RESIDENTIAL BUILDING PERMIT SUBMITTAL GUIDELINES electronic copy of the approved plans will be returned to the applicant from which one full set will need to be printed. If paper plans are submitted, one set of the approved plans will be returned to the applicant. The final approved plans must be kept on-site for the duration of the project.

Basic Information A complete, accurate application will greatly enhance your application experience. The following information and completed forms are necessary for processing your application and must be provided upon permit application submittal:

Professionally engineered documents must carry the engineer’s original stamp and signature, and include a copy of the structural calculations. Photocopies of engineers’ or architects’ seal and signature cannot be accepted.

Assessor’s Parcel Tax Account Number See your tax statement or contact the local County Assessor’s Office. Owner’s Information Provide the owner’s name, address, and phone number. Site Address Provide the correct street address of the property. If no address has been assigned, consult with your jurisdiction to obtain an accurate site address. Contractor Information Owners may act as the builder and construct all portions of a building. However, if the owner hires out any or all of the construction (including plumbing and mechanical), s/he must use a contractor licensed by the state of Washington and provide a copy of the contractor’s license and phone number. To verify your contractor’s licensing, contact the local office of the Washington State Department of Labor and Industries, or go online to: www.LNI.wa.gov . Lender's Information Washington State law requires that the lender’s name, address and phone number shall be posted at the construction site.

Drawings and Plans Plans may be submitted either electronically (preferred) in a .PDF or .DWF file format, or indelible prints on paper, (preferably 11” x 17” or smaller) clearly drawn to scale. If submitted on paper, two complete copies are required. Along with your completed application, all the information identified in this handout must be clearly shown on the design plans, drawings and documents. When the building permit is issued, if submitted electronically, an

CodePros, LLC 1/3/11

Site Plan Site Plan Forms are available at your local jurisdiction. If your lot is served by septic, use a site plan that was approved by the local Health District. Site plans must show all property lines, easements, and buildings, including: decks, porches, roof overhangs, patios and other projections into yards. Contact your local jurisdiction to determine minimum setback requirements. For waterfront property, show all adjacent properties, structures, and natural or man-made water bodies (by name) on the property, with distances shown from the proposed structure to the high-water line. Foundation Plan Show the size and shape of the foundation, anchor bolt size and spacing, holdown types and locations, rebar schedule, size and span of beams, size, spacing and span of floor joists, pier footings, chimney footings, foundation vents, crawl space access, ground cover, and insulation for slab on grade (see also the Foundation Requirements handout). Floor Plan The floor plan must show: • Arrangement of partitions and rooms. • Location of plumbing fixtures, appliances, cupboards, windows and doors (show rough opening sizes), chimneys and fireplaces, smoke detectors, stairs, and handrails.

#51, Residential Building Permit Submittal Guidelines Page 1 of 3

P.O. Box 185 Allyn, WA 98524 CodeProsWA.com

• Structural information on the directions and spacing of structure beams, rafters, and ceiling and floor joists. If trusses are to be used, supply the manufacturer’s truss layout on all spans or styles of trusses being installed. Identify all girder truss locations (see brochure #63—Conventional Light- Frame Construction). • All prescriptive braced wall panel types and locations, or a lateral bracing system (with attached calculations) prepared by an engineer or architect licensed by the State of Washington. The system must include shear wall types and locations, hold down devices, and anchor bolts (see brochures #62—Braced Wall Panels, and #60—Does My Building Design Need Engineering?). Cross Section The cross section must include: • The method of framing, roof pitch, roof braces, amount of overhang, ceiling heights, bearing partitions, posts, beams, foundation, finish grade and backfill. • The sizes and types of all materials. • If applicable, provide whole cross section of stairs showing rise, run, landings and headroom. • If the building is heated, show R values of insulation to be used for ceiling, walls, floors, and foundations. Elevations Elevations must show: • Type, sizes and spacing of all exterior materials. • Windows. • Estimated finished grade. • Roof pitch. • Chimney locations and heights. • Guardrails. Plumbing

Mechanical Show the location of all mechanical and exhaust system components. Please Note: Some heating systems and fuel sources (such as propane) have special conditions that must be followed in order to ensure safety. Propane is prohibited in hazardous locations (pit locations) such as cellars, basements,

1/3/11

Energy: Insulation and Ventilation Requirements

For heated buildings, submit a completed Energy Application with the building permit application. If heat loss calculations are submitted, they must be accompanied by a completed energy application and include the name and phone number of the person who prepared the calculations. All insulation values must be shown on the building plans. For additional information on more specific code requirements that must be identified on the submitted plans, please request a copy of the Plan Review Checklist.

FEES Fees are paid directly to the jurisdiction. Typically, the plan review fee is due at permit application; and the permit fee and any other fees are due upon permit issuance. The Building Permit and Plan Review fees are separate fees based on the established valuation of the proposed building. Ask your jurisdiction for the most recent valuation table as published by the ICC in the Building Safety Journal, as well as the Table 1A of Permit fees. In addition, a $4.50 surcharge is charged on each permit for support of the Washington State Building Code Council. Plumbing and Mechanical Fees Plumbing and/or mechanical fees are assessed based on the number and type of appliances and fixtures. Some jurisdictions waive these fees when associated with another building permit. Manufactured/Mobile Home Permits

Show the location and types of all plumbing fixtures that will be installed.

CodePros, LLC

and under-floor areas where accumulations of “heavier than air” propane can become trapped. Mechanical equipment located in garages that can produce a spark (such as gas or electric furnaces or water heaters) must be located at least 18" above the floor and be protected from physical damage.

The Manufactured/Mobile Home Permit covers the set-up inspections required for installing a manufactured home on site. Separate permits may be required for full foundations or basement systems associated with a manufactured home and are required for additional attached or detached structures and mechanical equipment. Alterations to manufactured homes require alteration permits from Washington State Department of Labor and Industries.

#51, Residential Building Permit Submittal Guidelines Page 2 of 3

P.O. Box 185 Allyn, WA 98524 CodeProsWA.com

ADDITIONAL PERMITS AND REQUIREMENTS Demolition Permit A Demolition Permit is required before demolition of any building. A site plan and fee are required at time of submittal. Electrical Permit An Electrical Permit for electrical work must be obtained from Washington State Department of Labor and Industries (L&I). L&I performs all electrical inspections. Fire Sprinkler Permits When buildings require, or are provided with automatic sprinkler systems, a separate sprinkler system permit must be obtained. Three copies of plans and specifications with the necessary forms and fees are required.

• If the building site has an on-site septic system or well, contact the local Health District to obtain approval. If the building site is served by public water and/or sewer, contact your water purveyor to obtain a water availability letter and a sewer letter, then provide copies with your building permit application.

The Building Permit Process Plans Examiners review your plans and identify any potential code conflicts. If the plans are incomplete or incorrect, the plans examiner requests additional or corrected information. Planners review your site plan, setbacks and environmental impacts for compliance with zoning, flood hazard and critical area codes and ordinances. Storm-water engineers review your site plan and drainage plans for compliance with storm-water management requirements.

Erosion Control Requirements Minimum requirements for erosion control are contained in local ordinance or Washington State Department of Ecology regulations. Installation of residential erosion control facilities is inspected during foundation inspection. Maintenance of erosion control facilities is inspected during subsequent building inspections. Sewered Properties

Once the plans are approved, the permit will be approved for issuance. Upon payment of the permit fees, the permit will be issued and construction may begin. During construction, inspectors visit the construction site to ensure that the project complies with the locally adopted code requirements. See the Inspection Requests brochure for details and information on how to schedule an inspection.

A backwater valve is required on the building sewer if the residence is below the upstream manhole cover per Section 710 of the Uniform Plumbing Code. Water and Sewer/Septic Approval You must provide evidence of an adequate water supply and sewage disposal system for the property where the structure is to be built. The following projects typically require jurisdictional approval: • New construction (houses, garages, accessory buildings, etc.); • All decks over 30" above grade and all covered decks; • Additions where there is an increase in the floor area which extends beyond the original exterior walls; and • Alterations or remodeling where the total number of bedrooms is increased.

CodePros, LLC 1/3/11

#51, Residential Building Permit Submittal Guidelines Page 3 of 3

P.O. Box 185 Allyn, WA 98524 CodeProsWA.com

RESIDENTIAL BUILDING PERMIT SUBMITTAL ...

subsequent building inspections. Sewered Properties. A backwater valve is required on the building sewer if the residence is below the upstream manhole cover.

94KB Sizes 1 Downloads 223 Views

Recommend Documents

RESIDENTIAL BUILDING PERMIT SUBMITTAL ...
ensure safety. Propane is prohibited in hazardous ... plan, setbacks and environmental impacts for compliance with zoning, flood hazard and critical area codes ...

Residential Accessory Building Permit Process
Residential Accessory Building. Permit Process. 10 to 21 business days. * Permit Package includes but is not limited to: 1. 1 permit application with all required ...

new residential permit application.pdf
Applicant: □ Owner □ Lessee □Contractor □ Architect □Engineer □Other: ... Building Frame: □ Wood □ Masonry □ Other_______________ Roof Type: ... new residential permit application.pdf. new residential permit application.pdf.

Commercial Building Permit Process - Sign in
Commercial Building Permit Process. 10 to 21 business days for each submittal. Important. A Grading Permit is required for all Commercial Projects. * Permit ...

Mechanical Electrical Plumbing MEP - Building Permit Application.pdf ...
Page 1 of 1. Mechanical Electrical Plumbing MEP - Building Permit Application.pdf. Mechanical Electrical Plumbing MEP - Building Permit Application.pdf. Open.

RESIDENTIAL BUILDING ELECTRIFICATION NOTES 2.pdf ...
Page 3 of 44. RESIDENTIAL BUILDING ELECTRIFICATION NOTES 2.pdf. RESIDENTIAL BUILDING ELECTRIFICATION NOTES 2.pdf. Open. Extract. Open with.

Lakemoor New Building Permit Application Final 9 2013.pdf ...
is performing multiple scopes, they must. be listed for each scope. Any contractor. must have an appropriate licensing and. must provide proper insurance. Section VI – Applicant Information. This section is used to provide information. about the ap

Lakemoor New Building Permit Application Final 9 2013.pdf ...
Section V - Contractor Information - List each applicable contractor name, address and phone number and license number. General/Architect. Electrician.

Building Permit Application 8 5x14.pdf
DESCRIPTION. OWNER PHONE. MAIL ADDRESS MOBILE PHONE. OWNER REPRESENTATIVE or TENANT PHONE. MAIL ADDRESS MOBILE PHONE.

Landscape - Plan Submittal Requirements.pdf
o Show the location and dimensions of all existing and proposed structures, property. lines, easements, parking lots, and drives, roadways and rights-of-way, sidewalks, bike. paths, trails, ground signs, refuse disposal and recycling areas, fences, w

PERMIT FEES
PERMIT FEES. Total Valuation. Fee x 0.65. $1.00 to 1,100.00. $ 36.00. $1,101.00 to 1,200.00. $ 38.50. $1,201.00 to 1,300.00. $ 41.25. $1,301.00 to 1,400.00.

CITY OF MESQUITE PERMIT #
Unit. Owner. Phone Number ( ) ... Use □ Single Family Detached □ Single Family Attached □ Multi-Family ... Permittee is to build according to above description and to the approved plans and specifications of the Building Code and to submit.

Wall/Fence Permit Process
Permit Package includes but is not limited to: 1. 2 site plans showing location of wall on property. 2. 2 engineered wall details or 1 copy of City Wall Standards. 3. 1 soils report (if required for retaining wall). 4. 1 signed permit application. 5.

CISCO VC SUBMITTAL FORM.pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying.

Permit Applicaton.pdf
Applicant Name: Business Name: Email: Phone Number: Project Address: Block: Lot: Project Valuation: $ Project Sq. Ft : A/C:______ Non-A/C:______.

Residential Bldg
1 pad certification due at submittal or finish floor elevation certificate due prior to ... 2 pre-engineered truss drawings with hangar hardware called out if used. 5.

Temporary Use Permit
:​______ ​Zip:​______. Phone: Fax: E-Mail Address: Applicant:​ Name:​. Address: City: State: ______ Zip: ______. Phone:​. ​Fax: E-Mail Address: Contact Person and Information: Date of Event and time: ... Business License Verification: F

Business Permit Form.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Business Permit ...

Permit Re-App1_typer.pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying.

Electrical Permit Application.pdf
... and Occupations. State Electrical Board. Page 1 of 2 ... Page 2 of 2. Electrical Permit Application.pdf. Electrical Permit Application.pdf. Open. Extract. Open with.