CF Processing

98

196

98 196

QUEZON II

687

CF Redocumentation including field investigation Conduct survey field work CF Processing

344

687

344 687

RIZAL CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

IV-B MARINDUQUE

1,340 89

CF Redocumentation including field investigation Conduct survey field work CF Processing

45

89

45 89

OCCIDENTAL MINDORO

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

ORIENTAL MINDORO CF Redocumentation including field investigation Conduct survey field work CF Processing

347 174

347

174 347

Page 53 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) PALAWAN

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

904

CF Redocumentation including field investigation Conduct survey field work CF Processing

452

904

452 904

ROMBLON

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

V ALBAY

2,116 453

CF Redocumentation including field investigation Conduct survey field work CF Processing

227

453

227 453

CAMARINES NORTE

181

CF Redocumentation including field investigation Conduct survey field work CF Processing

91

181

91 181

CAMARINES SUR A

112

CF Redocumentation including field investigation Conduct survey field work CF Processing

56

112

56 112

CAMARINES SUR B

112

CF Redocumentation including field investigation Conduct survey field work CF Processing

56

112

56 112

CATANDUANES

19

CF Redocumentation including field investigation Conduct survey field work CF Processing

10

19

10 19

MASBATE

1,239

CF Redocumentation including field investigation Conduct survey field work CF Processing

620

1,239

620 1,239

SORSOGON

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

VI AKLAN

1,347 146

CF Redocumentation including field investigation Conduct survey field work CF Processing

73

146

73 146

ANTIQUE CF Redocumentation including field investigation Conduct survey field work CF Processing

37 19

37

19 37

Page 54 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) CAPIZ

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

84

CF Redocumentation including field investigation Conduct survey field work CF Processing

42

84

42 84

GUIMARAS

66

CF Redocumentation including field investigation Conduct survey field work CF Processing

33

66

33 66

ILOILO

647

CF Redocumentation including field investigation Conduct survey field work CF Processing

324

647

324 647

NEGROS OCCIDENTAL NORTH

184

CF Redocumentation including field investigation Conduct survey field work CF Processing

92

184

92 184

NEGROS OCCIDENTAL SOUTH

184

CF Redocumentation including field investigation Conduct survey field work CF Processing

92

184

92 184

VII BOHOL

752 219

CF Redocumentation including field investigation Conduct survey field work CF Processing

110

219

110 219

CEBU

132

CF Redocumentation including field investigation Conduct survey field work CF Processing

66

132

66 132

NEGROS ORIENTAL

401

CF Redocumentation including field investigation Conduct survey field work CF Processing

201

401

201 401

SIQUIJOR

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

VIII BILIRAN

766 -

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

EASTERN SAMAR CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

Page 55 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) LEYTE

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

-

-

-

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

NORTHERN SAMAR

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

SOUTHERN LEYTE

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

WESTERN SAMAR

766

CF Redocumentation including field investigation Conduct survey field work CF Processing

383

766

383 766

IX SIBUGAY

2,327 420

CF Redocumentation including field investigation Conduct survey field work CF Processing

210

420

210 420

ZAMBOANGA DEL NORTE

141

CF Redocumentation including field investigation Conduct survey field work CF Processing

71

141

71 141

ZAMBOANGA DEL SUR

1,766

CF Redocumentation including field investigation Conduct survey field work CF Processing

883

1,766

883 1,766

X BUKIDNON NORTH

294 -

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

BUKIDNON SOUTH

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

CAMIGUIN CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

LANAO DEL NORTE CF Redocumentation including field investigation Conduct survey field work CF Processing

294 147

294

147 294

Page 56 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) MISAMIS OCCIDENTAL

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

-

-

-

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

MISAMIS ORIENTAL

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

XI COMPOSTELA VALLEY

718 320

CF Redocumentation including field investigation Conduct survey field work CF Processing

160

320

160 320

DAVAO CITY

104

CF Redocumentation including field investigation Conduct survey field work CF Processing

52

104

52 104

DAVAO DEL NORTE

192

CF Redocumentation including field investigation Conduct survey field work CF Processing

96

192

96 192

DAVAO DEL SUR

72

CF Redocumentation including field investigation Conduct survey field work CF Processing

36

72

36 72

DAVAO ORIENTAL

30

CF Redocumentation including field investigation Conduct survey field work CF Processing

15

30

15 30

XII NORTH COTABATO

936 713

CF Redocumentation including field investigation Conduct survey field work CF Processing

357

713

357 713

SARANGANI

42

CF Redocumentation including field investigation Conduct survey field work CF Processing

21

42

21 42

SOUTH COTABATO

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

SULTAN KUDARAT CF Redocumentation including field investigation Conduct survey field work CF Processing

181 91

181

91 181

Page 57 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) CARAGA AGUSAN DEL NORTE

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

3,008 64

CF Redocumentation including field investigation Conduct survey field work CF Processing

32

64

32 64

AGUSAN DEL SUR

2,789

CF Redocumentation including field investigation Conduct survey field work CF Processing

1,395

2,789

1,395 2,789

DINAGAT ISLAND

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

SURIGAO DEL NORTE

11

CF Redocumentation including field investigation Conduct survey field work CF Processing

6

11

6 11

SURIGAO DEL SUR

144

CF Redocumentation including field investigation Conduct survey field work CF Processing

72

144

72 144

ARMM BASILAN

31 31

CF Redocumentation including field investigation Conduct survey field work CF Processing

16

31

16 31

LANAO DEL SUR

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

MAGUINDANAO CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

SULU CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

TAWI-TAWI CF Redocumentation including field investigation Conduct survey field work CF Processing

-

-

-

Page 58 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS 2.4 Final Survey Documentation of OLT Lands LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) Area redocumented, in PHILIPPINES hectares CAR ABRA

1ST

2ND

3RD

4TH

-

-

-

102 102

51 51 102

-

-

24,942 297 -

CF Redocumentation including field investigation Conduct survey field work CF Processing APAYAO

CY 2013 QUARTERLY PHYSICAL TARGETS

102

CF Redocumentation including field investigation Conduct survey field work CF Processing

51 51 BENGUET

-

CF Redocumentation including field investigation Conduct survey field work CF Processing

IFUGAO

56

CF Redocumentation including field investigation Conduct survey field work CF Processing KALINGA

28 28 56

51 51

102 102

51 51 102

18 18

36 36

18 18 36

36

CF Redocumentation including field investigation Conduct survey field work CF Processing I ILOCOS NORTE

56 56

102

CF Redocumentation including field investigation Conduct survey field work CF Processing MOUNTAIN PROVINCE

28 28

1,108 -

CF Redocumentation including field investigation Conduct survey field work CF Processing

ILOCOS SUR

PANGASINAN

Page 59 of 76 LTI

36 36

73 73

36 36 73

18 18

35 35

18 18 35

500 500

1,000 1,000

500 500 1,000

35

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

-

73

CF Redocumentation including field investigation Conduct survey field work CF Processing LA UNION

-

1,000

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) II BATANES

PAMPANGA

Page 60 of 76 LTI

500 500 1,000

1,500 1,500

3,000 3,000

1,500 1,500 3,000

54 54

108 108

54 54 108

107 107

214 214

107 107 214

36 36

71 71

36 36 71

76 76

152 152

76 76 152

178 178

355 355

178 178 355

750 750

1,500 1,500

750 750 1,500

750 750

1,500 1,500

750 750 1,500

253 253

505 505

253 253 505

1,500

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

1,000 1,000

1,500

CF Redocumentation including field investigation Conduct survey field work CF Processing NUEVA ECIJA SOUTH

500 500

355

CF Redocumentation including field investigation Conduct survey field work CF Processing NUEVA ECIJA NORTH

-

152

CF Redocumentation including field investigation Conduct survey field work CF Processing BULACAN

-

4,460 71

CF Redocumentation including field investigation Conduct survey field work CF Processing BATAAN

-

214

CF Redocumentation including field investigation Conduct survey field work CF Processing III AURORA

4TH

108

CF Redocumentation including field investigation Conduct survey field work CF Processing QUIRINO

3RD

3,000

CF Redocumentation including field investigation Conduct survey field work CF Processing NUEVA VIZCAYA

2ND

1,000

CF Redocumentation including field investigation Conduct survey field work CF Processing ISABELA

1ST

4,323 -

CF Redocumentation including field investigation Conduct survey field work CF Processing CAGAYAN

CY 2013 QUARTERLY PHYSICAL TARGETS

505

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) TARLAC

ORIENTAL MINDORO

Page 61 of 76 LTI

39 39 77

32 32

64 64

32 32 64

54 54

108 108

54 54 108

54 54

107 107

54 54 107

55 55

110 110

55 55 110

56 56

111 111

56 56 111

0 0

1 1

0 0 1

4 4

9 9

4 4 9

150 150

300 300

150 150 300

100 100

200 200

100 100 200

300

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

77 77

861 9

CF Redocumentation including field investigation Conduct survey field work CF Processing OCCIDENTAL MINDORO

39 39

1

CF Redocumentation including field investigation Conduct survey field work CF Processing IV-B MARINDUQUE

150 150 300

111

CF Redocumentation including field investigation Conduct survey field work CF Processing RIZAL

300 300

110

CF Redocumentation including field investigation Conduct survey field work CF Processing QUEZON II

150 150

107

CF Redocumentation including field investigation Conduct survey field work CF Processing QUEZON I

4TH

108

CF Redocumentation including field investigation Conduct survey field work CF Processing LAGUNA

3RD

501 64

CF Redocumentation including field investigation Conduct survey field work CF Processing CAVITE

2ND

77

CF Redocumentation including field investigation Conduct survey field work CF Processing IV-A BATANGAS

1ST

300

CF Redocumentation including field investigation Conduct survey field work CF Processing ZAMBALES

CY 2013 QUARTERLY PHYSICAL TARGETS

200

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) PALAWAN

1ST

2ND

346 346 -

173 173 346

3 3

7 7

3 3 7

100 100

200 200

100 100 200

110 110

220 220

110 110 220

250 250

500 500

250 250 500

250 250

500 500

250 250 500

90 90

179 179

90 90 179

125 125

250 250

125 125 250

130 130

260 260

130 130 260

-

-

-

7

2,109 200

CF Redocumentation including field investigation Conduct survey field work CF Processing CAMARINES NORTE

220

CF Redocumentation including field investigation Conduct survey field work CF Processing CAMARINES SUR A

500

CF Redocumentation including field investigation Conduct survey field work CF Processing CAMARINES SUR B

500

CF Redocumentation including field investigation Conduct survey field work CF Processing CATANDUANES

179

CF Redocumentation including field investigation Conduct survey field work CF Processing MASBATE

250

CF Redocumentation including field investigation Conduct survey field work CF Processing SORSOGON

260

CF Redocumentation including field investigation Conduct survey field work CF Processing VI AKLAN

1,481 0

CF Redocumentation including field investigation Conduct survey field work CF Processing ANTIQUE CF Redocumentation including field investigation Conduct survey field work CF Processing

19 10 10

Page 62 of 76 LTI

4TH

173 173

CF Redocumentation including field investigation Conduct survey field work CF Processing V ALBAY

3RD

346

CF Redocumentation including field investigation Conduct survey field work CF Processing ROMBLON

CY 2013 QUARTERLY PHYSICAL TARGETS

19 19

10 10 19

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) CAPIZ

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND 25 25

50 50

25 25 50

56 56

112 112

56 56 112

250 250

500 500

250 250 500

200 200

400 400

200 200 400

200 200

400 400

200 200 400

64 64

128 128

64 64 128

90 90

180 180

90 90 180

250 250

500 500

250 250 500

-

-

-

-

-

-

112

CF Redocumentation including field investigation Conduct survey field work CF Processing ILOILO

500

CF Redocumentation including field investigation Conduct survey field work CF Processing NEGROS OCCIDENTAL NORTH

400

CF Redocumentation including field investigation Conduct survey field work CF Processing NEGROS OCCIDENTAL SOUTH

400

CF Redocumentation including field investigation Conduct survey field work CF Processing VII BOHOL

808 128

CF Redocumentation including field investigation Conduct survey field work CF Processing CEBU

180

CF Redocumentation including field investigation Conduct survey field work CF Processing NEGROS ORIENTAL

500

CF Redocumentation including field investigation Conduct survey field work CF Processing SIQUIJOR

0

CF Redocumentation including field investigation Conduct survey field work CF Processing VIII BILIRAN

620 -

CF Redocumentation including field investigation Conduct survey field work CF Processing EASTERN SAMAR CF Redocumentation including field investigation Conduct survey field work CF Processing

9 4 4

Page 63 of 76 LTI

4TH

50

CF Redocumentation including field investigation Conduct survey field work CF Processing GUIMARAS

3RD

9 9

4 4 9

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) LEYTE

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

NORTHERN SAMAR

250 250

500 500

250 250 500

6 6

11 11

6 6 11

11

CF Redocumentation including field investigation Conduct survey field work CF Processing -

CF Redocumentation including field investigation Conduct survey field work CF Processing

WESTERN SAMAR

LANAO DEL NORTE

Page 64 of 76 LTI

200 200

100 100 200

107 107

214 214

107 107 214

100 100

200 200

100 100 200

250 250

500 500

250 250 500

250 250 -

500 500 -

250 250 500

1 1

1 1

1 1 1

69 69

137 137

69 69 137

1

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

100 100

500

CF Redocumentation including field investigation Conduct survey field work CF Processing CAMIGUIN

50 50 100

1,467 500

CF Redocumentation including field investigation Conduct survey field work CF Processing BUKIDNON SOUTH

100 100

200

CF Redocumentation including field investigation Conduct survey field work CF Processing X BUKIDNON NORTH

50 50

214

CF Redocumentation including field investigation Conduct survey field work CF Processing ZAMBOANGA DEL SUR

-

614 200

CF Redocumentation including field investigation Conduct survey field work CF Processing ZAMBOANGA DEL NORTE

-

100

CF Redocumentation including field investigation Conduct survey field work CF Processing IX SIBUGAY

4TH

500

CF Redocumentation including field investigation Conduct survey field work CF Processing

SOUTHERN LEYTE

3RD

137

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) MISAMIS OCCIDENTAL

SULTAN KUDARAT

Page 65 of 76 LTI

136 136 271

150 150

300 300

150 150 300

12 12

24 24

12 12 24

150 150

300 300

150 150 300

100 100

200 200

100 100 200

154 154

308 308

154 154 308

600 600

1,200 1,200

600 600 1,200

7 7

15 15

7 7 15

500 500

1,000 1,000

500 500 1,000

500 500

1,000 1,000

500 500 1,000

1,000

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

271 271

15

CF Redocumentation including field investigation Conduct survey field work CF Processing SOUTH COTABATO

136 136

3,215 1,200

CF Redocumentation including field investigation Conduct survey field work CF Processing SARANGANI

29 29 58

308

CF Redocumentation including field investigation Conduct survey field work CF Processing XII NORTH COTABATO

58 58

200

CF Redocumentation including field investigation Conduct survey field work CF Processing DAVAO ORIENTAL

29 29

300

CF Redocumentation including field investigation Conduct survey field work CF Processing DAVAO DEL SUR

4TH

24

CF Redocumentation including field investigation Conduct survey field work CF Processing DAVAO DEL NORTE

3RD

1,132 300

CF Redocumentation including field investigation Conduct survey field work CF Processing DAVAO CITY

2ND

271

CF Redocumentation including field investigation Conduct survey field work CF Processing XI COMPOSTELA VALLEY

1ST

58

CF Redocumentation including field investigation Conduct survey field work CF Processing MISAMIS ORIENTAL

CY 2013 QUARTERLY PHYSICAL TARGETS

1,000

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) CARAGA AGUSAN DEL NORTE

1ST

2ND

3RD

4TH

574 200

CF Redocumentation including field investigation Conduct survey field work CF Processing AGUSAN DEL SUR

CY 2013 QUARTERLY PHYSICAL TARGETS

100 100

200 200

100 100 200

150 150

300 300

150 150 300

-

-

-

300

CF Redocumentation including field investigation Conduct survey field work CF Processing DINAGAT ISLAND CF Redocumentation including field investigation Conduct survey field work CF Processing SURIGAO DEL NORTE

0

CF Redocumentation including field investigation Conduct survey field work CF Processing SURIGAO DEL SUR

74

CF Redocumentation including field investigation Conduct survey field work CF Processing

37 37 ARMM BASILAN

TAWI-TAWI

Page 66 of 76 LTI

-

200 200

400 400

200 200 400

487 487

973 973

487 487 973

-

-

-

-

-

-

-

CF Redocumentation including field investigation Conduct survey field work CF Processing CF Redocumentation including field investigation Conduct survey field work CF Processing

-

973

CF Redocumentation including field investigation Conduct survey field work CF Processing SULU

400

CF Redocumentation including field investigation Conduct survey field work CF Processing MAGUINDANAO

37 37 74

1,373 -

CF Redocumentation including field investigation Conduct survey field work CF Processing LANAO DEL SUR

74 74

-

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

Generation of Land Distribution and Information Schedule (LDIS) LDIS forwarded to LBP LAND3.TENURE INSTRUMENTS AWARDED TO LANDLESS

PHILIPPINES CAR

126,576 102

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP 4

ABRA Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP APAYAO

-

BENGUET

-

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

31,642

31,646

31,646

31,643

26 26 26 26 1 1 1 1

26 26 26 26 1 1 1 1

26 26 26 26 1 1 1 1

26 26 26 26 1 1 1 1

25 25 25 25

25 25 25 25

25 25 25 25

25 25 25 25

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP IFUGAO

98

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP KALINGA

-

MOUNTAIN PROVINCE

-

I

-

ILOCOS NORTE

-

ILOCOS SUR

-

LA UNION

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies)

Page 67 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012)

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

Submission of LDIS to LBP LAND TENURE INSTRUMENTS AWARDED TO LANDLESS PANGASINAN

-

II

119

BATANES

-

CAGAYAN

-

ISABELA

-

NUEVA VIZCAYA

-

QUIRINO

119

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

30 30 30 30

30 30 30 30

30 30 30 30

30 30 30 30

30 30 30 30 552 552 552 552

30 30 30 30 552 552 552 552

30 30 30 30 552 552 552 552

30 30 30 30 552 552 552 552

100 100 100 100 99 99 99 99

100 100 100 100 99 99 99 99

100 100 100 100 99 99 99 99

100 100 100 100 99 99 99 99

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP III

2,208

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP AURORA

-

BATAAN

400

BULACAN

397

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

Page 68 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) NUEVA ECIJA NORTH

242

NUEVA ECIJA SOUTH

509

PAMPANGA

240

TARLAC

353

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP ZAMBALES

66

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP IV-A

474

BATANGAS

357

CAVITE

-

LAGUNA

118

QUEZON I

-

QUEZON II

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

61 61 61 61 127 127 127 127 60 60 60 60 88 88 88 88 17 17 17 17 119 119 119 119 89 89 89 89

61 61 61 61 127 127 127 127 60 60 60 60 88 88 88 88 17 17 17 17 119 119 119 119 89 89 89 89

61 61 61 61 127 127 127 127 60 60 60 60 88 88 88 88 17 17 17 17 119 119 119 119 89 89 89 89

61 61 61 61 127 127 127 127 60 60 60 60 88 88 88 88 17 17 17 17 119 119 119 119 89 89 89 89

29 29 29 29

29 29 29 29

29 29 29 29

29 29 29 29

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

Page 69 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) RIZAL

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP IV-B

21

3 5 5 5

1,525 1,525 1,525 1,525 520 520 520 520

7 5 5 5 1 1 1 1 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1,525 1,525 1,525 1,525 520 520 520 520

7 5 5 5 1 1 1 1 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1,525 1,525 1,525 1,525 520 520 520 520

1,525 1,525 1,525 1,525 520 520 520 520

124 247 247 247

124 247 247 247

124 247 247 247

124 247 247 247

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP MARINDUQUE

3

OCCIDENTAL MINDORO

6

ORIENTAL MINDORO

6

PALAWAN

4

ROMBLON

2

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP V

6,101

ALBAY

2,081

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP CAMARINES NORTE

-

CAMARINES SUR A

494

1 1 1 1 1 1 1 1 1 1 1 1

4 5 5 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

Page 70 of 76 LTI

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) CAMARINES SUR B

494

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP CATANDUANES

57

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP MASBATE

2,654

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP SORSOGON

321

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP VI

38,522

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP AKLAN

-

ANTIQUE

-

CAPIZ

504

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

124 247 247 247 14 14 14 14 664 664 664 664 80 80 80 80 9,631 9,631 9,631 9,631

124 247 247 247 14 14 14 14 664 664 664 664 80 80 80 80 9,631 9,631 9,631 9,631

124 247 247 247 14 14 14 14 664 664 664 664 80 80 80 80 9,631 9,631 9,631 9,631

124 247 247 247 14 14 14 14 664 664 664 664 80 80 80 80 9,631 9,631 9,631 9,631

126 126 126 126 14 14 14 14 1,262 1,262 1,262 1,262 4,114 8,228 8,228 8,228

126 126 126 126 14 14 14 14 1,262 1,262 1,262 1,262 4,114 8,228 8,228 8,228

126 126 126 126 14 14 14 14 1,262 1,262 1,262 1,262 4,114 8,228 8,228 8,228

126 126 126 126 14 14 14 14 1,262 1,262 1,262 1,262 4,114 8,228 8,228 8,228

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP GUIMARAS

55

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP ILOILO

5,049

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP NEGROS OCCIDENTAL NORTH Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

Page 71 of 76 LTI

16,457

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) NEGROS OCCIDENTAL SOUTH

16,457

VII

33,987

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP BOHOL

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

4,114 8,228 8,228 8,228 8,497 8,497 8,497 8,497

4,114 8,228 8,228 8,228 8,497 8,497 8,497 8,497

4,114 8,228 8,228 8,228 8,497 8,497 8,497 8,497

4,114 8,228 8,228 8,228 8,497 8,497 8,497 8,497

280 280 280 280 8,217 8,217 8,217 8,217

280 280 280 280 8,217 8,217 8,217 8,217

280 280 280 280 8,217 8,217 8,217 8,217

280 280 280 280 8,217 8,217 8,217 8,217

3,544 3,544 3,544 3,544

3,544 3,544 3,544 3,544

3,544 3,544 3,544 3,544

3,544 3,544 3,544 3,544

257 257 257 257

257 257 257 257

257 257 257 257

257 257 257 257

789 789 789 789

789 789 789 789

789 789 789 789

789 789 789 789

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP CEBU

1,119

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP NEGROS ORIENTAL

32,868

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP SIQUIJOR

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP VIII

14,176

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP BILIRAN

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP EASTERN SAMAR

1,029

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP LEYTE

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP NORTHERN SAMAR Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

Page 72 of 76 LTI

3,156

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) SOUTHERN LEYTE

4,285

WESTERN SAMAR

5,706

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP IX

746

SIBUGAY

-

ZAMBOANGA DEL NORTE

532

ZAMBOANGA DE SUR

214

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

1,071 1,071 1,071 1,071 1,426 1,426 1,426 1,426 186 186 186 186

1,071 1,071 1,071 1,071 1,426 1,426 1,426 1,426 186 186 186 186

1,071 1,071 1,071 1,071 1,426 1,426 1,426 1,426 186 186 186 186

1,071 1,071 1,071 1,071 1,426 1,426 1,426 1,426 186 186 186 186

133 133 133 133 53 53 53 53 1,952 1,952 1,952 1,952 429 429 429 429 133 133 133 133 8 8 8 8 1,046 1,046 1,046 1,046

133 133 133 133 53 53 53 53 1,952 1,952 1,952 1,952 429 429 429 429 133 133 133 133 8 8 8 8 1,046 1,046 1,046 1,046

133 133 133 133 53 53 53 53 1,952 1,952 1,952 1,952 429 429 429 429 133 133 133 133 8 8 8 8 1,046 1,046 1,046 1,046

133 133 133 133 53 53 53 53 1,952 1,952 1,952 1,952 429 429 429 429 133 133 133 133 8 8 8 8 1,046 1,046 1,046 1,046

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP X

7,808

NORTH BUKIDNON

1,717

SOUTH BUKIDNON

532

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP CAMIGUIN

33

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP LANAO DEL NORTE Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

Page 73 of 76 LTI

4,185

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) MISAMIS OCCIDENTAL

83

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP MISAMIS ORIENTAL

1,258

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP XI

11,324

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP COMPOSTELLA VALLEY

2,198

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP DAVAO CITY

690

DAVAO DEL NORTE

365

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP DAVAO ORIENTAL

1,209

DAVAO DEL SUR

6,860

XII

2,290

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP NORTH COTABATO

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

21 21 21 21 314 314 314 314 2,831 2,831 2,831 2,831 550 550 550 550 173 173 173 173 91 91 91 91 302 302 302 302 1,715 1,715 1,715 1,715 572 572 572 572

21 21 21 21 314 314 314 314 2,831 2,831 2,831 2,831 550 550 550 550 173 173 173 173 91 91 91 91 302 302 302 302 1,715 1,715 1,715 1,715 572 572 572 572

21 21 21 21 314 314 314 314 2,831 2,831 2,831 2,831 550 550 550 550 173 173 173 173 91 91 91 91 302 302 302 302 1,715 1,715 1,715 1,715 572 572 572 572

21 21 21 21 314 314 314 314 2,831 2,831 2,831 2,831 550 550 550 550 173 173 173 173 91 91 91 91 302 302 302 302 1,715 1,715 1,715 1,715 572 572 572 572

572 572 572 572

572 572 572 572

572 572 572 572

572 572 572 572

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP SARANGANI Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

Page 74 of 76 LTI

2,290

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) SOUTH COTABATO

-

SULTAN KUDARAT

-

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

4TH

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP CARAGA

5,946

AGUSAN DEL NORTE

1,274

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP AGUSAN DEL SUR

230

DINAGAT ISLAND

-

SURIGAO DEL NORTE

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

1,486 1,486 1,486 1,486 319 319 319 319 58 58 58 58

1,486 1,486 1,486 1,486 319 319 319 319 58 58 58 58

1,486 1,486 1,486 1,486 319 319 319 319 58 58 58 58

1,486 1,486 1,486 1,486 319 319 319 319 58 58 58 58

1,110 1,110 1,110 1,110 688 688 688 688 154 154 154 154 350 350 350 350

1,110 1,110 1,110 1,110 688 688 688 688 154 154 154 154 350 350 350 350

1,110 1,110 1,110 1,110 688 688 688 688 154 154 154 154 350 350 350 350

1,110 1,110 1,110 1,110 688 688 688 688 154 154 154 154 350 350 350 350

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP SURIGAO DEL SUR

4,441

ARMM

2,752

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP BASILAN

615

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP LANAO DEL SUR Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

Page 75 of 76 LTI

1,402

MAJOR FINAL OUTPUTS (MFOs)/PROGRAMS/ACTIVITIES/PROJECTS LAND TENURE INSTRUMENTS AWARDED TO LANDLESS

PREVIOUS YEAR PERFORMANCE CY 2013 ACCOMPLISHME INDICATORS REGION/PROVINC PHYSICAL NTS (PIs) E TARGETS (2012) MAGUINDANAO

735

SULU

-

TAWI-TAWI

-

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP

CY 2013 QUARTERLY PHYSICAL TARGETS

1ST

2ND

3RD

184 184 184 184

184 184 184 184

184 184 184 184

2,976

2,976

2,977

4TH 184 184 184 184

Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP Gathering of information/supporting documents Preparation/generation of LDIS (4 copies) Submission of LDIS to LBP 4.

Installation of Uninstalled Farmer Beneficiaries

Farmer Beneficiaries installed NATIONWIDE

Page 76 of 76 LTI

2,128

8,929

-

2013 LTI BED No. 2 By Province.pdf

There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 2013 LTI BED ...

468KB Sizes 3 Downloads 171 Views

Recommend Documents

2013 PBD BED No. 2 by Province 022613 ALDA.pdf
There was a problem loading more pages. Retrying... 2013 PBD BED No. 2 by Province 022613 ALDA.pdf. 2013 PBD BED No. 2 by Province 022613 ALDA.pdf.

BED No. 2 FY 2015 Physical Plan.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. BED No.

BED 2013 (Physical Plan).pdf
Sign in. Page. 1. /. 2. Loading… Page 1 of 2. Page 1 of 2. Page 2 of 2. Page 2 of 2. BED 2013 (Physical Plan).pdf. BED 2013 (Physical Plan).pdf. Open. Extract. Open with. Sign In. Main menu. Displaying BED 2013 (Physical Plan).pdf. Page 1 of 2.

2012 BED 2 Final AJD.pdf
ENT. AGRARIAN JUSTICE DELIVERY (AJD). KEY MAJOR PROGRAMS/PROJECTS/ACTIVITIES. TARLAC 330 107 107 107 107 428. ZAMBALES 31 40 40 40 ...

2012 BED 2 Final LTI.pdf
... 75 - - SURVEY - 75 75 75 - CF PROCESSING - - - - CF VALUATION - - 75 - CLOA GEN/REG 271 - - - 75. LTI - page 4. Page 4 of 99. 2012 BED 2 Final LTI.pdf.

2012 BED 2 Final PBD.pdf
Page 4 of 251. 2012 BED 2 Final PBD.pdf. 2012 BED 2 Final PBD.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying 2012 BED 2 Final PBD.pdf.

2012 BED 2 Final LTI.pdf
MOUNTAIN PROVINCE - -. CF DOC - - - - SURVEY ... GEN/REG 905 - - - 1,040. ZAMBALES 271 75 75 .... 2012 BED 2 Final LTI.pdf. 2012 BED 2 Final LTI.pdf.

2.1) (LtI) (WLPro).pdf
Page 2 of 2. NINJA (LTI). (BASE CLASS) ? Table X.X: Ninja. Level BAB Fort Ref Will Def Init Lifestyle Legend Abilities. 1 +0 +0 +2 +1 +2 +1 +0 +1 Get in, get out; ...

Watch No Bed Of Roses (2017) Full Movie Online Free ...
Page 1. Whoops! There was a problem loading more pages. Retrying... Watch No Bed Of Roses (2017) Full Movie Online Free .Mp4______________.pdf.

[2] Nora Roberts - Bed of Roses.pdf
“That's the plan.” “Wait.” Mac leaned in, grabbed a jacket, then pulled the door closed behind her. “I didn't have anything. but coffee yet, so . . .” As they fell into ...

[2] Nora Roberts - Bed of Roses.pdf
All the varied rooflines, the arching windows, the lacy balconies added up. to elegant charm. And really, the entrance portico was made for crowding with lush ...

Bed Spl 2 Sem Jul 17.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Bed Spl 2 Sem ...

JC No. 2013-1 March 15, 2013.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. JC No. 2013-1 March 15, 2013.pdf. JC No. 2013-1 March 15, 2013.pdf. Open. Extract. Open with. Sign In. Main

R05 Set No. 2
(b) Discuss in detail the basic combinations of security associations? [4+12] · 2. (a) Differentiate between Public key cryptography and Digital signature with rel-.

R07 Set No. 2
2. III B.Tech I Semester Supplementary Examinations,June 2010 ... [16] · 3. Explain the different methods of sludge disposal and role of sludge as fertilizer. [16].

R05 Set No. 2
Set No. 2. III B.Tech II Semester Supplementary Examinations,May 2010 ... 1. It is required to transmit telephone messages across the United States, a 3000.

R07 Set No. 2
u is the velocity in metre per sec at a distance of y meters above the plate, · determine the ... Data: · Cross sectional area of the packed column tube = 0.09 m2.

R07 Set No. 2
Answer any FIVE Questions · All Questions carry equal marks · ***** · 1. State and apply Biot-Savart law to find velocity induced at a point by an infinite.

R09 Set No. 2
for this gases/ lb mol between the bottom and the top of the stack. .... at 750 mmHg of pressure, given that latent heat of vaporization is 88.4 cal/g. (R=1.987 ...

R05 Set No. 2
If the base current is changed by 0.2 mA, calculate the change in collector current. [3+8+5]. 7. (a) Classify timers according to the function and the techniques ...

R07 Set No. 2
Briefly explain two fundamentally different ways in which a cell might control the ... Explain metabolic flux analysis of citric acid fermentation of Candida lipolytica.

R07 Set No. 2
Explain the working principle behind · scanning beam thermometer with a schematic. What are the different applications · of scanning beam thermometer? [16].