LUNENBURG MIDDLE HIGH SCHOOL BUILDING PROJECT

4/30/2016

Status Update - Contingency Scope Adds Relocation of One Existing Mural & Digital Mural Reproduction (RECORD): STATUS UPDATE: Lunenburg School Building Committee Voted to approve relocation of one existing mural and digital imaging of all other murals. Digital images will not be reproduced on wall covering. The School will propose alternate options to display the images in the future. Except one mural, all existing murals in the high school building which will be demolished, cannot be relocated. The murals have a historical and sentimental value to the alumni and community. This proposal is to digitally reproduce murals to a wallcovering for application in the new building. One mural is proposed to be relocated because it is safe to do so. The School Building Committee voted to approve relocation of one existing mural and creating a digital images of the others, but hold off on reproducing them to a wallcovering. The reproduction to a wallcovering will be reviewed at a later time. This may be an item done separately once funds are allocated or donated.

Touch Screen Monitor for Athletic Archives (RECORD): STATUS UPDATE: Lunenburg School Building Committee Voted to approve millwork and electrical scope for future ability to connect a display in the area. There has been an ongoing concern from alumni of the Lunenburg Public Schools about future location of trophies and awards that are displayed in the existing high school after the high school is demolished. Base contract for the new building allowed for some display, however it would not accommodate all the trophies and awards on hand. A digital display was suggested as an option to create a digital record of past winnings, trophies, articles and awards for Town Of Lunenburg’s Public School sport and other events. The digital monitor is proposed to be incorporated in the trophy display area. Some more recent or memorable trophies will still be placed in the display around the monitor. With help of a preloaded software, any one will have the ability to look up an event, game or person with related information. Such a display provide access to the high school’s history, highlight alumni contributions and server as bridge between current and past LHS students and town residents. During School Building Committee Meeting on 12.9.15, Construction Team had asked for Authorization to proceed on electrical and millwork work because it would be a more efficient way to complete this work had the work been approved. Approval to proceed was obtained from the Committee. However, a hold was placed on the software selection as it was a costly item which has a potential to be simpler and less expensive. The School will reach out to local communities and alumni for information on any potential options for a software and the programing options with goal to find a less costly option for the software. Also under consideration is fundraising for the monitor and software. This item will be further reviewed by the community and the LSB Committee. During School Building Committee Meeting on 2.10.16 the cost for electrical and millwork was approved for $5385. This item is closed. Software and Touch Screen will not be purchased at this time.

1|Page

LUNENBURG MIDDLE HIGH SCHOOL BUILDING PROJECT

4/30/2016

Provide Artificial Turf @ New Athletic Fields (RECORD) STATUS UPDATE: After careful review of all information provided, Lunenburg Public School recommended that the field be left as designed, sod field. A memo was issued and presented to the Lunenburg School Building Committee. LSBC voted to keep the new athletic fields as sod. At present the new athletic fields call for a sod field. A natural grass field requires yearly maintenance of the grass, soil etc. The grass field is prone to weather related damage such as flooding and frost freeze. This prevents games from taking place following extreme fall and winter conditions. The athletic director requested consideration to have one of the 3 new fields an artificial turf field as an option to better meet the demand for fields by the schools and community. A turf field requires replacement every 10-12 years depending on frequency of it use. During School Building Committee Meeting on 2.10.16, Landscape Architect presented facts about Turf and Sod field maintenance & long term wear. A number community & faculty members presented additional facts and opinions on the subject. Further review will take place at the subsequent School Building Committee meetings.

Reconfigure Parking Lot @ Passios (RECORD) STATUS UPDATE: After careful review of all information provided, Lunenburg Public School advised not to expend the parking lot at Passios as there is sufficient parking available on campus for day to day operations. Overflow parking logistics for major events will be studied in the future by the Town. Thomas C. Passion building and Brooks House will be turned over to the Town with the opening of the new school. The project’s site plan included parking associated with the Passios building. Although the number of parking spaces remaining on the school site meet MSBA requirements, the available parking will not meeting the School’s maximum capacity needs during high volume events and games. As a result, project’s design team issued a proposed reconfiguration plan that will provide the school with adequate parking when the Thomas C. Passios is released to the Town. At present the School and Design Team reviewed the scope of work, parking requirements as well as other less costly options to provide expansion parking opportunities for major events. Although no conversations took place at the 2.10.16 School Building Committee meeting regarding this subject, this item is likely to be removed from the list due to sufficient parking during standard events and day to day operations. Major event parking logistics will be further reviewed by the district.

2|Page

LUNENBURG MIDDLE HIGH SCHOOL BUILDING PROJECT

4/30/2016

Site Digital Sign (RECORD) STATUS UPDATE: Lunenburg School Building Committee voted to approve the monochrome digital sign. This scope will be added to the project. Base contract includes a granite sign with Lunenburg Middle/High School naming information and address. It came to the Team’s attention that there is no place to display information about current meetings and school events in the proximity of the school. There are currently two current signs, one of which will be removed as part of Phase 2 of construction the other will be turned over to the Town along with the Brooks House and TCP. The proposed digital sign would be located on school premises. The design will be incorporated with the new granite sign currently in base drawings. The overall design is simple with basic wireless capabilities for ease of posting information. The Design Team issued proposed design and sign manufacturer information for pricing. The Construction Team provided a price for installation and asked LSB Committee to vote on approval to proceed with electrical installation of the scope only. This work will be done underground which is cost efficient to do while site sub-contractor is still mobilized. In the event that the sign construction is not approved, the installation can be done at a later time when funds are available, however no excavation will be required as the underground electrical work will be complete. LSB Committee voted to approve electrical portion of this work.

Provide Air Conditioning to Classroom Wings (RECORD) STATUS UPDATE: Lunenburg School Building Committee voted to approve added cooling system for the classroom wings. This scope will be added to the project. The building infrastructure is designed to accept additional cooling capabilities for classrooms, however the actual cooling system for classrooms was value engineered during cost estimating phase of the project. It has been determined that in order to understand an additional cost for the added cooling system minimal design work is required by the architect on board. The architect provided an addition fee proposal range of $5,000 - $10,000 to issue this scope of work for pricing. LSB Committee voted to approve the design cost for this system in order to understand the actual added cost. Should this work not be approved a design will be available to proceed with in the future if funds are available. The extremely hot classrooms in school buildings without mechanical cooling capabilities are a concern of parents, faculty and the administration. Additionally, there are increasing numbers of students with health conditions requiring air conditioned. More students are also required to attend summer.

3|Page

LMHS _ Summary of Scope Adds to post on website _ status update.pdf

LMHS _ Summary of Scope Adds to post on website _ status update.pdf. LMHS _ Summary of Scope Adds to post on website _ status update.pdf. Open. Extract.

55KB Sizes 3 Downloads 175 Views

Recommend Documents

2015.02.12 LMHS Contingency Scope Add List.pdf
software. This item will be further reviewed by the community and the LSB Committee. During School Building Committee Meeting on 2.10.16 the cost for ...

Website Adds from May 31, 2017.pdf
Website Adds from May 31, 2017.pdf. Website Adds from May 31, 2017.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Website Adds from May 31 ...

Website Adds from June 30, 2017.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Website Adds ...

Website Adds from November 29, 2017.pdf
4 GUZMAN, ROSANNE J. 5 SAYAMA, ETHAN ... 18 TEDTAOTAO, VANDERICK F. TAMUNING 17 ... Website Adds from November 29, 2017.pdf. Website Adds ...

Website Adds from April 30, 2017.pdf
Website Adds from April 30, 2017.pdf. Website Adds from April 30, 2017.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Website Adds from April ...

The Status of Climate Finance Post-Copenhagen
However, it was neither endorsed nor voted on by the full Conference of Parties (COP) of the UNFCCC in ..... URL: http://www.un.org/apps/news/story.asp?

Current Status of Post-graduate Physical Therapy ...
in India, the Graduate level entry in to Physical therapy education programs with broadened areas of clinical specialties provides scope for widening the horizon ...

Current Status of Post-graduate Physical Therapy ... - Semantic Scholar
science and technology has ... Institute of Medical Sciences, 5th Mile, Tadong, Gangtok, East Sikkim –. 737102. ..... bachelor degree is desirable. The.

Website Adds from September 29, 2017.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Website Adds ...

The Status of Climate Finance Post-Copenhagen
Scaling Up Renewable Energy Program in low-income countries (SREP). ... (AF) which recently started its operations, has a designated funding source (a 2.

Current Status of Post-graduate Physical Therapy ... - Semantic Scholar
to a transitional degree for higher studies. Issues: The duration of the post .... social and human values and .... bachelor's and master's degree students in.

Website Adds from July 31, 2017.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Website Adds ...

Summary of changes to the 'External guidance on the implementation ...
Apr 12, 2017 - indication application submitted in the context of regulatory procedures not ... are able to identify validation non-compliance at an early stage. 2.

Competitive Matrix Names Status Features Cost Website or Link Clad ...
Names. Status. Features. Cost Website or Link. Clad Equipment. Pre-Beta PM2.5, ... Available Mobile App, AQI. $0 http://www.breezometer.com/. T=Temperature.

Competitive Matrix Names Status Features Cost Website or Link Clad ...
Names. Status. Features. Cost Website or Link. Clad Equipment. Pre-Beta PM2.5, ... Available Mobile App, AQI. $0 http://www.breezometer.com/. T=Temperature.

Required Employee Training Status Report Summary -
V.P. - Facilities (AD). 3. 3. 0.31. Graduate Assistant. 21. 80. 8.38. V.P. & CFO - Finance (FN). 1. 1. 0.10. Student Worker. 34. 122. 12.77. V.P. - Global Initiatives (GI) ... 800. 1,000. Number of Employees Past Due by Executive. Level. 97.1%. 97.0%

Maximizing Website Return on Investment:
helping site visitors to understand the company's products, services, or solutions, ... software can be worth thousands of dollars, it is essential that a website works .... 2 .5M/mo. 100K/mo. 5,000/mo. % web lead conversions to sales. 20%. 10%.

Scope : On the Side Channel Vulnerability of ... -
Department of Computer Science and Engineering, IIT Kharagpur, India ..... block while A[·] and M[·] denote blocks of associated data and message respec-.

On the Nature and Scope of Featural ... - Semantic Scholar
the nature of featural representations, focusing on the way in. Ken McRae, Department of Psychology, University of Western. Ontario, London, Ontario, Canada; Virginia R. de Sa, Department of Computer Science, University of Rochester; Mark S. Seiden-

On The Interpretation of Wide-scope Indefinites
choice function analysis is unable to account for the St'át'imcets data, ...... apple. If a distributive reading were available, then (i) should be perfect, regardless of ...

On the Nature and Scope of Featural ... - Semantic Scholar
Behavioral experiments and a connectionist model were used to explore the use of featural representations in the computation of word meaning. The research focused on the role of correlations among features, and differences between speeded and untimed

Policy on scope and Formation.PDF
... database e-commerce juga. berkembang terus. Jadi, kita sekarang. kembangkan database-nya, baik untuk. pemain dalam negeri ataupun yang. OTT,” kata Yon. z dit. Akhir September, Skema Pajak Toko Online Selesai. Page 2 of 4. Page 3 of 4. Policy on

On the strength and scope of DLS
where each Ai(P) (respectively, Bi(P)) is positive (respectively, negative) in P. If ... Phase 2 then proceed separately on each main disjunct ∃P(Ai(P) ∧ Bi(P)).

Budget Summary for Website 2017.pdf
Budget Summary for Website 2017.pdf. Budget Summary for Website 2017.pdf. Open. Extract. Open with. Sign In. Details. Comments. General Info. Type.