Bancroft Modernization Project Update – 7/14/2017 Prepared on: July 14, 2017 Location: ​1755 Newton Street, NW Ward:​ 1 Overall Project Budget: ​$68M Design Builder/Architects: ​Coakley Williams Construction Project Manager(s): ​Jennifer Battle Project Status: ​Construction Construction Start Date: ​Fall 2016 Project Completion Date: ​Summer 2018 General Project Summary ● The Bancroft campus consists of five adjoining buildings totaling approximately 94,000 square feet of space. The original building was constructed in 1923, with additions constructed in 1932, 1938, 1961, and 1973. Although the buildings are adjoining, they consist of various misaligned levels and present a number of operational challenges. The current modernization is intended to make the various buildings on campus more unified both operationally and administratively. Project Status ● Site Work Scheduled From 7/14/2017 to 7/28/2017 ○ Continuation of Auger Cast Piles - (10 remaining) ■ Auger Cast Piles​ are widely used to construct the foundations of all types of structures. ○ Begin Helical Piles ■ Helical piles​ are a factory-manufactured steel foundation system consisting of a central shaft with one or more helix-shaped bearing plates and a bracket that allows attachment to a structure. ○ Continue Installing Pile Caps (North Side) ■ A ​Pile Cap​ is a thick ​concrete​ mat that rests on concrete or timber piles that have been driven into soft or unstable ground to provide a suitable stable foundation. ○ Begin Spread Footer ■ A ​Spread Footing​ is a structural component that acts as a base for a building's foundation.

Bancroft Modernization Project Update – 7/14/2017 ●

Historic Building Work Scheduled From 7/14/2017 to 7/28/2017 ○ Contination of Framing Bulkheads ■ A ​Bulkhead​ is a section of ceiling that has been dropped and boxed-in or enclosed. They are typically used to conceal plumbing pipes, electrical wires, duct work, or exhaust fans. ○ Continuation of Installing Interior Door Frames ○ Continuation of Exterior Repairs ○ Continuation of Interior Frame and Drywall Ceilings ○ Continuation of Blocking Windows ○ Continuation of Interior and Exterior Masonry and Concrete Repairs ○ Continuation of Roofing Demolition and Ice Water Shielding ■ Ice Water Shielding​ are roof leak barriers to help prevent wind-driven rain and melting ice and snow from leaking through the roof deck. ○ Continuation of Roofing Demolition and Ice Water Shielding ○ Continuation of Electrical Home Runs ■ Electrical Home Runs ​are electrical cables that carries power from the main circuit breaker panel to the first electrical box, plug, or switch in the circuit. ○ Continuation of Begin Rough-Ins for Plumbing Fixtures ○ Continuation of Rough-Ins for Mechanical Equipment ○ Continuation of the Layout for Mechanical Ductwork ○ Continuation of Installing Sprinklers in the Attic ○ Begin the Installation of Fan Coil Unit ○ Begin the Utility Work on Newton Street

Community Outreach Update ● N/A

Project Contacts ● Joi Ruffin – DCPS Coordinator of Facility Planning & Design

Please see below for recent photos from the project site.

Bancroft Modernization Project Update – 7/14/2017

Drywall Ceiling and Metal Framing in Classroom

Bancroft Modernization Project Update – 7/14/2017

Mechanical Piping in Corridor

Bancroft Modernization Project Update – 7/14/2017

Conduit for Electrical Panels in Future Electrical Room

Bancroft Modernization Project Update – 7/14/2017

Reinforcing for Spread Footings

Bancroft Construction Project Update 7.14.17.pdf

Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Bancroft Construction Project Update 7.14.17.pdf. Bancroft Construction Project Update 7.14.17.pdf. Open.

1023KB Sizes 0 Downloads 142 Views

Recommend Documents

Ron Brown Construction Project Update 7.7.2017.pdf
Ron Brown Construction Project Update 7.7.2017.pdf. Ron Brown Construction Project Update 7.7.2017.pdf. Open. Extract. Open with. Sign In. Main menu.

Project Renaissance - Dunwoody Green Project Update (Effective 03 ...
Mar 14, 2014 - documents, the city issued an invitation to bid and awarded the construction contract to Georgia Development ... Signature Playground Area.

Project Update - Zillmer Shelter Completed.pdf
Project Update - Zillmer Shelter Completed.pdf. Project Update - Zillmer Shelter Completed.pdf. Open. Extract. Open with. Sign In. Main menu.

PDF Online Construction Project Management
PDF online, PDF new Construction Project Management: A Complete .... the best bid -- Why different types of construction contracts carry different levels of risk ...