Frequently Asked Questions Why is now the best time to update our facilities? The Long Range Planning Committee and the District determined there is a compelling need to renovate our Middle and High Schools. The District has been good stewards of taxpayers’ dollars allowing for the debt from the 1999 elementary school project to retire early, which creates an opportunity to renovate our facilities without a large fluctuation in the tax rate. Additionally, interest rates are at a historic low. Why does the learning environment need updating? Tech Ed - There is a growing demand for skilled trades and professionals in manufacturing, engineering and design in our region. Our goal is to integrate more STEM (Science, Technology, Engineering and Math) education into our traditional technical education program. However, the current layout of our classrooms limits the ability to incorporate technology and equipment to provide hands-on learning.

Why does the Middle School need a new gym? The current middle school gym is inadequate to meet the physical education needs of middle school students. Specifically, the height dimensions of the ceiling limits the curriculum options of our physical education classes and after school activities. Constructing a new gym with appropriate dimensions would enable us to fully utilize the gym area with classroom activities and sports, as well as recapture the lost gym space that occurred during the remodeling of the High School, which turned Rose Hall into the library and theater.

KEWASKUM

With Kewaskum Career Academy (KCA) in the conceptual plan of the High School, what would become of the current KCA? By moving the KCA back into the High School, we would be able to move the district office space into the KCA building. This would allow the District to save on rent costs associated with the use of the Regal Ware building. Why do you need more space? Kewaskum Middle School was built in the 1970s when the enrollment and learning space considerations were much different. Per School Planning & Management’s 20th Annual School Construction Report, the regional median square feet per student at the middle school level is 207.2. With a student population averaging just above 400 students over the last few years, the “right-sized” middle school should be between 80,000 to 85,000 square feet. Our current middle school is roughly 58,000 square feet. The new construction, which would connect the middle and high schools, would help make KMS the “right-size”. The addition would include science labs that would allow all students to participate in labs and a gym that would allow the physical education teachers to have the appropriate amount of space to effectively deliver their curriculum for both of their individual classes. Why haven’t you been able to take care of capital projects in the year-to-year operating budget? Wisconsin school districts have been subject to State imposed revenue limits since 1993. Kewaskum, like most school districts in the State, works hard to balance the budget on an annual basis and keeps spending within these revenue controls. However, it is difficult to fund large scale capital projects, including renovations and additions to facilities, within the constraints of the normal operating budget. This creates the need for referendum approval by the taxpayers of a school district. The Board of Education did not believe stacking more debt on top of the existing elementary school debt was fiscally responsible. If the 2016 referendum is successful, the repayment of the new debt will begin after the 1999 elementary referendum debt is retired.

I G N I T I N G A PA S S I O N

FOR LEARNING

COMMUNITY SCHOOLS

N

Additionally, the Middle School currently uses a hallway as the cafeteria. The area is too small for the student population, requiring students to be served lunch over multiple periods. Re-purposing the current gym into a larger cafeteria area would allow for more efficient serving and increased seating, as well as allow for a needed large group instruction area for classroom activities and community use. With the middle school kitchen located next to the gym, the most cost-effective way to create needed cafeteria space is to re-purpose the current gym. What would be the expected start and finish date of the project? It would take approximately 8-9 months to design, engineer, and bid the project. We anticipate construction would start in the Summer of 2017 with a completion date in the Fall or Winter of 2018.

RENDU FE M

Classroom Renovations - Many classrooms have remained untouched for more than four decades. Due to their age, the classrooms have insufficient lighting, poor acoustics, inadequate ventilation and lack sufficient electrical capacity to support technology. In addition, they do not provide the flexibility needed for large group and small group collaboration.

RE

Science Labs - The school science facilities have not been updated since they were originally built. The labs are too small and many plumbing fixtures, gas jets, electrical infrastructure, and work stations are worn out and need to be replaced. The spaces were not designed to support the current science classes nor any new offerings.

O V. 8 T H

November 8, 2016 Referendum The Kewaskum School District believes the success of its schools is based on the support it receives from the hardworking and engaged community members, parents, students and staff. We work in harmony to build a brighter future for our children! To continue strengthening your schools, the School Board has actively involved the community over the past four years. During the past 14+ months, this included formation of a Long Range Planning Committee (LRPC) consisting of 50+ parents, staff and community members, which conducted a facilities-focused community survey. The LRPC spent eight months identifying needs and exploring solutions for the middle and high schools. They determined that both schools are no longer conducive to support today’s learning and teaching, have building systems beyond their useful life, and infrastructure that is in need of significant repair and/or replacement. The School Board, after carefully considering the work of the LRPC and the findings of the community survey, unanimously agreed to place a $28,420,000 referendum on the November 8, 2016 ballot. This question, if passed, will address the following needs: 1. 2. 3. 4.

Building systems – HVAC, plumbing, electrical, and lighting Infrastructure – technology wiring, roofs, flooring, and walls Learning spaces – upgrades needed to better support use of technology and flexible learning environment Safety and security – secure entrances, parent drop-off/pick-up, and fire life/safety enhancements

The Question | As It will Appear on the Ballot Shall the Kewaskum Area School District, Fond du Lac, Sheboygan and Washington Counties, Wisconsin, be authorized to issue, pursuant to Chapter 67 of the Wisconsin Statutes, general obligation bonds in an amount not to exceed $28,420,000 for the public purpose of paying for the cost of site improvements, new construction, renovation and modernization of Kewaskum Middle School and Kewaskum High School and acquiring furnishings, fixtures and equipment related to same?

The Need & Solution Although our schools have been well-maintained, many parts of the Middle School’s and High School’s infrastructure are over 50 years old and have reached the end of their useful life, resulting in inefficiencies and ongoing repairs. In addition, to continue to provide safe and secure school buildings that appropriately support the way today’s teachers teach and students learn, both schools need renovation to learning spaces and an addition to connect the two schools. If passed, this referendum will allow the District to address the areas depicted in the plans below and to the right.

CONCEPTUAL FLOOR PLAN COLOR KEY

Classrooms

8th Grade S.E. Off.

8th Grade Foreign Lang.

Comp. Class.

Foreign Lang. Speech Resource

OT / PT

Staff S.E. 7th Lounge Off. Grade Flex. Class.

6th Grade

SGI

Life Skills / Sp. Ed.

Collaboration

Girls' Locker Room

MS & HS Band

Chorus

SGI

Chemistry

Classrooms

Classroom

7th Grade 6th Grade 8th Grade Science Science Science Classroom Classroom Classroom

MS Choral

ESTIMATED TAX IMPACT ON PROPERTY WITH FAIR MARKET VALUE $0.19 MILL RATE INCREASE OVER 2016-17

$100,000 Home Value

Main Off. & Guidance

Stage

Cafeteria

Library

Auditorium

Kitchen

6th Grade

Art

Art

Print Shop

Conf.

Com. Lab

Tech. Office Off.

Main Off. & Guidance

STEM / Tech. Ed.

Estimated Annual Increase

$19.00

Estimated Annual Increase

$28.50

Estimated Monthly Increase

$1.58

Estimated Monthly Increase

$2.38

Graphic Arts

Staff

F.A.C.E.

Class

Conc.

$250,000 Home Value

Estimated Annual Increase

$38.00

Estimated Annual Increase

$47.50

Estimated Monthly Increase

$3.17

Estimated Monthly Increase

$3.96

Assumptions: 20-year borrowings (debt issued in two phases); average interest rate of 2.75% (phase 1, 2017) -3.25% (phase 2, 2018); 2016 equalized property valuation of $1,225,878,433; 1% annual property value growth; -11.57% tertiary aid. Tax estimates provided by PMA Securities, Inc.curities, Inc. Fitness Training

Why Now?

FACE

Art

$150,000 Home Value

$200,000 Home Value

Special Ed.

6th Grade

Library Books

PE Boys' Storage Locker Room Conc.

Toilets

6th 6th Grade Grade

8th Grade

Ag. Science

T.

8th Grade

Biology

Physics Business Ed.

1. The District received its 2016-17 State Aid which increased by 2.6%. This will allow the District to prepay a greater portion of the debt from the 1999 referendum resulting in paying off the 1999 debt one year earlier, all while maintaining a level tax levy.

Greenhouse

Biology

Classrooms

= INFRASTRUCTURE + BUILDING SYSTEMS UPGRADES

Gymnasium

The original tax impact of $0.36 was based on conservative assumptions. As the voting date nears, the School District is able to update the information to clarify the original assumptions.

With these revised assumptions, the projected tax impact is $0.19. If the referendum passes, this projected tax impact would be reflected on residents’ December 2017 tax bills.

T.

= RENOVATION

Classroom

CHANGES TO THE DEBT LEVY TAX RATE

2. Interest rates continue to hold at historical lows. The District, along with its Financial Advisor, is confident in adjusting the original interest rate assumption of 3.25% to 2.75%. This rate is still conservative based on recent Wisconsin school district bond sales.

= ADDITION

8th Grade

UPDATED TAX RATE

The Cost | Not to Exceed $28,420,000

Tech. Ed. Kewaskum Career Academy

Cafeteria & Large Group Instruction (LGI)

Lockers

Kitchen

Gymnasium

Men's Locker Room

Tech. Ed. Shop

Storage Storage

Women's Locker Room

• The District is taking proactive measures to pay off the debt from the 1999 referendum between now and 2019.

• We are in a historically low interest rate environment.

• Through strong financial management by both administration and the Board, the payments on existing debt are projected to drop significantly in 2018.

• It’s an investment in the children and the community.

N

Facilities Planning Timeline SEPT. 2013

Community committee focused on strategic planning.

Visionary committee created.

SPRING 2014

FIRST FLOOR PLAN - OVERALL

KEWASKUM COMMUNITY SCHOOLS

• The Long Range Planning Committee identified the need to provide our students with larger, flexible, technology rich spaces that will prepare them for success in an increasingly competitive global economy.

• This decrease in existing debt helps to minimize the impact of any potential new debt, creating an opportunity to wrap new referendum debt around the drop in existing debt.

N

OCT. 2012

• Construction costs continue to rise.

First community survey distributed.

JULY/ High School Kewaskum Middle 2015 Kewaskum, WI

AUG. 2014

APR. 2015

Preliminary facility study conducted.

Comprehensive facilities assessment completed.

MAY 2016

August 22, 2016 Long Range Survey distributed to © 2016 Bray Associates Architects, Inc. Planning Committee community members. (LRPC) created.

JULY 2016

AUG. 2016

LRPC made recommendation to the School Board.

Board of Education unanimously approved referendum vote.

IGNITING A PASSION FOR LEARNING

KSD_11 x 17 handout_updated tax (FINAL 101916).pdf

KSD_11 x 17 handout_updated tax (FINAL 101916).pdf. KSD_11 x 17 handout_updated tax (FINAL 101916).pdf. Open. Extract. Open with. Sign In. Main menu.

5MB Sizes 1 Downloads 92 Views

Recommend Documents

X Map Pointing - Book Setting Final (EM) - 2016-17.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. X Map Pointing ...

11 x 17 placard.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 11 x 17 placard.

x-69-17.pdf
(“MEG”)3. model; (2) an overlapping generations model (“OLG”);4. and (3) the Joint Committee. staff's dynamic stochastic general equilibrium model (“DSGE”).5.

FINAL POS 17-18.pptx-17.pdf
in both supporting your son or daughter's success and in helping you help. them reach it! Sincerely,. James A. Hand. Page 3 of 78. FINAL POS 17-18.pptx-17.pdf.

Final 16-17 Student Handbook.pdf
Page 3 of 85. 2016-2017. Millard North High School. 1010 South 144th Street. Omaha, Nebraska 68154. 402-715-1365. Fax: 402-715-1336. Homepage: ...

FINAL 17-18 Rates.pdf
Premiums High Deduction Plan ($2,000/$4,000) Monthly. Premiums. Employee Only $889 Employee Only $511. Employee ... Delta Dental (PT Employee will be pro-rated). Composite $108 100% District Paid. VSP-Vision (PT Employee ..... FINAL 17-18 Rates.pdf.

POS 17-18 FINAL - PDF.pdf
ii. Page 3 of 52. POS 17-18 FINAL - PDF.pdf. POS 17-18 FINAL - PDF.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying POS 17-18 FINAL - PDF.pdf.

Schedule 17-18-Final
Oct 2017. S. M. T. W. T. F. S. 1. 2. PT PT. 5. N. 7. 8. 9. 10. S. 12 13. 14. 15 16 17 18 19. SE. 21. 22 23 24. S. 26. 27. 28. 29 30 31. Nov 2017. S. M. T. W. T. F. S. 1. 2. 3. 4. 5. 6. 7. S. 9. 10. 11. 12 13 14 15 16 17 18. 19 20 21. N. N. N. 25. 26

Under 17 Boys - Final Results.pdf
8 Ben Hamilton 29 01:15:41 30 01:15:41. 14 Jordan Lewis 30 01:15:41 31 01:15:41. 6 Oscar Elworthy 31 01:15:41 32 01:15:41. 15 Burnie McGrath 32 01:15:41 ...

AR16-17-final version.pdf
Although PSOs are demonstrating a sustained increase in institutional and advocacy. capacity, they are challenged more than ever before to raise their level of organization,. coordination and responsiveness to match the pace of government in driving

final handbook 17-18.pdf
Title I. Secondary. Attendance. Student Conduct. Student Achievement. Graduation. Student Activities. Good Conduct Policy. District Calendar. Page 2 of 32 ...

17-18 Final 3.pdf
S M T W T F S. 0 1 2. 0 3 4 5 6 7 8 9. 0 10 11 12 13 14 15 16. 0 17 18 19 20 21 22 23. 0 24 25 26 27 28 29 30. LEGEND. Early Release PLC Day No Students 12 Month Holiday Teacher Work Day-No School. Half Student Day MLK Teacher Paid Day First/Last Day

2016-17 FINAL CALENDAR.pdf
APRIL 14 GOOD FRIDAY - NO SCHOOL. MAY 26 LAST DAY OF SCHOOL ... Page 1. Main menu. Displaying 2016-17 FINAL CALENDAR.pdf. Page 1 of 1.

Final Moot Problem - 17.pdf
those who had directly or indirectly been named in news article supported and signed. the notice. Hon'ble Speaker in exercise of his powers under the Rules of ...

final handbook 17-18.pdf
General Information. Registration and Fees. Student Expectations. Transportation. Elementary. Schedule. Attendance. Discipline. Classroom Rules. General Education Interventions. Title I. Secondary. Attendance. Student Conduct. Student Achievement. Gr

APPR-FInal 16-17.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. APPR-FInal ...

16-17 HS Final Guide.pdf
High School Selection Guide 2016-2017. 4220 80th Street NE. Marysville, WA 98270. 360.965.0000. www.msd25.org. Marysville Getchell Campus: Academy of ...

NSC Girls '17 Final Results.pdf
Page 1 of 7. #1 Women's 4 x 800m Relay (Junior Varsity). Pl Team Time Pts. 1 Lake Forest (A) 10:32.66 10. 2 Lincolnshire (Stevenson) (A) 10:38.18 8.

CA Final Indirect Tax Service Tax Hand Written Notes.pdf
CA Final Indirect Tax Service Tax Hand Written Notes.pdf. CA Final Indirect Tax Service Tax Hand Written Notes.pdf. Open. Extract. Open with. Sign In.

CA Final Question Paper November 2012_Indirect Tax Laws.pdf ...
Central Sales Tax Rate is 2%. Calculate the VAT liability for the month. ({,) MIs. Foreign Trade International Ltd. have imported one machine from 5. England. They have given the following particulars: Particulars. (i) F.O.B.valueof machine -. Amount