ADVERTISEMENT FOR GENERAL CONTRACTOR PREQUALIFICATION Subject to funding approval and conditions prescribed by the undersigned, responses to University’s prequalification documents are sought for the following work:

Anna Head Buildings E & F Renovation PROJECT NO. 12673A Estimated Construction Cost: $4,500,000 UNIVERSITY OF CALIFORNIA BERKELEY, CA; ALAMEDA COUNTY PREQUALIFICATION OF PROSPECTIVE CONTRACTORS: Contractors who submit bids on this Project must be prequalified.

University has determined that

LICENSES: To become prequalified, interested Contractors must possess a current California contractor’s license – General Building License Classification, License Code “B.” DESCRIPTION OF THE WORK: Renovation of two wood-framed buildings that are part of the Anna Head school complex, a City of Berkeley Landmark, and listed in the State Historic Resource Inventory, and listed on the National Register of Historic places. Work includes complete seismic, life-safety and code improvements. Architectural, structural, mechanical, electrical, fire alarm, fire sprinkler and exterior skin and envelope upgrades will be completed to connect the two buildings and convert them into a Student Counseling center for University Health Services. Scope will include fumigation and hazardous materials abatement. PREQUALIFICATION SCHEDULE: Interested firms may obtain an electronic copy of the Prequalification Documents on August 10, 2016 via email request to: [email protected] A MANDATORY Prequalification Conference will be conducted on August 16, 2016 at 10:30 a.m. at the Courtyard located between Anna Head buildings A, D, E and F, between Channing Way and Haste Street, west of Bowditch street. Courtyard is south of UC Residence Hall, Maximino Martinez Commons, at 2520 Channing. Attendance at the Prequalification Conference is mandatory for Contractors attempting to become prequalified to bid on this project. Contractors may find that parking may be difficult. The Owner recommends that you allow ample time to drive to the campus, find a parking space, walk to and locate the starting point from which the mandatory Prequalification Site Visit will begin. Prospective Contractors arriving late after the MANDATORY Prequalification Site Visit has commenced (i.e., more than 15 minutes after the published starting time.) will not be allowed to submit a prequalification statement for this project. Prospective Contractors must be present for the entire Pre-Bid Site Visit. ) Prequalification Submittals will ONLY be received at 2pm on August 31, 2016 at the following email address: [email protected]* *Note: In order for the Proposer’s submittal to be received in a timely manner, please plan on submitting prior to 12Noon. Large submittals may take time to come through to the University’s email address. No Prequalification Submittals will be received after August 31, 2016 at 2:00 p.m.

However, the

University reserves the right to request, receive, and evaluate supplemental information after the above time and date at its sole determination. Confidentiality of the information provided will be respected to the extent permitted by law. QUESTIONS: Only written inquiries will be permitted. Questions must be submitted in writing by 5:00p.m., August 18, 2016 and will be acceptable by email to the Project Manager. Project Manager and Owner contact is Valerie Zylla, UC Berkeley Construction & Design, Real Estate Division, 1936 nd University Avenue, 2 Floor, Berkeley, CA 94704-7027, email: [email protected]. All information requested in these forms must be provided in order to be considered "responsive" to the requirements of prequalification. The University may choose to interview each proposer. THE REGENTS OF THE UNIVERSITY OF CALIFORNIA August 10, 2016

AD -Anna Head Buildings E & F Renovation Prequal ...

Page 1 of 7. ADVERTISEMENT FOR GENERAL CONTRACTOR PREQUALIFICATION. Subject to funding approval and conditions prescribed by the undersigned, responses to University's. prequalification documents are sought for the following work: Anna Head Buildings E & F Renovation. PROJECT NO. 12673A.

20KB Sizes 1 Downloads 169 Views

Recommend Documents

e f e f e f e f e f e f e f e f e f e f e f e f e f e
With your bitter, twisted lies,. You may trod me in the very dirt. But still, like dust, I'll rise. Does my sassiness upset you? Why are you beset with gloom? 'Cause I walk like I've got oil wells. Pumping in my living room. Just like moons and like

f"E
From. Re. STATUS OF IMPLEMENTATION OF THE SCHOOL REPORT CARD ... C). 0 Q. CD. < -. 3 C. 9-. 0 CO. CD a. CD. CL M. ooCO. 0-. 0 a. 0. 0. 0. 0-. CC-. -•.

'155| E 2' f'
brane to combine with the oxidant and free electrons at the cathodic elect-rode. A convenient supply of fuel gas for the fuel cell is a generator comprising means ...

K L E F UNIVERSITY
Unit 4 - Telephone and E-mail Etiquette: Basics of Telephone and E-mail Etiquette. Unit 5 - Cross-Cultural Communication: Cross-cultural issues which affect ...

F:17;E
Mar 18, 2016 - SCHOOL. NAME OF REPRESENTATIVE. 1. Schools Divison Office. Giemar I. Besin. Secondary Schools. 2. Congressional National High School. _. Jocelyn P. Mamporte. Dasmarifias East National High School. Evelyn L. Reyes. _. 4. Dasmarifias Nor

( S 0 s C? F 'F 1 C E )
Dec 10, 2015 - Test Construction for the Third Grading Period and Submission of ... In lieu of the forthcoming Third Periodical Test, the following teachers are ...

Waterhouse Renovation Ppoint_Sm.pdf
Page 2 of 29. History of the Field. • The Waterhouse Commission (previously known as Biddeford. High School Alumni Field Association) was deeded the ...

I M f y R E
Page 2. www.mechdiploma.com. Q.4.What​ ​is​ ​Neutral​ ​axis​ ​​ ​in​ ​case​ ​of​ ​Bending? In​​a​​beam​​subjected​​to​​bending ...

ANNA UNIVERSITY
Apr 16, 2018 - integrated manufacturing/Nano Science & Tech. / Aeronautical. Engg. /any specialization related to manufacturing or Design or. Materials). Desirable. : Experience related to the area of project (Stir casting of Metal. Matrix Composite/

Renovation application form.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Renovation ...

AC F F F F 2 F F θ F 2 F F (Dot Product) ACAB ⋅ F ACAB ⋅ = a1a2 + ...
AC. F F F F 2 F F θ. F 2 F. F (Dot Product) ACAB. ⋅. = AB AC cosθ. F. ACAB. ⋅. = a1a2 +b1b2 a1,b1 a2,b2. F AB. AC. ACAB. ⋅. = a1a2 +b1b2. F F. ACAB. ⋅.

e=mc 2: and v = λf: Then e=m(λf)2 (λ) Gravity the ... -
e=mc. 2: and v = λf: Then e=m(λf)2 (λ) Gravity the Cosine, (f) Light is the Sine and. Magnetism the Tangent string. For the medical and scientific community it is important to know that Light and Gravity are in a. Sine / Cosine relationship. Light

CTE-PROPOSED-RENOVATION-PLAN.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... CTE-PROPOS ... N-PLAN.pdf. CTE-PROPOSE ... ON-PLAN.pdf.

Renovation (Print).key - David J. Peterson
Aug 18, 2011 - Sound System. Oral Stops. Nasal Stops. Fricatives. Affricates ... front > furonto > “reception desk” animation > anime > anime. Rejection and.

F (3204-2005) ก ก ( . ) ก F E-mail: [email protected]
F (3204-2005) Contact E-Mail: [email protected] URL: http://krujibck.blogspot.com. F (3204-2005). ก ก ( . ) ก F E-mail: [email protected] {08-6345-5731}. Fก F. 1. F F F ก ก F F กก F. 2. F F F F (E-R Model) ก ก F. 3. F F Fก à¸