AMENDMENT NO 01 DATED: September 26, 2014

REQUEST FOR PROPOSALS (RFP) IRG/PDP/T2/COM/CSC/PESCO/2014/183 Renovation of Customer Services Centers of Peshawar Electricity Supply Company (PESCO) Peshawar Circle, Pakistan All prospective bidders, The purposes of this Amendment No. 01 to Request for Proposals (RFP) No. IRG/PDP/T2/COM/CSC/PESCO/2014/183 for renovation of customer services centers of Peshawar electricity supply company (PESCO) Peshawar Circle, Pakistan is to 1) correct the RFP title 2) extend the proposal submission deadline, and 3) provide answers to questions submitted by prospective bidders. 1. The questions submitted by prospective bidders are hereby answered as follows; S. No.

Question “Granite flooring/Spanish tiling” needs further elaboration since there is a range of granite tiles in different price & quality ranges available.

1

2

3

4

Any guidance on Kitchen floor tile size if we may have overlooked? “Providing and fixing of 4" high approved skirting of used floor tiles in customer service area and supervisor room in CSC. Complete in all respects.” Used floor tiles needs elaboration. Already installed tiles while extracting would cause at-least 70-80% tiles breakage / damage and normally the same type of tiles are very scarce in finding from market? Preferred furniture brand names might be shared with us if possible (Chinese or other)?

Answer

Kimgrass Bone white (Cretesole) 2’ x 2’ Niro Granite gray (Cretesole) 2’ x 2’ For 1’x5’ tiles for stairs – Pure Blue granite natural stone Note: However, the approved sample may precisely determine the pricing and quality of tiles suggested by selected contractor. 12"x12" flooring tiles in washroom(s) and a kitchen area as mentioned in RFP “Already used floor tiles” basically refers to the new tiles to be used in renovation as existing tiles will be replaced with new ones and skirting will also be done with new tiles to be consistent

Providing the following or equivalent: CSR Chairs: Twi- Chairister Slide- on series 993 or Chairex T-5E

Amendment No. 01_RFP117

Page 1 of 3

S. No.

Question

Answer Supervisor Chairs: Twi - Chairister SLIDE-ON Series 991 Visitor benches: AD – 5P (Target auditorium)

5 6

7

8 9 10

11

12 13

14

15

Proposed MDF partition for the Supervisor office Lipping is not suggested No intimation of drawer under the service counter if required then details are not being provided. Seepages & Leakages is an issue which have been observed during the visit need to be resolved on the permanent based there method suggestion and material need to be described by the Consultant Engineer.

Rafter on ceiling suggested material need to be more clarified. Ground Earthing PIT or Boring is not mentioned if it is required then provide details D.B details and design on the bases of PESCO/UPS/Generator not provided along with CB,s details and there make models as per the distribution plane of power . D.B.s Installation Location is not suggested where as old D.B, s is located on the purposed display walls (Referred electrical drawing E-01, The D.B. exact locations are not identified due to that exact measurements and casting is not achievable).

Exhaust & Bracket Fan Dia is to be mentioned. On the Entrance of CSC, no renovation work intimated except stairs.

For placing of new tile flooring. Is there need of exacting floor tiles dismantling or being fixed on the same surface What will be the IRG Tax or deduction procedure for this work. Will you only deduct W/H Tax which is only 4 percent or also GST? GST applies on a product supply but there is no supply this is completely a renovation services so only TWO options are there one is withholding Tax and the other is Services Tax. So which one

Amendment No. 01_RFP117

In RFP, Solid deeyar wooden lipping in drawings is mentioned and requested 02 drawers of 1’ x 5” x 18” for each CSR sitting will be required For CSC Hayatabad, there is no seepage issue, For CSC Saddar the seepage is because of the OHWT leakage and it is going to be changed (the tank specification is mentioned in BOQ) and for CSC HQ the seepage treatment can be clarified after the removal of the existing false ceiling. The treatment rates can be mentioned in miscellaneous charges. Rafters will be of gypsum Not Required D.B details and designs will be decided on site as proposed by selected contractor DB will be installed at the following locations.  In CSC Saddar- in 3’ wide corridor behind the sitting area.  In CSC Hayatabad – on the wall behind the supervisor sit from washroom area.  In CSC HQ - In the corridor outside the CSC area. Super Asia exhaust fans, Super Asia wall mounted bracket fans The elevation of CSC HQ is already covered in BoQ. However, no major renovation for CSC Saddar and Hayatabad is required, except the exterior tiles of CSC hayatabad might require some polish depending upon the requirement and Yes, it does require dismantle of existing floor tiles to fix the new ones Since it is a turnkey solution therefore only withholding tax will be deducted as per Tax rules. There are different tax rates for firm and individual therefore confirm tax rates before submitting proposal.

Page 2 of 3

S. No.

16

17

18

Question

Answer

of these will be deducted? What exactly do you want in DVD? Are we suppose to add designs which is too much time taking part, or just a technical/financial proposal to be added to DVD so that you can have it in soft form? What is the payment procedure is there any chance that we could get some payment in advance and then get some after completing 50% work and remaining on completion of 100% work? (Special Requirement: All Contractors must attend the site visit prior to submitting their bid. If the Contractor does not attend then their bid will not be accepted.) This statement mentioned in the RFP document, we hope this remains same. Will only those vendors be consider for this RFP procedure who have visited the premises on mentioned dates or this criteria can be changed?

DVD, CD or USB. Only technical and financial proposal.

No advance policy.

No

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT End of Amendment No. 01

Amendment No. 01_RFP117

Page 3 of 3

20140926_Amendment No 1 to RFP 183.pdf

Renovation of Customer Services Centers of Peshawar Electricity Supply Company (PESCO) Peshawar. Circle, Pakistan. All prospective ... Kimgrass Bone white (Cretesole) 2' x 2'. Niro Granite gray (Cretesole) 2' x 2' ... Preferred furniture brand names might be shared with us if possible. (Chinese or other)?. Providing the ...

148KB Sizes 0 Downloads 127 Views

Recommend Documents

RFP 168 Amendment No 1.pdf
Structured Cabling System to be installed at the MEPCO HQ Campus buildings. Please. check the Guidelines document given at Annex – IV. Page 1 of 17 ...

RFP - Substitute Staffing Services RFP 2015-16.pdf
service. Page 3 of 16. RFP - Substitute Staffing Services RFP 2015-16.pdf. RFP - Substitute Staffing Services RFP 2015-16.pdf. Open. Extract. Open with. Sign In.

2016-2019 Internet Service RFP#2016-1.pdf
Connect more apps... Try one of the apps below to open or edit this item. 2016-2019 Internet Service RFP#2016-1.pdf. 2016-2019 Internet Service RFP#2016-1.

AMENDMENT NO 01 RFP 187.pdf
Page 1 of 11. Amendment No. 01_RFP187 Page 1 of 11. AMENDMENT NO 01. DATED: October 23, 2014. REQUEST FOR PROPOSALS (RFP). IRG/PDP/WAN/MEPCO/2014/187. Wide Area Network MPLS Bandwidth MEPCO Data Center Multan, Pakistan. All prospective bidders,. The

RFP - Town.pdf
... Review Page 14. • Contract Commencement & Completion Page 15. • Insurance Verficiation Page 16. IV. ATTACHEMENTS. • Attachment A – Web Hosting ...

RFP Solar Power Purchase Agreement MCPS2017-1 PDF.pdf ...
RFP Solar Power Purchase Agreement MCPS2017-1 PDF.pdf. RFP Solar Power Purchase Agreement MCPS2017-1 PDF.pdf. Open. Extract. Open with. Sign In.

RFP - NGN.pdf
Email: [email protected]. Proposals ... C. Simplify network operations from deployment, service activation, channel growth, ... RFP - NGN.pdf.

RFP - SCCM.pdf
submit multiple bids or one bid with multiple bandwidth options. 9. The Library District recognizes that not all bidders can offer service at each of the three branch. locations. However, the District would prefer to enter into a contract with one or

R07 Set No - 1
Define and derive the equation for the vorticity of a flow. Hence prove that ... out from the leading edge to the trailing edge of a symmetrical airfoil. (b) State and ...

R07 Set No - 1
Check whether the following impedance functions are LC, RL or RC? (a) Z(s) = ... amplitude 5 V. Find autocorrelation function and energy spectral density. [8+8].

R05 Set No - 1
How can you find virus concentration both directly and indirectly by particle counts · and measurement of infectious unit concentration. Define plaque forming ...

Set No. 1
DIGITAL SIGNAL PROCESSING · ( Common to Electronics & Communication Engineering, Electronics & ... Set No. 1. (b) How are IIR digital filter realized?

Set No.1
(b) Explain the role of super alloys and dispersion strengthed alloys for high tem- perature creep. 8. Explain the following N.D.T Processes. (a) Magnetic particle ...

Set No.1
All the ethane and propane produced is recycled as feed. The cost of feeds and products are as- sumed as follows: Feeds. Cost (Rs/kg) Products. Cost (Rs/kg).

Set No.1
(c) Explain the conclusions that are drawn from Joule - Thomson experiment. [4] · 3. (a) What is entropy? What are the different types of entropies? Explain. Give.

Set No. 1
Explain constraint satisfaction with the help of a crypt arithmetic problem.[10+6] · 3. (a) Explain how the Herbrand's theorm forms the basis of resolution.

Set No. 1
[8+8] · 3. What is mutual exclusion? Explain the following Algorithms to implement mutual · exclusion. (a) A centralized Algorithm · (b) A Token Ring Algorithm.

Set No.1
and on commercial vehicles? Does it vary from one vehicle to other. (b) Explain the semi floating. ... Describe its operation with the neat sketch. (b) Describe the ...

Set No. 1
gear wheels are equal to one module, find ... ii. the angle of action of the pinion and the gear wheel ... Determine the number of teeth on all the wheels.

Set No. 1
If input capacitance of the voltmeter is 4.5 pF and the lead capacitance is 1.5 · pF, determine the inductance and self capacitance of the coil. [8+8] · 4. (a) What is ...

Set No. 1
Code No: R05420401. Set No. 3. (c) Multiple sub-layer · (d) Paging channel. [4×4=16] · *****. 2 of 2. AjntuWorld.in. Page 6. Code No: R05420401. Set No. 4.

Set No.1
ii. Command with Text operand · [8+8] · 8. (a) Explain various phases in loaders? (b) How the loading and linking process can be resolved in relocating loaders?

NR Set No - 1
Code No: 14001. NR. Set No - 2. II B.Tech II Semester Semester Supplimentary Examinations,February 2010 · APPLIED ELECTRONICS · Civil Engineering.

Set No. 1
Set No. 1. IV B.Tech I Semester Supplimentary Examinations, May/Jun 2009 · FINITE ELEMENT METHODS · (Civil Engineering) · Time: 3 hours · Max Marks: 80.