Ron Brown Modernization Project Update – 7/7/2017 Prepared on: July 7, 2017 Location: ​4800 Meade Street, NE Ward:​ 7 Design Builder/Architects: ​Gilbane Construction Company Project Manager(s): ​Mia Sensabaugh Project Status: ​Phase 1 Spring 2016; Phase 2 -- August 2017 Construction Start Date: ​Spring 2016 Project Completion Date: ​Summer 2017 General Project Summary ● Ron Brown College Preparatory High School will be a newly renovated school in the existing Ron Brown Middle School. The modernization will include selective demolition and major renovation of the academic and multipurpose wings of the building. Project construction will be phased. Phase 1 opening August 2016, will include a complete modernization of the first floor - administration offices, classrooms, library/media center, multipurpose space and cafeteria. Phase 2, opening July 2017, includes the modernization of the second and third floors - additional administration offices, remaining classrooms, auditorium with support spaces and gymnasium with support spaces. Project Status ● Complete as of 7/7/17 ○ All work on 2nd and 3rd floor complete, except punchlist ○ Basketball gym ○ All work on roof complete, except solar panels ○ Outdoor light poles ● In progress ○ Punchlist - 2nd floor, academic wing, 3rd floor academic wing, and multipurpose wing ○ Gym cleaning ○ Sitework - bioretention and landscaping ○ Stairwell flooring ○ Crawlspace repairs (outside of original scope and will be complete in October) ● Upcoming ○ Fireproof and insulate connector ○ Sitework - tennis court ○ Final inspections on 7/10 ● Delays ○ Punch List--to be complete by 7/10 Project Contacts ● Toussaint Webster​ – DCPS Coordinator of Facility Planning & Design (SIT Coordinator)

Construction Photos

Gym completely finished. Final cleaning today.

Landscaping underway. Installing trees and sod.

Installing stair tread and flooring in stairwell B7.

Replacing glass at connector bridge.

Installing new fence at teacher parking lot and courtyard area

Ron Brown Construction Project Update 7.7.2017.pdf

Ron Brown Construction Project Update 7.7.2017.pdf. Ron Brown Construction Project Update 7.7.2017.pdf. Open. Extract. Open with. Sign In. Main menu.

290KB Sizes 0 Downloads 140 Views

Recommend Documents

Bancroft Construction Project Update 7.14.17.pdf
Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Bancroft Construction Project Update 7.1

Project Renaissance - Dunwoody Green Project Update (Effective 03 ...
Mar 14, 2014 - documents, the city issued an invitation to bid and awarded the construction contract to Georgia Development ... Signature Playground Area.

Project Update - Zillmer Shelter Completed.pdf
Project Update - Zillmer Shelter Completed.pdf. Project Update - Zillmer Shelter Completed.pdf. Open. Extract. Open with. Sign In. Main menu.

PDF Online Construction Project Management
PDF online, PDF new Construction Project Management: A Complete .... the best bid -- Why different types of construction contracts carry different levels of risk ...