Invitation for Bids Date:

18 February 2016

Grant No. and Title:

0352-TAJ: Building Climate Resilience in the Pyanj River Basin Project

Contract No. and Title:

BCR/ICB/CW/2015/4: Procurement of civil works on Climate-proof irrigation infrastructure in Roshtkala and Ishkoshim districts

Deadline for Submission of Bids:

1 April 2016; 15:00h (local time)

1. The Government of the Republic of Tajikistan has received financing from the Asian Development Bank (ADB) towards the cost of Building Climate Resilience in the Pyanj River Basin Project. Part of this financing will be used for payments under the contract named above. Bidding is open to Bidders from eligible source countries of the ADB. 2. The Agency on Land Reclamation and Irrigation (“the Employer”) invites sealed Bids from eligible Bidders for the completion of works on Cleaning of collector-drainage network and bank protection works in Pyanj River, Zong Village Ishkoshim District, Tusiyon Jamoat, Roshtkala District, Trich Village Ishkoshim District, Ishkoshim-Vrang in Vrang Jamoat, Ishkoshim District (“the Works”). 3. International Competitive Bidding will be conducted in accordance with ADB’s SingleStage: One-Envelope bidding procedure and is open to all Bidders from eligible countries as described in the Bidding Document. 4. Only eligible Bidders with the following key qualifications should participate in this bidding: 

Construction experience in: o Excavations over 20,000 m3 o Concrete works over 200 m3 o Laying of plastic pipes 500 m o Cleaning of river bed 2,000 m. o Laying of gabions 8,000 m3 o large size stone 15,000 m3



Financial requirements: o 3 years current soundness and positive net worth in the last year o Average annual construction turnover of USD 767,000.00 within the last 3 years



Participated in 2 contracts in the last 5 years with a participation of USD $470,000.00

5.

To obtain further information and inspect the Bidding Documents, Bidders should contact Agency on Land Reclamation and Irrigation, Project Management Unit, Building climate resilience in the Pyanj river basin, 5/1 Shamsi str., 5th floor Dushanbe, Tajikistan, 734034. From 8:00am to 5:00pm Tel. no.: +992-44-600-33-43; Fax no.: +992-44-600-33-46; E-mail: [email protected]

6.

To purchase the bidding documents in English, eligible bidders should 

Write to address above requesting the bidding documents for Contract No. and Title: BCR/ICB/CW/2015/4; “Procurement of civil works on Climate-proof irrigation infrastructure in Roshtkala and Ishkashim districts”



Pay a non-refundable fee of USD200 (two hundred US Dollars) by check to OSC «Tojiksodirotbank» Bank Account: 20202972800000012101 Correspondent account: 20402972312161 Tax Id: 0410026155 SWIFT: 350101216

7.

Deliver your bid:   

To the address below On or before the deadline 1 April 2016; 15:00h local time Together with a bid security as described in the bidding document

Bids will be opened immediately after the deadline for bid submission in the presence of Bidders’ representatives who choose to attend on 01 April 2016; 15:05h local time, at the following address: 734025, 27 Shotemur str., State Committee on Investments and State Entity Management of the Republic of Tajikistan, tel.: 221-86-59; 221-57-29; 221-89-43

Building Climate Resilience in the Pyanj River Basin Project

Feb 18, 2016 - Fax no.: +992-44-600-33-46;. E-mail: pmo-climateagency@mail.ru. 6. To purchase the bidding documents in English, eligible bidders should.

129KB Sizes 1 Downloads 206 Views

Recommend Documents

HYDROGEOLOGY OF THE HUMBOLDT RIVER BASIN IMPACTS ...
Hydrologic Consultant. 6320 Walnut Creek Road. Reno NV 89523. [email protected]. Prepared for. Great Basin Resource Watch. Reno, NV. Page 1 of 62 ...

Climate change and crop-pest dynamics in the Mediterranean Basin ...
Sep 20, 2016 - I rapporti tecnici sono scaricabili in formato pdf dal sito web ENEA alla pagina ... effects may be mediated by the host plant (bottom-up effects from the lower trophic level), by ... potential losses without crop protection ranging 7

Aragvi River Basin Water Balance.PDF
Aragvi River Basin Water Balance.PDF. Aragvi River Basin Water Balance.PDF. Open. Extract. Open with. Sign In. Main menu.

Alubijid River Basin Hydrologic Modeling in Misamis Oriental for Flood ...
The location of the rain gauges is. PUNO, G. R. & BARRO, R. I. - CMUJS Vol. 20, No.3 (2016) 97-106. Page 3 of 10. Alubijid River Basin Hydrologic Modeling in Misamis Oriental for Flood Risk Management.pdf. Alubijid River Basin Hydrologic Modeling in

Resilience for disaster risk management in a changing climate ...
Request (PDF) | Resilience for disas... | This research is novel as not only investigated how stakeholders frame, but also make sense, of resilience in the context of disaster management and climate change.•Stakeholders interviewed construct the me

Resilience to Natural Hazards and Climate ... - the United Nations
Jun 28, 2016 - placed is a powerful lever to reach the Sustainable Development Goal ... plans, promoting proper application of advances in risk analysis and early ... also aim to fulfill the commitments and targets of the Sendai Framework.

pdf-1876\colorado-river-basin-water-management-evaluating-and ...
... the apps below to open or edit this item. pdf-1876\colorado-river-basin-water-management-evaluat ... ility-by-committee-on-the-scientific-bases-of-colo.pdf.

Oyie Pagulayan of PAGASA- River Basin Approach.pdf
International Disaster Database. Applying River-basin approach in. Early Warning System. Page 4 of 23. Oyie Pagulayan of PAGASA- River Basin Approach.pdf.

Oyie Pagulayan of PAGASA- River Basin Approach.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Oyie Pagulayan ...

River Basin Transact - Forum for Policy Dialogue on Water ...
Mar 30, 2010 - Media, being the reflection of the society also align the news ... 5 Odia and 1 English News Paper, along with other information and analysis related to Odisha's .... Flash Floods which are common in the Lanjigarh village are.

pdf-15104\catchment-and-river-basin-management-integrating ...
... the apps below to open or edit this item. pdf-15104\catchment-and-river-basin-management-inte ... ies-in-water-resource-management-from-routledge.pdf.

Transcript BUILDING RESILIENCE Podcast Interview by Robert ...
implementation of change. John holds a Bachelor of Social Science and a Bachelor of Law. His passion .... tools of the trade, if you like it, at the feet of a true master. RH: And then from that across to action .... by coaching. So there's a much hi

Navigating Social-Ecological Systems - Building Resilience for ...
Navigating Social-Ecological Systems - Building Resilience for Complexity and Change.pdf. Navigating Social-Ecological Systems - Building Resilience for ...

Navigating Social-Ecological Systems - Building Resilience for ...
Download. Connect more apps... Try one of the apps below to open or edit this item. Navigating Social-Ecological Systems - Building Resilience for Complexity and Change.pdf. Navigating Social-Ecological Systems - Building Resilience for Complexity an

Transcript BUILDING RESILIENCE Podcast Interview by Robert ...
Wales and I had a bit of a love-hate relationship with it. Many things I appreciated, invaluable experience, and I found often that there was a conflict between the nature of the work and some of my deeper values, particularly when it came to anythin

Suncor Climate Report - Resilience through strategy.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Suncor Climate ...

Human resilience to climate change and disasters - Royal Society
Nov 5, 2013 - Climate change deliverables include a number of actions to 'Support ..... Business cases are required to assess the overall strength of the ...... impacts are also significant; an impact assessment of 1800 households six months ...

Human resilience to climate change and disasters - Royal Society
Nov 5, 2013 - Wiley Interdisciplinary Reviews: Climate Change 2, 757-766. Adger, W.N. ... alternative plans to avoid extreme climate events. • Access ...... What may happen to climate, natural resources (land, water, energy, forests, fisheries)?.

River Basin Transact - Forum for Policy Dialogue on Water Conflicts in ...
Mar 30, 2010 - ries, comprehending and applying this tool in Indian context is .... Bheden River is heavily polluted due to the industrial effluents. The Bhusan ...

Northwest Carboniferous Basin Natural Gas Project
Tamboran Resources Pty Ltd accepts no responsibility to update any person regarding any inaccuracy, omission or change in information in this ... at Leor Energy LLC. Unconventional Equity. Specialist (Capital One) .... as many jobs as direct employme