th

One Blue Hill Plaza, 16 Floor, PO Box 1546 Pearl River, NY 10965 1-800-PC-AMERICA, 1-800-722-6374 (Voice) 845-920-0800 (Fax) 845-920-0880

Mettler Toledo JL602 Installation Guide

This document contains instructions for setting up the Mettler Toledo JL602 to work with CRE.

1|P a g e

Mettler Toledo JL602 - Hardware Configuration To set up the Mettler Toledo JL602 for operation, follow these steps.

1. Plug the appropriate ends of the power supply cable into the power port of the scale and the other end into a power outlet. 2. Plug the appropriate ends of the RS-232 cable into the serial port of the scale and the other end into a computer’s serial port. 

The computer should be powered off.

2|P age

Mettler Toledo JL602 Configuration Prior to using the scale with CRE/RPE some configuration is required. After making any of the following changes to the scale you will need to contact Weights and Measures to make sure the scale are certified and weighing items properly.

1. Select the ->O/T<- to power the device on.

2. Press and Hold the Menu button (pictured left), release when you see MENU on the screen of the scale. When letting go of the MENU button, RESET should then be displayed on the screen of the scale. If the Menu button is held too long the Menu will exit the configuration mode. And you will have to repeat step 2.

3. Select Menu to go to the next option. 4. Press the F button (pictured left) until F none is displayed on the screen of the scale. 5. Select Menu to go to the next option.

6. Press the F button (pictured left) until Std is displayed on the screen of the scale. 7. Select Menu to go to the next option.

8. Press the F button (pictured left) until Unit 1 g is displayed on the screen of the scale. 9. Select Menu to go to the next option.

10. Press the F button (pictured left) until Unit 2 g is displayed on the screen of the scale. 11. Select Menu to go to the next option.

3|P age

12. Press the F button (pictured left) until A.off 10' is displayed on the screen of the scale. 13. Select Menu to go to the next option.

14. Press the F button (pictured left) until Printer is displayed on the screen of the scale. 15. Select Menu to go to the next option.

16. Press the F button (pictured left) until bd 9600 is displayed on the screen of the scale. 17. Select Menu to go to the next option.

18. Press the F button (pictured left) until 7b-E is displayed on the screen of the scale. 19. Select Menu to go to the next option.

20. Press the F button (pictured left) until hs off, is displayed on the screen of the scale. 21. Select Menu to go to the next option.

22. After changing the last setting press and hold the Menu button until stored is displayed on the screen of the scale.

4|P age

CRE Configuration with JL602 Once the Mettler Toledo JL602 is setup, connected to the computer, and powered on, you can set up CRE to use it as a weight scale. To do so; power on your computer, start CRE, select Manager, provide the requested credentials, and follow these steps.

1. Select Setup and then Setup Screen.

2. Select the Hardware tab. 3. Select the COM port that the scale is connected to. Many systems have labels on the ports that contain this information. If yours does not, select COM 1. You may need to select other COM ports later if CRE does not find the scale. 4. Select Mettler Toledo JL602 under “Primary Scale Type”.

5|P age

5. Select Page 2. 6. Select the radio button next to 610x.01 g under “Scale Weight Formatting”. 7. Select Scale at the bottom of the setup screen.

8. Activate the scale feature and select Done.

9. Select Update.

You should now be able to weigh items into CRE.

6|P age

Mettler Toledo JL602 Installation Guide

One Blue Hill Plaza, 16th Floor, PO Box 1546. Pearl River ... Press and Hold the Menu button (pictured left), release when you see MENU on the screen of the ...

579KB Sizes 1 Downloads 157 Views

Recommend Documents

man-99\mettler-toledo-t50-user-manual.pdf
man-99\mettler-toledo-t50-user-manual.pdf. man-99\mettler-toledo-t50-user-manual.pdf. Open. Extract. Open with. Sign In. Main menu.

Installation Guide - GitHub
Create the database tables. 3.2.5. (Optional) ... hedgehog Data Manager This is the user that will own the database created by. Hedgehog .... link on Homepage.

US Platform - Installation Guide - MarkMail
Mar 3, 2010 - Java version – jdk 1.6. Microsoft Visual C++ 2005 Service Pack 1 Redistributable Package ATL Security Update. R10 TAFC. R10 Model Bank ...

siteminder installation guide pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect ...

innowatch hardware rds installation guide
Class. Specifications. Resolution. 1920ⅹ1080. 1600ⅹ1200. 1280ⅹ1024. 1024ⅹ768. Interface. - Input: DVI 1port. - Output: DVI 1port. - Network: RJ45 1port.

security camera installation guide pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying.

Greenplum Chorus 2.0 Installation Guide - GitHub
Dec 10, 2012 - Use, copying, and distribution of any EMC software described in this publication requires an applicable software .... management systems, database administration, and structured query language (SQL). ... questions about your account. .

Geoportal Server 1.2.4 Installation Guide - GitHub
Jul 1, 2013 - With simple authentication, there is only one user in the geoportal – the administrator. This ... Highlight the service representing your Directory Server. ... On the Network Parameter screen, enter the following parameters: ..... Gla

guide-installation-site-autonome-ERM.pdf
ERM Energies, une marque d'ERM Automatismes. 561 rue ... http://www.erm-energies.com. 28/09/2015 ..... Displaying guide-installation-site-autonome-ERM.pdf.

Eulalia Toledo Hernández.pdf
Whoops! There was a problem loading more pages. Retrying... Eulalia Toledo Hernández.pdf. Eulalia Toledo Hernández.pdf. Open. Extract. Open with. Sign In.

PLANO_ACAO_CEEBJA TOLEDO 2015 2 semestre.pdf
Page 1 of 2. AÇÕES CRONO-. (O QUE FAZER) GRAMA. (QUANDO FAZER). Semana pedagógica. como momento de. reflexão sobre os. desafios da escola.

Repertory Dance Theatre Elects Snell & Wilmer Partner Amber Mettler ...
Aug 18, 2016 - Founded in 1938, Snell & Wilmer is a full-service business law firm with more than 400 attorneys practicing in nine locations throughout the ...

Full Book PDF Electrical Installation Design Guide ...
Unlimited eBooks and Audiobooks - By The Institute of ... for Electricians and Designers (Electrician s Guide) The Institute of Engineering read online, Electrical ...

manual-cat-electrical-electronic-application-installation-guide-c10-c12 ...
Whoops! There was a problem loading more pages. Retrying... manual-cat-electrical-electronic-application-installation-guide-c10-c12-c15-c16-truck.pdf.