Eagle Harbor Township Zoning Permit Instructions and Application Where to Apply and Get Information: Eagle Harbor Township – Zoning Administrator 321 Center Street Eagle Harbor, MI 49950 (906) 289-4407 www.eagleharbortwp.org

ALL APPLICATIONS WILL BE SUBMITED TO THE ZONING ADMINISTRATOR (EHT Zoning Ordinance Article 18.5.1). APPLICATION MATERIALS AND FEES ARE DUE PRIOR TO PERMIT APPROVAL AND COMMENCEMENT OF ANY WORK (EHT Zoning Ordinance Article 18.7) All applications must be made with full knowledge and written consent of all owners of the property in question. This requirement shall include, but is not limited to, the consent of a land contract seller to the relief sought by a land contract purchaser. All applications must be signed by all property owners. What Constitutes A Complete Submittal (EHT Zoning Ordinance Article 18.8)? The following shall be required to be submitted to the Township Zoning Administrator: 1. Completed Application Form (Attached) 2. Supplemental information or Permits that may be required Building Permit Application Septic Permit or septic field review Well Permit Soil Erosion Permit 911 Address Culvert Permit MI DEQ Permits Other Permits or Information as required by the Zoning Administrator 3. Four (4) copies of a complete Site Plan (See Below) 4. Once the application, site plan, and all other permits are deemed complete and accurate by the Zoning Administrator and all fees are paid in full, you will be contacted by the Zoning Administrator. Fees are nonrefundable. Site Plan Requirements (EHT Zoning Ordinance Article 18.8.2) 1. Minimum Site Plan Submittal shall be based on a mortgage survey or land survey prepared by a registered land surveyor or registered engineer. 2. The plan must be drawn to scale. 3. The plan must include property lines and dimensions, all structures and buildings (existing and proposed), all setback dimensions, driveways, easements, and right of ways. Building Permit Applications 1. One copy of the Building Permit Application, elevation drawings, floor plans and other drawing as required by the building inspector for building permit applications will be submitted with the zoning application. The Parcel I.D. Number can be found on your tax bill and zoning can be found at the Township web site at www.eagleharbortwp.org on the Eagle Harbor Township Zoning Map. When to Apply Thirty (30) days prior to the start of construction. If a variance is required, additional time will be needed for a Zoning Board of Appeals Hearing. Duration of Approval (EHT Zoning Ordinance Article 18.7.12) The Zoning Permit once approved is valid for one (1) year. Please Note: Submission of this signed application conveys the right to the Zoning Administrator and Staff of Eagle Harbor Township and/or their designees, to enter and access the subject property and to request access to any and all structures on the subject property. See Eagle Harbor Township Zoning Application Fee Schedule ALL COSTS ARE THE RESPONSIBILITY OF THE APPLICANT. Additional fees may be required for consulting, hearings or other services. Rev 2.2

Eagle Harbor Township Zoning and Building Permit Process EHT Zoning Ordinance Article 18.7 – 18.10

START HERE Obtain Zoning Packet

Pre-submittal Meeting Optional

Zoning Permit Application

Possible Supporting Information

with Site Plan and other required Supporting Information

Septic Permit Well Permit Soil Erosion Permit 911 Address Permit

Plans Reviewed

Culvert Permit Submit Revisions and /or Fees

Plans Approved and Fees Paid?

DEQ Permits Building Permit Application and required drawings

No

Yes

ZBA Appeal

Zoning Denied

Zoning and/or Building Permit Issued Yes

Perform Work Perform Corrections

Zoning and/or Building Inspections Passed

No

Yes

Certificate of Occupancy and/or Zoning Compliance Issued

Rev 2.2

EAGLE HARBOR TOWNSHIP ZONING PERMIT & COMPLIANCE APPLICATION 321 Center Street • Eagle Harbor, MI 49950 • (906) 289-4407 • FAX (906) 289-4462 Date

Parcel ID Number

ALL INFORMATION IS REQUIRED

Property Owner(s) Name

Applicant(s) Name

Mailing Address

Mailing Address

City

State

Day Phone

Zip Code

City

Evening Phone

State

Day Phone

Zip Code

Evening Phone

THIS APPLICATION MUST BE SIGNED BY THE PROPERTY OWNER(S) OR THE OWNER(S) MAY PROVIDE A LETTER AUTHORIZING THE APPLICANT TO ACT ON THEIR BEHALF (EHT ZONING ORDINANCE ARTICLE 18.7.1). Current Zoning of Property

Location of Property:

Property Address

Total Acreage Road.

side of

Between

Roads.

and

List below or attach legal description of property.

List below or attach all Deed restrictions on property.

AN APPROVED ZONING PERMIT IS REQUIRED FOR ALL WORK AND BEFORE ANY WORK COMMENCES (EHT ZONING ORDINANCE ARTICLE 18.8.1). AN APPROVED ZONING PERMIT MUST BE ISSUED PRIOR TO APPLYING FOR A BUILDING PERMIT. Describe change or work to be performed. (Note: Deviation from the described work constitutes a zoning violation.)

A SURVEY OR SCALE DRAWING SHOWING ALL PARCEL DIMENSIONS, ADJACENT ROADS, EXISTING BUILDINGS, PROPOSED WORK AND STRUCTURES AND SETBACKS MUST ACCOMPANY THIS APPLICATION (EHT ZONING ORDINANCE ARTICLE 18.8.2). I certify the information on and accompanying this application to be complete, true and correct under penalty of perjury by the laws of the State of Michigan. I also hereby grant permission for members of the Planning Commission and township staff to enter the above described property for the purpose of gathering information related to this application. Authorized Signature(s) & Date (Letter of authorization required if other than property owner):

DO NOT WRITE BELOW THIS LINE – EAGLE HARBOR TOWNSHIP USE ONLY Date Received

Case Number

Application Fee

Receipt Number

Septic Permit Number

Well Permit Number

Soil Erosion Permit Number

Culvert Permit Number

Critical Dune Permit Number

DEQ Permit Number

911 Address Number

Other

ZONING PERMIT APPROVAL APPROVED Zoning Administrator Signature

CERTIFICATE OF ZONING COMPLIANCE APPROVED DENIED

DENIED Date

Zoning Administrator Signature

Date

APPROVED ZONING PERMIT IS VALID FOR ONE (1) YEAR

Rev 2.2

Eagle Harbor Township Zoning Permit Application Rev 2_2.pdf ...

Page 1 of 3. Rev 2.2. Eagle Harbor Township. Zoning Permit Instructions and Application. Where to Apply and Get Information: Eagle Harbor Township – Zoning Administrator. 321 Center Street. Eagle Harbor, MI 49950. (906) 289-4407. www.eagleharbortwp.org. ALL APPLICATIONS WILL BE SUBMITED TO THE ZONING ...

154KB Sizes 0 Downloads 232 Views

Recommend Documents

Eagle Harbor Township Sign Permit Application Rev 1.pdf ...
321 Center Street • Eagle Harbor, MI 49950 • (906) 289-4407 • FAX (906) 289-4462. Date Parcel ID Number ALL INFORMATION IS REQUIRED. Property Owner(s) Name Applicant(s) Name. Mailing Address Mailing Address. City State Zip Code City State Zip C

Eagle Harbor Township Special Land Use Permit Application.pdf ...
Page 3 of 4. Eagle Harbor Township Special Land Use Permit Application.pdf. Eagle Harbor Township Special Land Use Permit Application.pdf. Open. Extract.

Eagle Harbor Township Contractor Affidavit Rev 1.pdf
Eagle Harbor Township Contractor Affidavit Rev 1.pdf. Eagle Harbor Township Contractor Affidavit Rev 1.pdf. Open. Extract. Open with. Sign In. Main menu.

Eagle Harbor Zoning Map 02 2014.pdf
32. Rich Probst, Jr, Supervisor, Eagle Harbor Township. 0 0.5. miles. 09. 04. 33. 1. 18 17 16. Page 1 of 1. Eagle Harbor Zoning Map 02 2014.pdf. Eagle Harbor ...

Eagle Harbor Chart 14964_3.pdf
Eagle Harbor Chart 14964_3.pdf. Eagle Harbor Chart 14964_3.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Eagle Harbor Chart 14964_3.pdf.Missing:

Permit-Application-UMN.pdf
DEP/LINE #. PERMIT #:. APPROVAL DATE: PREV APP DATE: PREV APP DATE: INSTRUCTIONS TO APPLICANT. Minnesota Statute 147.0391 RESIDENCY ...

Permit-Application-UMN.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

Permit-Application-UMN.pdf
RIGHTS OF SUBJECTS OF DATA. NOTE: This section is to be completed by the residency program in Minnesota, only following completion of. the foregoing ...

Permit Application Checklist.pdf
The Designer that prepares the permit drawings is responsible to ensure that they provide ... Permit Application Checklist.pdf. Permit Application Checklist.pdf.

The Greenfield Township Zoning Board met Thursday ...
The Greenfield Township Zoning Board met Thursday, February 25, 2010, 7pm at the Greenfield. Township Firehouse, 3245 Havensport Road, Carroll, Ohio. Those present were Chairman Bob Paulus,. Board members Larry Swartz, Jim Beiter, Brian Flynn, Zoning

The Greenfield Township Zoning Board met Tuesday, August 16, 2011 ...
motion carried. Bill Pool passed out zoning resolutions for helipads as prepared for Pleasant Township by Fairfield. County Regional Planning to Board members not present at the July meeting. Jim Beiter questioned if the helicopter engines are kept r

Application for Zoning Certificate.pdf
Phone 513-738-8279. APPLICATION FOR ZONING CERTIFICATE. Type of work Application No.______. ____New Building. ____Repair Fee Paid ______.

Work Permit application Historic Preservation Commission.pdf ...
plans. The Designer's/Architect's/Engineer's name, address, phone number, and State License Number. (if applicable, see next page) shall be noted on the ...

Film Permit Application.2016.pdf
... Date ____/____/20___ Multi-day Dates ____/____/20___ - ____/____/20___. Production Title: Location: public private. Contact Person: (24-7) Cell Phone: ...

Permit Application Checklist Complete.pdf
Page 1 of 15.. Email: [email protected] P.O. Box 38. Website: www.townofkearney.com 8 Main Street. Phone: 705 636 7752 Kearney, Ontario.

Work Permit Application Form.pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Work Permit Applicat

Work Permit Application 2016.pdf
California Department of Industrial Relations, Division of Labor Standards ... at http://www.dir.ca.gov/DLSE/dlse.html. Page 2 of 2. Work Per ... 2016.pdf.

POOL / SPA / WATER FEATURE PERMIT APPLICATION
Permit Covers □ Pool □ Spa □ Water Feature ... USE □ Commercial □ Private ... I also certify that all Subcontractors working on this permit are licensed.

Comprehensive Permit Application - November, 2013.pdf ...
Page 3 of 6. Comprehensive Permit Application - November, 2013.pdf. Comprehensive Permit Application - November, 2013.pdf. Open. Extract. Open with.

Permit Application Checklist Complete.pdf
Page 1 of 15.. Email: [email protected] P.O. Box 38. Website: www.townofkearney.com 8 Main Street. Phone: 705 636 7752 Kearney, Ontario. Fax: 705 636 0527 POA 1M0. WHEN ARE BUILDING PERMITS REQUIRED? In general, a building permit is required to

Hamilton Township Police Department 2017 application packet.pdf ...
Hamilton Township Police Department 2017 application packet.pdf. Hamilton Township Police Department 2017 application packet.pdf. Open. Extract.

EMPLOYMENT APPLICATION REV FY15.pdf
Whoops! There was a problem loading more pages. EMPLOYMENT APPLICATION REV FY15.pdf. EMPLOYMENT APPLICATION REV FY15.pdf. Open. Extract.

Lakemoor New Building Permit Application Final 9 2013.pdf ...
is performing multiple scopes, they must. be listed for each scope. Any contractor. must have an appropriate licensing and. must provide proper insurance. Section VI – Applicant Information. This section is used to provide information. about the ap