RPMES Digest Northern Mindanao (Region X) Comparative Performance: 1st Quarter 2016 to 3rd Quarter 2016 The overall performance for programs/projects implementation of the Region over the three quarters of CY 2016 improved, reflecting the absorptive capacities of implementing agencies (IAs)/ government-owned and controlled corporations (GOCCs)/state universities and colleges (SUCs). It is expected that by end of the year most of the project implemented will be completed. Figure 1. Comparative Performance: 1st Quarter 2016 to 3rd Quarter 2016, Region X 90.00 80.00 70.00 60.00 50.00

40.00 30.00 20.00 10.00 0.00

1st Quarter 2016

2nd Quarter 2016

3rd Quarter 2016

Target Physical Accomplishment

57.99

77.33

83.52

Actual Physical Accomplishment

54.49

66.74

81.65

Expenditure Rate

75.40

75.61

81.81

RPMES Status Report as of 30 September 2016 (3 rd Quarter 2016) The 3rd Quarter 2016 RPMES Report covered 25 IAs, GOCCs, and SUCs in Region X. A total of 4,117 programs/projects were implemented with overall funding allocation of PhP70.640 billion. A total of 73,931,599 person-days was generated during the period. Among the sectors, the Infrastructure Sector posted the highest expenditure rate of 85.63 percent followed by the Social Sector with 58.24 percent. The Economic Sector posted the lowest expenditure rate of 56.00 percent. The low expenditure performance of the Department of Agrarian Reform – X (37.69 percent) and Department of Environment and Natural Resources – X (37.31 percent) pulled down the total expenditure rate of the Economic Sector. One reason was the delayed implementation of Mindanao Sustainable Agrarian and Agriculture Development (MinSAAD) projects of DAR-X. Also, the bulk of DENR-X’s budget was allocated for National Greening Program (NGP) of which implementation arrangement was through contracting with the upland communities and payment was through progress billing. As of reporting period, services incurred were not yet billed to the DENR-X.

Overall, the weighted actual physical accomplishment of all the programs/projects implemented was 81.65 percent, which was lower by 1.87 percent of the target accomplishment of 83.52 percent. Figure 2. Expenditure and Target vs. Actual Accomplishment (as of 30 September 2016)

90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 Social

Infrastructure

Economic

Region

Expenditure Rate (%)

Social 58.24

Infrastructure 85.63

Economic 56.00

Region 81.81

Target Physical Accomplishment (%)

91.57

82.58

84.08

83.52

Actual Physical Accomplishment (%)

61.87

83.75

85.31

81.65

There are six agencies that incurred at least negative 15 percent slippages in project implementation: 1. DAR -68.00% 2. DepEd -46.71% 3. DSWD -38.67% 4. DILG -37.18% 5. DOST -31.36% 6. NHA -18.14% Major reasons cited for the delayed implementation of various programs/projects mentioned above are the following: Agency DAR

Issues/Concerns Delay in project implementation of Mindanao Sustainable Agrarian and Agriculture Development (MinSAAD) Project

Action Taken/Recommendations by the Agency  DAR-X to fast-track implementation of MinSAAD projects. 

DepEd

Late issuance of guidelines for fund utilization after project approval to Regional Office resulting to delayed bidding of the projects, thus delaying project implementation.





DAR-X to closely monitor progress of project implementation. Agency constantly followed-up with DepEd Central Office for the issuance of the guidelines. Per update, guidelines were issued in the 3rd Quarter of CY2016. For DepEd Central Office will immediately issue guidelines on fund utilization after project

Agency

DILG

DSWD

DOST

NHA

Issues/Concerns

Action Taken/Recommendations by the Agency approval and the issuance of fund allocation

Delayed project implementation and completion of BuB projects due to the following reasons: 1. Contractors’ inability to supply/provide the needed materials and equipment during project implementation 2. Unliquidated cash advances of LGUs 3. LGUs’ delayed/non-submission of documentary requirements Delayed implementation of programs/projects due failure of bidding/delayed procurement process at the LGU Level/Community Level

LGUs concerned were already advised to fast track the implementation of their projects; otherwise the LGUs shall return funds to DILG-X.

Delay in the implementation of some projects under SETUP due to procurement problem: 1. Unavailability of equipment upon purchase 2. Delay in the delivery and installation by the equipment suppliers

DOST-X will continuously monitor and provide technical assistance to cooperator/beneficiary/proponents throughout the project implementation.

Beneficiaries/cooperators are required to undergo their own procurement process (e.g. canvassing, bidding) as prescribed in the guidelines. 1. Delay in securing permits and licenses (e.g. building permits) 2. Unresolved boundary conflicts 3. Unfavorable weather condition

DILG-X to closely monitor and coordinate with the LGUs concerned.

DSWD-X will closely monitor and coordinate with the LGUs/Beneficiaries concerned



NHA-X required the contractors to submit catch-up plans and to request for time extension



NHA-X will assist the contractors and closely coordinate with LGUs for securing permits and licenses

Source: RPMES Form 2 (Agency Input Form) and RPMES Form 3 (Agency Project Exception Report)

3rd Quarter CY 2016 RPMES Digest.pdf

DILG-X to closely monitor and. coordinate with the LGUs concerned. DSWD Delayed implementation of. programs/projects due failure of. bidding/delayed ...

340KB Sizes 0 Downloads 208 Views

Recommend Documents

RPMES 3rd Quarter 2016 with Comparative performance-after ...
Infrastructure. 77.70%. Economic. 5.10%. Page 4 of 22. RPMES 3rd Quarter 2016 with Comparative performance-after consultation.pdf. RPMES 3rd Quarter ...

RPMES 3rd Quarter 2016 with Comparative performance-after ...
There was a problem previewing this document. Retrying... Download. Connect more apps... RPMES 3rd Qu ... ultation.pdf. RPMES 3rd Qu ... ultation.pdf. Open.

RPMES Report 2nd Quarter 2015.pdf
investment cost of PhP 27.222 billion. Projects included in this report were those. funded through Official Development Assistance (ODA), and those funded by ...

RPMES Report 1st Quarter 2015.pdf
K1008+150-K1008+360 Boundary Mahaplag-Liloan, Sogod. Other. Improvement Works (Slope Protection, Drainage, Sidewalks). 4. Construction/Rehabilitation of Flood Control Structures, Subang Daku Flood. Control (Phase II) (Along Boundary Southern Leyte-Ma

(QSR) 1st Quarter, CY 2018 - Defense Suicide Prevention Office
6 days ago - compared to the 1st Quarter of 2017 (23 versus 32 deaths) o Air National Guard deaths are up by 1 o Army National Guard deaths are down by ...

Quarterly Suicide Report (QSR) 4th Quarter, CY 2017
Apr 9, 2018 - George Parisi, Acting Director. Defense Suicide Prevention Office. (DSPO). The estimated cost of this report or study for the Department.

CY 2016 Annual Accomplishment Report.pdf
CY 2016 Annual Accomplishment Report.pdf. CY 2016 Annual Accomplishment Report.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying CY 2016 ...Missing:

CY Uniform Catalog 2016.pdf
CY Uniform Catalog 2016.pdf. CY Uniform Catalog 2016.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying CY Uniform Catalog 2016.pdf. Page 1 of ...

3rd Grade Quarter 3 Overview.pdf
Page 1 of 4. Wake County Public Schools. 3. rd Grade ELA Overview - Quarter 3. Reading Unit: Exploring Mysteries. Writing Unit: Realistic Fiction. Unit Overview: This unit will explore the mystery genre along with poetry and drama. Students will disc

GABMLS PRESS STATEMENT ISSUED AFTER 3RD QUARTER ...
Disease Control and Prevention (CDC) Atlanta-USA formed the Laboratory Technical Committee. (LTC) to ... Upper East Regional Health Directorate and Christian Health Association of Ghana (CHAG). Authorities to ... Page 3 of 4. GABMLS PRESS STATEMENT I

Forensic Science 3rd Quarter--2018
January 23. January 24. January 25. January 26. W e e k. 3. Trace questions & review due today. Unit 6 Test—Trace. Evidence. Intro to Blood an. Spatter Evidence/Begin. Notes. Blood/Spatter notes cont. Forensic Files—. Blood/spatter Evidence with

3rd Grade Quarter 1 Overview.pdf
This unit focuses on creating a lifelong passion for reading in students. Students develop a sense of personal ownership by setting personal reading. goals.

2016 | 2nd Quarter Report.pdf
ASX Code: HNR. Capital Structure ... demand received from Avalon Minerals Ltd. Mine Builder Pty Ltd .... 2016 | 2nd Quarter Report.pdf. 2016 | 2nd Quarter ...

Halliburton Provides First Quarter 2016 Operational Update
Feb 17, 2015 - a new record low. ... sequentially, and setting new record lows every week. ..... real-time pressure and temperature data for the reservoir and ...

Halliburton Announces Third Quarter 2016 Results
Oct 19, 2016 - results for the third quarter of 2016 of $0.01 per diluted share. ... Our North America business delivered 9% sequential revenue growth, and ..... of these items as an indicator of performance, to identify underlying trends in the.

2016-2017 4th Quarter Newsletter.pdf
This quarter, junior high students will be completing interest inventories and researching a variety of careers in life skills. I would like to address the topic of ...

Halliburton Provides First Quarter 2016 Operational Update
Feb 17, 2015 - production by integrating coiled tubing with downhole measurement tools, fiber optic sensing and telemetry. The new family of services consists ...

Halliburton Provides First Quarter 2016 Operational Update
Feb 17, 2015 - first quarter operating income was $310 million, which decreased $192 million, or 38%, sequentially, driven by ... North Sea throughout the first quarter, including our Baroid BaraECD® drilling fluid system and .... Founded in 1919, H

IIT JAM 2016 Chemistry (CY) Question Paper and Key.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. IIT JAM 2016 ...

Turquoise Hill Press Relese 3rd Quarter 2015 finances ...
Council in August 2015, pre-start activities are underway in parallel with an update to the capital estimate, which. is expected to be completed in Q1'16. Pre-start ...

3rd quarter ended on 31 march 2015.pdf
Page 2 of 5. Statement of Comprehensive Income. Tk' 000. Particulars Note. July 2014. to March 2015. July 2013. to March 2014. January 2015. to March 2015.

Physical-Performance-Report-3rd-Quarter-2013-old.pdf
NRO 11: Updating of the PDP/. RDPs completed. NRO 11: Updating of RDP, 2014-2016. completed (for printing) endorsed by RDC. XI. 100%. NRO 7: Regional ...

CY 2015.pdf
-Label Design Development Assistance. -Increased the volume of production of pasta sauces by. 100%. -Increased gross sales by 100%. -Improved process ...

honor roll 2nd Quarter 2016 17.pdf
Shane MacNeill, Andrew Macomber, Cody Marshall, Paige Matthews, Freja Pausgaard,. Caitlin Pelkey, Katelyn Roberts, Donovan Robillard, Hunter Sawtelle, ...