11/27/17

ABRSD

1

School Building Project Presentation Fall 2017

ABRSD

2

School Building Project §  Dec 4 Town Meetings in Acton and Boxborough to request

funds for a feasibility study for a school building project §  Two-year Master Planning process resulted in a

recommendation to build a twin school to replace two elementary schools and the Acton preschool §  AB has been was one of 17 projects invited into the state

eligibility period for a school building project to include the Douglas elementary school (out of 87 applicants) §  Presentation will review process to date, facility and space

needs, timelines, and cost estimates

1

11/27/17

ABRSD

3

Master Planning Process Phase 1

2015-2016

•  Completed review of all 8 school facilities •  Developed Capital Improvement plan •  Identified Douglas, Gates, Conant in need of renovation/ replacement and overcrowded Phase 2

Feb 2016 - Dec 2016

•  Conducted Educational Visioning – 80 stakeholders •  Identified 7 possible building project options •  Held 12 Forums, focus groups, surveys, review Option review and recommendations 2017 •  Invited into Formal MSBA Process •  Established Building Committee •  Identified Preferred Option

ABRSD

4

School Buildings Evaluated

Parker Damon R.J. Grey Jr. High School

center school

Admin Building

Acton-Boxborough Regional High School

• 

Blanchard

Gates

Conant

Douglas f.l.o./h.h.r.

Landfill Bldg

2

11/27/17

ABRSD

5

Age of Buildings and Renovations 1946

1956

1966

1976

1986

1996

2006

2016

Blanchard 1949, 1959, 1967, 1970, 1995 (22 years since last renovation)

R.J. Grey Jr. HS 1955, 1960, 2002 (15 yrs last reno; some components are 57 yrs old)

Admin

Maint. Bldg

1957 (60 years old)

1980 (37 years old)

ABRHS 1964, 1971, 2004 (13 yrs since last reno)

Douglas 1965 (52 years old)

Gates 1967 (50 years old)

Conant

Parker Damon

1970 (47 years old)

2001 (16 yrs old)

Acton Boxborough Regional School District Site and Building Assessment

ABRSD

6

Most Building Issues at Conant, Douglas and Gates

3

11/27/17

ABRSD

7

Most Space Issues at Conant, Douglas and Gates

ABRSD

8 SF

Students

MSBA 301,622

Current

Existing 327,237

Capacity

1,827

RJ Grey Jr HS

AB Regional HS

Capacity Based on Gross Square Footage

2071

SF

Students

MSBA 142,240

Current

Existing 143,280

Capacity

SF

Students

964

SF

Students

908

Conant K-6

Blanchard Pk-6

499

Capacity

483

MSBA 67,697

Current

Existing 71,395

Capacity

MSBA 75,906

Current

MSBA 871,901

Current K-12

Existing 48,324

Capacity

Existing 841,149

Capacity K-12

448 434

Existing 139,963

MSBA 71,562

Current

Existing 55,017

Capacity

442

307

MSBA 70,649

Current

Existing 55,933

Capacity

402 300

*bld. sq. ft. and student enrollment per MSBA website

427

270

District-Wide

483

Current

Douglas K-6

Capacity

MSBA 142,225

Merriam K-6 ES

487

Gates K-6

Current

Mc. Towne. K-6 ES

30,752

5,496

5255

Current Elementary

2,705 Elementary Capacity

2,277

4

11/27/17

ABRSD

9

Enrollment Update 2014-15

2015-16 2016-17

2017-18

K Proj

317

312

286

298

K Actual

321

299

330

353

Over Proj

+4

-13

+44

+55

Housing Sales Acton

310

400

514

Housing Sales Boxborough

85

114

116

326 (Jan-Sept)

101 (Jan-Sept)

ABRSD

10

Douglas Space and Facilities Issues •  5 Modulars/Temporary Classrooms §  “New” double modular is 11 years old §  3 old modulars are 21 years old §  Would cost $1.5M - $2M to replace – not included in building project estimates Modular A 5 Separate Programs Three Special Ed Learning Centers, English Learners and Writing Support

Modular B Art Classroom Need to carry materials out of the modular down the hall to the sink to clean them

Students need to walk through the cafeteria to get to the modular

Modular D Library

Modular C Music Classroom

Modular E Breakout space for library Extended Day

5

11/27/17

ABRSD

11

Douglas Space & Facilities •  Built in 1965; roof replaced but otherwise

no major renovations

Douglas

•  Two story building – not accessible

Students & staff in wheelchairs & equipment on wheels have to go outside, around building to change floors •  Modulars have aged out and need to come off-line or be replaced

soon - $1.5M to $2M to replace not included in project costs •  Capacity=270 students – Need space for 450-500 students

Has 20 classrooms – Need 21 K-6 classrooms, 4 Special Ed, Art, Music; Has no small group instructional spaces

ABRSD

12

Gates/Conant Space and Facilities •  Built in 1967 (Gates) and 1970 (Conant)

No major renovations •  Each has 3 - 4 large special education

programs in one open classroom •  Capacity= 300 students each – Need space for 450-500

Have 20 classrooms Need 21 K-6 classrooms; 4 Special Ed; Art & Music; No small group instructional spaces •  Each currently serving 55-60 English Learners

in small groups in small offices

Conant

6

11/27/17

ABRSD

13

Early Childhood Program •  Required program to serve special ed

students ages 3-5 plus tuition students

Admin Bldg

•  Currently have 115 student in 5 classrooms

in Acton and 2 classrooms in Boxborough •  The Acton classrooms are in the Administration Building

built in 1957 – formerly Merriam School; Merriam vacated to move to the new twin school in 2002 •  Not accessible; some classrooms downstairs. No other

students or programs. No access to art, music or P.E.

ABRSD

14

K-12 Enrollment – Changes Since 2015 6500

6000

2010 5,912 2017 5,498

2023 5,496

2027 5.697

2029 5,861

5500 5,044

5,045

2015 Proj K-12 2016 Proj K-12

5000 4,638

2017 Proj K-12

4.510

4500 + 858

+ 1,187

4000

7

11/27/17

ABRSD

15

Elementary Enrollment – Changes since 2015 3200

3000

2010 2,969

2800

2017 2,716

2023 2,847

2027 2,917

2029 3,012

2,652 2600

2015 Proj K-6

2,464

2016 Proj K-6

2,432

2400

2017 Proj K-6

2,191

2200

+ 656

+ 485

2000

ABRSD

16

Square Footage and Capacity Sq Ft

Capacity

2017-18 Over/(Under) Enrollment Capacity

Douglas

48k

270

427

157

Gates

55k

300

402

102

Conant

55k

307

442

135

Blanchard

71k

434

448

14

Merriam

70k

483

499

16

McCarthy-Twne

70k

483

487

4

Total

369k

2,277

2,705

428

8

11/27/17

ABRSD

17

Demographic Changes §  280 English Learners – need space to work with small

groups §  Classrooms to keep high needs students in-district §  Need small group spaces for

Speech/Language, Occupational Therapy, Physical Therapy, Reading Support, Counseling, Psychology §  10% of our students are economically disadvantaged §  Working families need before and after school care

ABRSD

18

Preferred Option §  A twin school for two PreK-6 elementary schools §  The Gates property is the likely site; We will explore Conant or

other possible sites as needed §  The Gates and Douglas property would be treated as a

campus •  School would be built on the Gates site •  Parking and playgrounds would be built on the Douglas site •  A better walkable bridge would connect the two sites •  Construction can take place while school is in session •  Once complete, Douglas and Gates would be torn down for parking and playgrounds §  Douglas would move into one side of the new school, and

Gates would move into the other side

9

11/27/17

ABRSD

19

Project Description §  Each school would have enough classrooms to support 3

classrooms at each grade level including: •  21 K-6 Classrooms •  Art and Music Classrooms •  Special Education Classrooms •  Small group instructional spaces (English language, reading,

counseling, speech and language, OT/PT) §  8 preschool classrooms would be built with support services for

preschool special education students such as speech and language, occupational, and physical therapy §  Preschool students would also have access to art, music, and

physical education in the elementary schools

ABRSD

20

Twin School on Gates Property

10

11/27/17

ABRSD

21

Benefits of a new school §  Provides space for overflow from all schools §  Gates and Douglas could grow back to three-section

schools §  Appropriate educational spaces – English learners,

special education, art, music, library, etc. §  Would not need to spend money to replace old modular

or make repairs §  Takes advantage of state reimbursement and low

interest rates

ABRSD

22

Additional Capital Planning •  MSBA will only reimburse one project at a time. This allows

us to solve the issues of two elementary schools and the preschool with one approved reimbursable project (the Douglas “Statement of Interest”) •  District can submit request for Conant renovation/

replacement when this project is complete •  District will continue to complete capital projects from Capital

Improvement Plan for Blanchard, Merriam, McCarthy-Towne, Jr. High and High School; $14 million in capital projects identified to be completed over the next 5-7 years

11

11/27/17

ABRSD

23

2

Invited into MSBA eligibility period

Project Team

April 2017

Dec 2017

3 Feasibility Study

4

5

6

Schematic Project Design Design Funding Agreement

7

8

Build

Occupy

Sept 2021

Sept 2022

process overview – MSBA

1

SOI

Apr 2016

Feb 2018

Towns Vote for Feasibility & Schematic Funds

April 2019

Oct 2019

Jan 2020

Towns Vote for Design & Construction Funds

270 days

½ Years -6½ 65 ½ ½ Years 6 Years

ABRSD

24

December 4 Town Meetings §  Vote whether to approve funds for the feasibility study,

designer services and an owner’s project manager (OPM) §  Cost = $1.3M §  MSBA will reimburse 45.3% of these costs = $590,000 §  Acton-Boxborough is responsible for $710,000 §  Money will come from the district’s E&D reserves fund;

This is similar to a town’s free cash and will not increase costs/taxes to either town

12

11/27/17

ABRSD

25

What will the $1.3M be used for? §  Site-Civil Analysis

Wetlands and boundaries Ledge Traffic §  Architectural Fees

Schematic design of the new school and site Detailed cost estimate – used for final project agreement with MSBA for reimbursement §  Owner’s Project Manager

Represents the district throughout the process §  Any unused funds can be rolled into project

ABRSD

26

Project Cost Dore and Whittier Estimated Cost: $100M - $120M MSBA reimbursement 40% - 45% $40M - $54M Estimated AB Share $55M - $72M Estimated Acton Share*: $45M - $60M Estimated Boxborough Share*: $10M - $12M *The AB Regional Agreement specifies that Acton and Boxborough each pay a share proportional to the number of students enrolled in the district from each town. Currently enrollment is approximately 85% Acton and 15% Boxborough

13

11/27/17

ABRSD

27

New Building vs Repairs New Twin Building

Repairs and ADA Compliance

Total Cost Estimated MSBA Reimbursement (45%)

$ 110,000,000

$ 39,000,000

$ 49,500,000

$

Net Cost

$ 60,500,000

$ 39,000,000

Boxborough Share

$

9,075,000

$ 5,850,000

Acton Share

$

51,425,000

$ 33,150,000

-

50 year life span

10 year life span

Addresses deficiencies

Addresses deficiencies Does not address space needs

Addresses space needs

ABRSD

28

Current Debt Service – Acton Town Debt (blue) Plus Share of AB Debt (light red)

6000000

5000000

$

4000000

3000000

2000000

1000000

0 2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

Anticipated borrowing for new project 2023

14

11/27/17

ABRSD

29

Current Debt Service – Boxborough 2,000,000.00

Town Debt (blue) Plus Share of AB Debt (light red)

1,800,000.00 1,600,000.00 1,400,000.00 1,200,000.00 1,000,000.00 800,000.00 600,000.00 400,000.00 200,000.00 -

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

Anticipated borrowing for new project 2023

ABRSD

30

Please Vote on December 4th

15

11/27/17

ABRSD

31

DISCUSSION AND QUESTIONS

16

2017-Fall Building Committee Forum Presentation Rev. 11_27_17 ...

Loading… Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... 2017-Fall Bui ... 7 V10 (1).pdf. 2017-Fall Buil ... 17 V10 (1).pdf. Open. Extract. Open with. Sign In. Main menu.
Missing:

4MB Sizes 1 Downloads 256 Views

Recommend Documents

Forum April REV - Widener University
and EJ have very real applications. Our perception is that this is not the case for most ecologists. In fact, the ..... healthy ecosystems and the services they provide, so rec- onciling these two often conflicting aims is imperative. It ..... Modern

Forum April REV - Widener University
Despite the lack of success in mobilizing support from the predominately white, mainstream protection- and conservation-oriented .... ocean near Los Angeles. Popular subsistence and recre- ational fish continue to be ... improve the long-term profita

Medford Square Community Forum-9-7 Presentation Final.pdf ...
There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Medford Square Community Forum-9-7 Presentation

Committee Day Presentation 11-21-14.pdf
recommendation of the Presidential Search Committee, to expend up to One Hundred Thousand. Dollars ($100,000) from the Academy's Reserve Funds in ...

Presentation
A fast, cheap and simple analytical method. .... limited data from Jordan ... data. • Some of those: Mishor Yamin,. Revivim – Mashabim, Sde-. Boker, Shivta ...

In-Space Propulsion Using Modular Building Blocks (presentation ...
Low Isp (~316 s). • Toxic. Page 4 of 14. In-Space Propulsion Using Modular Building Blocks (presentation).pdf. In-Space Propulsion Using Modular Building ...

Presentation Title Presentation Sub-Title
April 2010, Prahran, Melbourne. • Direct impacts ... Victoria. Currently infrastructure and facilities are designed based on past climate, not future climate. ... Sensitivity of Materials to Climate Change Impacts. Material. CO. 2. Cyclones. & Stor

Presentation Title Presentation Sub-Title
Climate change impacts – impact upon cycling conditions and infrastructure. Infrastructure and climate change risks for Vic. Primary impacts – impact upon ...

Committee - GitHub
OXFORD GLOBAL. EDUCATION. DEVELOPMENT ... A. Development and implementation of new technology against climate change. B. The development of an ...

Presentation Title Presentation Sub-Title
Helen Millicer, Member, Glen Eira BUG and Bicycle. Victoria Board. Thanks for permission to use slides from presentations given to PACIA members in Vic and ...

Conservative Lead Grows - The Forum Poll - Forum Research
May 17, 2018 - going into the summer break,” said Dr. Lorne Bozinoff, President of Forum ... reached at [email protected] or at (416) 960-9603.

Conservative Lead Grows - The Forum Poll - Forum Research
May 17, 2018 - (approve minus disapprove) is -8. “The Conservatives have strengthened their lead over the governing Liberals going into the summer break,” ...

Presentation Information
Please arrive at the assigned meeting room 10 minutes before the session ... All meeting rooms are equipped with digital projectors and laptop computers.

Asian Youth Forum (AYF 13)
Feb 2, 2015 - AYF Chair: Kip Cates (Tottori University, Japan) Host Organization: Thai ... For more information on AYF 13 or to apply, go to our website and ...

8th Annual BIO Investor Forum
www.bio.org/bioceo. New York, NY. - 1 - [email protected]. Monday. Feb 10, 2014 ... Welcome Reception (Empire Room). Legend. Blue: Private Company.

NEC Forum
7. http://www.who.int/genomics/elsi/elsiatwho/en/index.html#gd. 8. Tutton R, Person, property and gift, in Genetic Databases, Routledge, London, pp 19, 2004. 9. http://www.bristol.ac.uk/Depts/Ethics/CEM/epeg_interim_reprt.htm (2001). 10. Neale B, Chi

young scholar forum - WMO
Jul 31, 2012 - social and cultural identities. ... held on 10-12 December in Nicosia. ... stimulate scientific exchanges, cooperation and social networking ...

Human Rights Forum - MOBILPASAR.COM
KARIMNAGAR. President. General Secretary. V. Sudhakar Reddy, Advocate. Flat No.102, SRR Enclave. 2-10-1089, Jyothinagar, Karimnagar. Ph: 0878 - 224577. Mob: 9949210801. Md. Anwar. D.No.1030, Jawaharnagar. Godavarikhani, Karimnagar. Mob: 9247822615. G

young scholar forum - WMO
Jul 31, 2012 - A new European-MENA partnership on science and technology ... consultation on career options for MENA researchers who would like to enrol ...

forum geom
Apr 30, 2002 - The triangles FMO1 and F QF are similar since ZFMO1 = ZF QF and. ZFO1M = ZFF Q. 3 It follows that. O1M. O1F. = F Q. F F. = λ, and O1M = R1. The circle through M with center O1 is one in the family of circle for which we search the env