Invitation for Bids Date:

18 March 2016

Loan No. and Title:

40173-044- PNG: Highland Region Road Improvement Investment Program (HRRIIP) – Project 3 CSTB No. 3533: Improvement and Long Term Performance Based Maintenance Services for the Henganofi - Nupuru Road, Eastern Highlands Province

Contract No. and Title: Deadline for Submission of Bids: 1.

11 May 2016 at 10.00 a.m. (Local Time)

The Independent State of Papua New Guinea has applied for a loan from the Asian Development Bank (ADB) towards the cost of Highland Region Road Improvement Investment Program (HRRIIP)- Project 3. Part of this loan will be used for payments under the contract named above. This contract will be jointly financed by European Union and GoPNG. The eligibility rules and procedures of the ADB will govern the bidding procedures. Bidding is open to Bidders from eligible source countries of the ADB.

2. The Independent State of Papua New Guinea (“the Employer”) represented by the Secretary of the Department of Works (DoW) invites sealed bids from eligible Bidders for the improvement works and maintenance services for the 34 km Henganofi - Nupuru Road in the Eastern Highlands Province. The Improvement Works to be carried out in 24 months will be administered by the Department of Works (DoW) and consist of the following:              

Clearing the right-of-way; Trimming and shaping the existing road formation and subgrade to form a road bed; Constructing and testing of embankments to form road bed; Hauling and disposing of all unsuitable material; Stockpiling excavated material for embankment construction; Excavating and removing unsuitable material from soft spots and backfill, including providing and placing a geofabric filter layer where directed; Excavating, trimming and shaping drainage ditches and forming cut batters; Excavating and disposing of overburden from borrow pits; Extracting, crushing, grading and testing material for capping layer, sub-base, base course and concrete; Hauling material for construction of capping layer, sub-base and base course; Pavement surfacing with double bituminous seal; Checking and ensuring that roads, including hauling routes, are capable of carrying construction traffic and undertaking maintenance as necessary; Installing new culverts including headwalls, curtain walls, aprons and associated works; Cleaning and removing debris as well as silt from inlets and outlets of silted-up or blocked existing culverts;

  

Installing road furniture including guardrails, traffic regulatory and control signs, culvert marker posts, and fenders at bridge sites; and Refurbishment of existing bridges Routine maintenance during the Defects Notification Period

Long Term Performance Based Maintenance services will be administered by the National Roads Authority (NRA) for a period of five (5) years following the issuant of the Taking over Certificate for the Improvement Works. For these services, payment will be based on the level of performance achieved. Maintenance services include the following:         

Vegetation Control; Pothole patching and pavement repair; Crack Sealing; Edge failure repair; Shoulder reinstatement; Drain and culvert clearing; Guardrails replacement, Resealing of 34 km road, and Emergency Works, if necessary

3. International Competitive Bidding will be conducted in accordance with ADB’s SingleStage: One-Envelope without Prequalification procedure and is open to all Bidders from eligible countries as described in the Bidding Document. 4. Only eligible bidders with the following key qualifications should participate in this bidding:  

 

 

have a minimum of 5 years general construction experience have successfully completed at least one contract during the last five years of similar size and nature to the subject contract and of value greater than USD22.00 Million equivalent have a minimum average turnover over for the last three years of USD20.00 Million equivalent have sufficient working capital and lines of credit to cover the running costs of the subject contract together with existing contract commitments for construction period of 24 months. have a positive net worth calculated as the difference between total assets and total liabilities. have no pending litigation which if resolved against the Bidder would represent more than 50% of the Bidder’s net worth.

5. To obtain further information and inspect the bidding documents, bidders should contact: The Secretary Department of Works Waigani Drive, Boroko National Capital District Telephone:+675 324 1114 e-mail: [email protected] facsimile: +675 324 1102

6. To purchase the bidding documents in English, eligible bidders should: 





submit a written application to the Chairman of the Central Supply and Tenders Board (CSTB) at the address shown below, requesting the bidding documents for CSTB No 3533: Improvement and Long Term Performance Based Maintenance Services for the Henganofi - Nupuru Road in Eastern Highlands Provinces and pay a non-refundable fee of K800.00 or equivalent US Dollar amount by cash or bank draft. copies of the Department of Works Specification for Road and Bridge Works 1995 and the General Conditions of Contract (Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer, Multilateral Development Bank Harmonized Edition June 2010 prepared by FIDIC) will be provided to Bidders as a part of the Bid Documents. an extra fee of K 650.00 or equivalent US Dollar amount should be added if courier service is required.

7. Bids should be delivered to: 

The Chairman Central Supply and Tenders Board (CSTB) First Floor, Westpac Waigani Branch Building, Waigani Drive Port Moresby National Capital District Papua New Guinea

 

on or before the deadline: 11 May 2016 at 10:00 a.m. (Local Time). Together with a Bid Security / Bid Securing Declaration as described in the Bidding Document.

8. Bids will be opened at the CSTB Office immediately after the deadline in the presence of those bidders’ representatives who choose to attend.

Highland Region Road Improvement Investment Program (HRRIIP)

Mar 18, 2016 - Waigani Drive, Boroko. National Capital District. Telephone:+675 324 1114 e-mail: [email protected] facsimile: +675 324 1102 ...

162KB Sizes 11 Downloads 247 Views

Recommend Documents

3291/3292(SF)-GEO: Urban Services Improvement Investment Program
Mar 10, 2016 - the Urban Services Investment Program – Tranche 5. Part of this loan will be used for payments under the contract named above. Bidding is ... Financial Resources: The Bidder must demonstrate that it has the financial resources to mee

3291/3292(SF)-GEO: Urban Services Improvement Investment Program
10 Mar 2016 - the Urban Services Investment Program – Tranche 5. Part of this loan will be used for ... sealed bids from eligible bidders for the improvement of the sewage system in Zugdidi, in particular, the main ... System in Zugdidi;. • pay a

Second Integrated Road Investment Program [RDA/ADB/iROAD-2 ...
Jun 29, 2017 - RDA/ADB/iROAD-2. (UVA)/NCB/MO-01. Rehabilitation / Improvement and maintenance of. 63.76 km rural roads in Monaragala district in the ...

North-South Road Corridor Investment Program - Asian Development ...
Sep 30, 2015 - Works on the support layers will be carried out in the same time with carriageway repairing ... Standard Chartered Bank, New York, USA, Addr:.

North-South Road Corridor Investment Program - Asian Development ...
Sep 30, 2015 - Part of this financing will be used for payments under the Contract ... repairing of carriageway layer structure, treatment of support surface layers ...

2015-2016 Highland Forest Campus Improvement Plan.pdf ...
... stations/centers. Page 4 of 29. 2015-2016 Highland Forest Campus Improvement Plan.pdf. 2015-2016 Highland Forest Campus Improvement Plan.pdf. Open.

Mahaweli Water Security Investment Program - Asian Development ...
Dec 8, 2015 - Part of this loan will be used for payments under the Contract named above ... Interested bidders can also visit the site on 22 ... person signing the bid. 8. Late bids shall be rejected and electronic bidding shall not be permitted.

Rajasthan State Highway Investment Program - Asian Development ...
Feb 8, 2016 - that appeared in ADB website on 8 January 2016. The eligibility rules ... under Design, Build, Operate/ Maintain and Transfer on Annuity Mode.

Karnataka Integrated Urban Water Management Investment Program
Jun 29, 2017 - Part of this financing will be used for payments under the contract named above. Bidding is open to all Bidders from eligible source countries of ...

Program Belgrade investment days.pdf
... AM - B2B Meetings, Sava Centre, Milentija Popovica 9, Belgrade. Whoops! There was a problem loading this page. Retrying... Program Belg ... ent days.pdf.

Karnataka Integrated Urban Water Management Investment Program
Jun 29, 2017 - Bidders may obtain further information on the bidding documents at the Office of The. Superintending Engineer, KIUWMIP Cell, PIU, KUIDFC, ...

3096-PAK: Power Distribution Enhancement Investment Program ...
Apr 12, 2016 - and it intends to apply part of the proceeds of this loan to payments under the ... The Quetta Electric Supply Company Limited (QESCO, “the ...

Highland Games.pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying.

Conduct of District Continous Improvement (CI) Program Kumustahan ...
Page 1 of 1. Conduct of District Continous Improvement (CI) Program Kumustahan.pdf. Conduct of District Continous Improvement (CI) Program Kumustahan.pdf.

pdf-16\the-low-road-a-novel-the-highland-gazette ...
GAZETTE MYSTERY SERIES) BY A. D. SCOTT PDF. Page 1 of 32. Page 2 of 32. Click link bellow and free register to download ebook: THE LOW ROAD: A NOVEL (THE HIGHLAND GAZETTE MYSTERY SERIES) ... PRAISE FOR NORTH SEA REQUIEM: "An atmospheric mystery, with

100 Addition - Highland Local Schools
3. 1. 5. 1. 5. 0. 3. 4. 2. 1. + 9. + 5. + 3. + 1. + 0. + 7. + 4. + 7. + 6. + 0. 2. 7. 6. 3. 6. 5. 1. 6. 8. 0. + 2. + 4. + 6. + 6. + 1. + 9. + 2. + 3. + 6. + 3. 6. 7. 5. 3. 4. 0. 4. 5. 1. 9. + 7.

(Highland Spies) By Victoria Roberts
Jun 23, 2015 - when a menacing threat follows them on their journey, Fagan's grudging tolerance for Grace turns to respect ... Most helpful customer reviews.

2018 Highland Bulldogs Pitching Camp.pdf
Page 1 of 1. HIGHLAND BULLDOGS. PITCHING CAMP. WHO: Grades 3rd – 8th. WHEN: Friday, January 12th, 2018 | Saturday, January 13th, 2018. TIMES: Friday Times: Grades 3rd, 4th, and 5th - 6:00 pm to 7:30 pm. Grades 6th, 7th, and 8th – 7:30 pm to 9:00

Highland Learning Lab Schedule.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Highland ...Missing:

Glengarry Highland Games 2017.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Glengarry ...

highland terrace - tuesday take home -
Writing Project and is a Highland Terrace “Response to Intervention” coach. We hope to see you all there to celebrate Ms. Edy receiving this award. MSP Testing ...

Region Presentation.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Region ...