No.AIRF/24(C)

Dated: August 29, 2014

The General Secretaries, All Affiliated Unions, Dear Comrades, Sub: Feedback of the meeting of the Fast Track Committee A meeting of the Fast Track Committee, constituted to resolve those issues which could not be deliberated in the meeting held on 07.02.2014 between the Railway Board and Federations, was held today under the convenership of the EDE(IR), Railway Board. Though the meeting was satisfactory to some extent, following decisions were arrived:1.

Induction of Course Completed Act Apprentices against Safety vacancies On the issue of engagement of Act Apprentices, a Note will be prepared and put-up to Board, emphasizing on their regularization in the Railways.

2.

LARSGESS – Clarification relating to period of 20 years in the Safety Posts for LARSGESS, entitlement to be reviewed For LARSGESS, orders already issued for inclusion of Electric Power, Bridge, TRD, Track Machine, Track Khalasi(PWI Khalasi) working on the track, will be amended, and the word “working on track” will be removed, as has been assured by the EDE(IR), Railway Board, after consultation with the EDE(N). The employees, whose categories have been changed on administrative ground or those who have been re-deployed, their period will always be treated as Continuous Period in Safety Posts. They might have remained in any Safety Category. Those who have changed their categories on request or have joined on request transfer, for them it will be mandatory that they should have minimum 10 years service on that post to avoid any fraudulent motive in future.

3.

Upgradation of posts from apex level Group `C’ posts to Group `B’ posts (Gazetted)(3335 posts) On this issue, it has been agreed to by the Railway Board that EDPC-I, Railway Board, will pursue the matter with Ministry of Finance. While raising this issue, AIRF stated that, in the Standing Committee Meeting of the NC/JCM, it was made clear by the Secretary(Expenditure) that Railways can create these posts at their own. Finally it was agreed that this issue will also be kept in view.

4.

Parity in pay structure of Stenographers in Railways at par with CSS/RBSS So far this issue is concerned, case file will be put up to EDE(IR), Railway Board, who, after going through the same, will discuss the matter with the members of the Committee. Thereafter, the issue will be finalized.

Feedback of the meeting of the Fast Track Committee.pdf

There was a problem previewing this document. Retrying... Download. Connect more apps... Feedback of ... ommittee.pdf. Feedback of t ... Committee.pdf. Open.

89KB Sizes 0 Downloads 98 Views

Recommend Documents

Feedback of the meeting of the Fast Track Committee.pdf ...
There was a problem loading this page. Feedback of the meeting of the Fast Track Committee.pdf. Feedback of the meeting of the Fast Track Committee.pdf.

Fast Track Communication
May 25, 2010 - This communication continues the thread of [1, 4] and [5], where the belief propagation. (BP) algorithm ... Our results. In this communication, we develop an LS-based approach to describe the quality ...... 1/N. Though the conjecture a

CALL FOR FAST TRACK PROPOSALS
CALL FOR FAST TRACK PROPOSALS. Computer Communication (COMCOM) Journal http://www.elsevier.com/locate/comcom. Computer Communications ...

CALL FOR FAST TRACK PROPOSALS
CALL FOR FAST TRACK PROPOSALS. Computer Communication (COMCOM) Journal http://www.elsevier.com/locate/comcom. Computer Communications ...

Minutes of the 135th Meeting of the
173.9 Three Year Strategic Plan and One Year Action. Plans were endorsed ... Year 1 Central application summary was tabled. Total .... Other Business. 174.22.

FAST-TRACK REPORT Differential development of ...
Swiss Center for Affective Sciences, University of Geneva, Switzerland ... Service MØdico-PØdagogique, Department of Child Psychiatry, University of Geneva Medical School and .... Data were analyzed using the AFNI software package .... in all 44 pa

Download-This-File-The-Fast-Track-.pdf
"Digi-Flat" era requires a sharp new approach, one that Dane Sanders has practiced successfully and taught at Fast Track. workshops and seminars all around ...

eBook Download German: Fast Track Learning: The ...
... …The Canadian Used Car Guide book download Daniel Heraud Download ... News analysis and research for business technology professionals plus peer ...

When is it optimal to delegate: The theory of fast$track ...
URL: http://bilgehan.karabay.googlepages.com. §Department of ... URL: http://people.virginia.edu/jjem6x. ..... ensure that we get an interior solution in prices.

When is it optimal to delegate: The theory of fast$track ...
May 2, 2013 - better at playing the Congressional tariff$bargaining game and so have an .... :i denote the amount of good 5 produced in a district that hosts ...

University of Idaho - Tenure-Track Position The Department of ...
teaching of courses that will complement the broader Geography discipline and ... of life and was recently ranked among the top 10 college towns in the US.

WF419 Fast track R6.pdf
Page 1 of 7. # tsWF419 RevF 03/31/2011 1. Fast Track Troubleshooting. Publication # tsWF419 Revision Date 03/31/2011. Quick Test Mode. Note: This test erases all faults and memory: To enter press Spin, Soil, & Power. simultaneously with the power off

Joint Venture Fast Track
... And Profit FromThemInThe.. Joint Venture FaithfulTrack -. Page 2 of 2. 1499336727350jointadvanceliketheclappersofhellimprintspartnershipinpharma.pdf.

Fast Track Admissions for MUIC.pdf
Page 1 of 1. Division of Student Services. 999 Phutthamonthon 4 Rd., Salaya, Phutthamonthon, Nakhon Pathom 73170, Thailand. Tel.+662-441-0950 Fax.+662-441-0953. www.muids.mahidol.ac.th. Fast-track admission to MUIC for MUIDS Students. The requirement

Fast Track Committee constituted.PDF
Page 1 of 1. fry-_ w,3:ff+*". , y{ -ai::=- - *q t& r*iiwf F*,i "wg1-r"T"r_.U. Aa.*. firW a-,1J;-.;1X tr'F" '. v l, . In the foufth meeting of the Fast Track Committee held on 10.11.2014, the following issues were deliberated upon: 1. Induction of Cou

Fast-Track Implementation Climate Adaptation - Climatelinks
The Integrated Water and Coastal Resources Management Indefinite Quantity Contract (WATER ... ii. FAST TRACK IMPLEMENTATION OF CLIMATE ADAPTATION ..... and Increased Vulnerability/Renewable and Conventional Energy Assets .