SCHEDULE "4"

LOWNDES COUNTY BOARD OF EDUCATION SCHEDULE OF APPROVED LOCAL OPTION SALES TAX PROJECTS YEAR ENDED JUNE 30, 2015 (UNAUDITED) ORIGINAL ESTIMATED COST (1)

CURRENT ESTIMATED COSTS (2)

AMOUNT EXPENDED IN CURRENT YEAR (3) (4)

AMOUNT EXPENDED IN PRIOR YEARS (3) (4)

39,200,000.00 $

39,200,000.00 $

6,660,000.00 $

39,942,150.00

11,386,586.00

1,204,680.84

780,000.00

780,000.00

(d) the acquisition of technology equipment, security and safety equipment, textbooks, band and other musical instruments, vocational equipment and physical education and athletic equipment

9,552,850.00

9,552,850.00

1,837,077.65

2,076,367.72

June 2018

(e) the acquisition of school vehicles, including, but not limited to, school buses and maintenance vehicles and equipment

5,400,000.00

5,200,000.00

182,068.39

166,310.72

June 2018

200,000.00

44,405.00

66,319,436.00 $

9,928,231.88 $

TOTAL COMPLETION COST

EXCESS PROCEEDS NOT EXPENDED

ESTIMATED COMPLETION DATE

SPLOST IV PROJECTS (a) Retiring previously incurred general obligation debt of the School District

$

(b) the addition, renovation, repair and improvement to existing school buildings and facilities, including, but not limited to, all existing elementary and middle schools and Lowndes High School (c) planning and design of new school buildings and facilities, including, but not limited to, a new high school and a new auditorium/performing arts facility

(f) the acquisition of any property necessary and desirable therefore, both real and personal

16,475,000.00

June 2018

1,268,306.82

June 2018

June 2018

June 2018

(g) the repayment of general obligation debt incurred through temporary loans for capital outlay project expenses Total SPLOST IV Projects

$

94,875,000.00 $

19,985,985.26

(1) The School District's original cost estimate as specified in the resolution calling for the imposition of the Local Option Sales Tax. (2) The School District's current estimate of total cost for the projects. Includes all cost from project inception to completion. (3) The voters of Lowndes County approved the imposition of a 1% sales tax to fund the above projects and retire associated debt. Amounts expended for these projects may include sales tax proceeds, state, local property taxes and/or other funds over the life of the projects. (4) To provide advance funding for projects, totaling $82,141,832.41, the School District has incurred interest in addition to the expenditures shown above as follows: Prior Years

$

15,821,139.92

$

17,030,819.92

Current Year Total

1,209,680.00

Lowndes Co BOE SPLOST Sch 4 FY 2015.pdf

through temporary loans for capital outlay project. expenses. Page 1 of 1. Lowndes Co BOE SPLOST Sch 4 FY 2015.pdf. Lowndes Co BOE SPLOST Sch 4 FY ...

35KB Sizes 0 Downloads 140 Views

Recommend Documents

Lowndes Co BOE SPLOST Sch 7 FY 2016 for Newspaper.pdf ...
Lowndes Co BOE SPLOST Sch 7 FY 2016 for Newspaper.pdf. Lowndes Co BOE SPLOST Sch 7 FY 2016 for Newspaper.pdf. Open. Extract. Open with. Sign In.

FY 18 LOWNDES District Improvement Plan - DRAFT Copy.pdf ...
Page 2 of 51. 205 JesseHillJr.Drive SE. Atlanta, GA 30334. (404) 657-4209. www.gadoe.org. [email protected]. Richard Woods, State School Superintendent. “Educating Georgia's Future.” This report template was designed by the Georgia Department of E

FY 18 LOWNDES CNA - DRAFT Copy.pdf
Page 2 of 86. 205 JesseHillJr.Drive SE. Atlanta, GA 30334. (404) 657-4209. www.gadoe.org. [email protected]. Richard Woods, State School Superintendent. “Educating Georgia's Future.” This report template was designed by the Georgia Department of E

SPLOST Sched_Candler_2017.pdf
CANDLER COUNTY BOARD OF EDUCATION. SCHEDULE ... improvements, and any other building and facilities useful ... SPLOST Sched_Candler_2017.pdf.

SFPS 2016-2017 Regular BOE Meeting Schedule (4).pdf ...
Please note: Unless indicated otherwise, all meetings will take place the 1st and 3rd Tuesday of the month at the ESC Building, 610 Alta Vista Street, Santa Fe, ...

BOE Minutes - October 4, 2016.pdf
Coaches: John Karbowski-Boys Varsity Basketball; Dave Bush-Girls Varsity Basketball; Bill. VanNostrand-Boys Volunteer Asst. Basketball. Removal of Mindy ...

3ºL-CO-4.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 3ºL-CO-4.pdf.

A20-OLINUXINO-MICRO_4GB_Rev_E2.sch
ETXD2/SPS CSOVRAS. ETXD1SPIS_CLK RAB. ETX DOIS PS MCSVR47. EROICKIS PS MSCYRUS. ERXERRAS PIS CS1 RA9. EROX DWYLIA RT1_TXIRA 10 .... LC DO DYLVDs0 VP1/PD2. HPEND. LCDO GALVCS0 VN1/PCG. LC DO D4LVDs0 VP2/PD4. LCDO_CSALVDSO_VN2/PCS. LCDO_DELVDs0_VPCIPLE

BOE Approved Operating Budget FY 2018-19 2/26/18.pdf
Everything Else $145,780. Total FY 2018-19 Budget Increase $3,921,640. Page 3 of 49. BOE Approved Operating Budget FY 2018-19 2/26/18.pdf. BOE Approved Operating Budget FY 2018-19 2/26/18.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying

SPLOST Fire Projects Presentation-Brookhaven.pdf
Hazardous Materials. • Rescue. • Aircraft Rescue and Fire Firefighting. • Dive Rescue Team. • Forestry Fire Response. • Provide Public Education, Life Safety Inspections, Fire Investigations. • Responded to 98,000 incidents and over 100,0

5ºL-CO-4.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 5ºL-CO-4.pdf.

CLK-SCH-07 - GitHub
74AHC1G04DCK. 74AHC1G04DCK. 74AHC1G04DCK. 3.3V. 3.3V. 3.3V. 3.3V. 3.3V. 3.3V. 1 u. F. 1 u. F. 1 u. F. 1uF. 1uF. 1uF. D6. D7. D8. VIN. 6. SW. 1. OVP. 5.

Base Shield v2.sch - GitHub
Page 1. 2015/3/23 11:34:14 E:\Eagles\Base Shield v2\Base Shield v2.sch (Sheet: 1/1)

Grove - Speaker v1.0.sch - GitHub
Page 1. SeeedStuclio. TITLE: Grove — Speaker v1.0. Design: Check: Date: Uision: Sheet: 1/1.

Shield Bot v1.2.sch - GitHub
Mar 3, 2015 - EN. 3. GND. 4. LX 5. VDD 6. FSEL 7. SS 8. COM1. COM2. CH1A ... GND. 4. FB 5. NC 6. EN. 7. NC 8. 1. 2. 3. A. B. C. D. 1. 2. 3. 4. 5. 6. A. B. C. D.

Grove-Gas Sensor v1.4.sch
TITLE. Grove—Gas Sensor v1.4. 1. /. 1. -"I" e e h. S t r e 3 m 1. H v. II m d 0 ll. e s h -1. C U. M p. d m g 5 m M u a. II 0 n 8 m I. S w. e a. D D.

Grove-Gas Sensor v1.4.sch
TITLE. Grove—Gas Sensor v1.4. 1. /. 1. -"I" e e h. S t r e 3 m 1. H v. II m d 0 ll. e s h -1. C U. M p. d m g 5 m M u a. II 0 n 8 m I. S w. e a. D D.

Music Shield v2.2.sch - GitHub
2014/12/2 11:45:00 C:\Users\seeed\Desktop\Music Shield v2.2_20141128\Music Shield v2.2_20141128\Music Shield v2.2\Music Shield v2.

Lowndes County Schools Volunteer Procedures
Jul 29, 2015 - I hereby authorize the Lowndes County Board of Education to receive any Georgia criminal history record information pertaining to me, which may be in the files of any state or local. Criminal Justice Agency in Georgia. Results may be r

Arch GPRS v2.0.sch - GitHub
Page 1. Page 2. Page 3. Page 4.

RS232 Shield v1.sch - GitHub
R. IN. 2. 8. R. O. U. T. 2. 9. D. IN. 2. 1. 0. D. IN. 1. 11. R. O. U. T. 1. 1. 2. R. IN. 1. 1. 3. D. O. U. T. 1. 1. 4. G. N. D. 1. 5. V. C. C. 1. 6. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.

APP FY 2016 1 OF 4 (4 files merged).pdf
Page 1 of 4. Page 1 of 4. Page 2 of 4. Page 2 of 4. Page 3 of 4. Page 3 of 4. Page 4 of 4. Page 4 of 4. APP FY 2016 1 OF 4 (4 files merged).pdf. APP FY 2016 1 ...