Question Paper Code: 11199 B.E.,ts.Tech. DEGREE EXAMINATION, NO\,EMBER,DECEMBER 2012,

Seventh Semester

Civil Engineerilg CE 24O1ICE 71ICE 1351

-

DES]GN OF REINFORCED CONCRETE AND BRICK MASONRY STRUCTURES

.

(Regulation 2008)

Time : Three hours

Maximum : 1o0 marks

IS 456 and SP 16 design charis and tables are permitted.

Answer

AII

questions.

PARTA-(10x2=20marks)

L

Wlat

2.

What are the stability requLemerts for retaining wall?

3.

What theory is used to design

(a) (b)

is

favity

retaining wall?

the members under alirect tension

the members under benali4g tension.

4.

Name the trues of movement joints-

5.

List the classification ofstaircases.

6.

What do you mean by the column stdp and middle strip in flat slab?

7.

Draw any two yield line patterns for a rectangular slab.

8.

Define:

(a) (b)

Isotropicallyreinforcedslabs. Orthotropicallyreiaforcedslabs.

9.

What is meant by slenderness ratio ofa masonry wall?

10.

Name the various tlryes of masonry waUs used in buildine construction.

PARTB-(5 x 16 = 80 marks)

11.

(a)

Design the ve ical stem of a reinforced concrete T-shaped retaining wall to retain 4.5 m high earth with hodzontal surface at the top. The unit weight of soil is 16.5 kN/m3 and angle of repose of 30o. The safe beadng capacity of the soil is 160 kN/mr. The coeffrcient of friction between the base and the soil is 0.55. Use M20 concrete and Fe415 steel(16)

Or

(b)

A counterfort retaining wall is to retain the earth 6.0 m high above the ground level. The unit weight of the retained ea h is 18 kN/m3 and angle of repose of 30'. The horizontal surfaee of backfrll is subjected to a live load surcharge of 20 kN/mr. The safe bearing capacity of soil is 200 kN/m'. The coefficient of friction between the base slab and soil is 0.53M20 concrete and Fe415 IfYSD bars are used. CaIIv out the stabilitv analysis and design the shear key ifnecessary. (16)

12. (a)

Design a cylindtical water tank ofcapacity 500 mB (500,000litres) resting on the ground and having a flexible base. The overall height of the tank is restrircted to 5 m with a free board of 300 mm. The bearing capacitv of the soil at site is 150 kN/m, (16)

Or

(b)

The roof of a 100 kilo litre capaciiy overhead circular water tank consists of a sphedcal dome of 8.0 m base diameter with rise of 1.25 m. The superimposed load may be taken equivalent to vertical load of 1.0 kN/m2 of the dome surface. Design the top dome and its top ring beam. Show reinforcement details by neat sketches. Use M20 concrete and Fe415 IfYSD bars. (16)

13. (a)

Design a straight stair for a residential building consisting of individual steps projecting 950 mm from the face of the wall. The rise and tread of the stairs are 180 mm and 260 mm respectively- The live load mav be tal
Or

(b)

A flat slab floor systen consisting of six panels in each directio supports dead and live loads of 7.5 kN/m, and 6.25 kN/m, respectively. The supporting columns are of 550 mm diameter with storey height of 3.0 rn, Design an interior panel of size 5.7 x 6.5 m using IS 456 for the direct design method, when no column head or drop is provided. Use M25 concrete and Fe415 IrySD hrrs (16) 11199

1a. (a) An isotropically

reinforced equilateral triangular slab is subjected to uniformly distdbuted load Wm (or) WJarea. Any restraining moment is equal to positive moment- Calculate ultimate load when the slab is (i) simply suppoded on all the three Jdges (ii) completely fixed on all (16) edges (iii) simply suppo ed on two edges and free on the third. Or

(b)

Design a simply supported reinforced concrete c cular roof slab for an assembly hall of 11.00 m inside iliameter. The slab is supported on a 600 mm diameter column at its centre. The slab carries a total uniformly distributed load of 4.0 kN/m'z inclusive of self weight at service conalitions. Design the slab using yield Line analysis. Use M20 concrete (16) and Fe415 IfYSD bars.

15. (a) A masonry wall is subjected to an axial load of 150 kN and bending moment of30 kNm. The height ofthe wall is 4 m. Design the wall. (16) Or

(b)

Design a solid square masonry column of height 2000 mm to carly an axial load of 150 kN. The column is tied at top and bottortr- Include the (16) self weight of the column for the design.

11199

Nov Dec 2012 DRCB_NoRestriction_NoRestriction.pdf

... loads of 7.5 kN/m, and 6.25 kN/m, respectively. The. supporting columns are of 550 mm diameter with storey height of 3.0 rn,. Design an interior panel of size 5.7 x 6.5 m using IS 456 for the direct. design method, when no column head or drop is provided. Use M25. (16). 11199. concrete and Fe415 IrySD hrrs. Page 2 of 3 ...

703KB Sizes 0 Downloads 183 Views

Recommend Documents

Nov Dec 2012 TPDE_NoRestriction_NoRestriction.pdf
9. Find the Z-transform of a". 10. Solve ya-2y,=0, given that J(0)=2. PARTB_(5x 16=80marks) 11. (a) (i) Find the Fourier series expansion of l(.tj =r+r2 h(_r,z). (8).

Nov-Dec 2012.pdf
Firs t report of Jungle or Grey Nightjar (Caprim ulgus. indicus) in Khadir Island, Rapar (Kachchh), Gujarat,. by Hiren Soni and Justus Joshua. Correspondence.

TAB Seatpost 2012-6 Nov-Dec
Island Lake MTB ride, caravan leaving from St. .... major disappointment is that I was not able to fulfill my campaign promise of introducing handle grip streamers ...

Nov Dec 2010_NoRestriction_NoRestriction.pdf
6. How wilt ,ou telt the mrly laid sws lines? ?. Dlaw tho .Lekh of{ di4Esion tEn L. 8. Stste the Dethods t y which 6ludeE i. dispced o[. 9. What i. sD 6yga .ag .1lrc?

Nov Dec 2011HE_NoRestriction_NoRestriction.pdf
What are BOT proj€cts? Defi ne limiling gradient. What is extra widenirg? /4. Define optimum moisture content. Wlat are dowel bars? Differ€ntiate between Tar ...

Nov-Dec 2013
Question Paper Code: 31300. B.E./B.Tech. DEGREE EXAMINATION, NOVEMBER/DECEMBER 2013. Third Semester. Computer Science and Engineering.

Nov Dec 2011SM_NoRestriction_NoRestriction.pdf
Page 3 of 3. Nov Dec 2011SM_NoRestriction_NoRestriction.pdf. Nov Dec 2011SM_NoRestriction_NoRestriction.pdf. Open. Extract. Open with. Sign In.

Nov Dec 2011SUR 1_NoRestriction_NoRestriction.pdf
Nov Dec 2011SUR 1_NoRestriction_NoRestriction.pdf. Nov Dec 2011SUR 1_NoRestriction_NoRestriction.pdf. Open. Extract. Open with. Sign In. Main menu.

Nov-Dec 2017.pdf
be receiving a free RCHS basketball game ticket! ... 2: Fat Boy's Oliver Night ... 7: Fat Boy's Oliver Night ... Children & Family Connection. of ... hours in advance from the principal and principal must coordi- nate bus passes ... Nov-Dec 2017.pdf.

Nov Dec 2011 SA2_NoRestriction.pdf
Page 1 of 4. Reg. No. B.E./B.Tech. DEGREE EXAMTNATTON, NOVEMBER/D. Time : Three hours. Give the mathematical expressi. rigid jointed plane frames.

Nov Dec 2011 CPS_NoRestriction.pdf
Page 1 of 2. Reg. ![o. : Question Paper Code z 66L46. B.E. /B.Tech. DEGREE EXAMINATION'. Sixth Semester. Civil Engineering. CE 2353 _ CONSTRUCTION PI.ANNING. Time : Three hours. Or. exptain the methods of estimation. PARTA- (1olE:2 = 2bqarks). 1. Def

Nov Dec 2011 DRCB_NoRestriction_NoRestriction.pdf
l - Wlat are the BDes of retaining walls? 2. What are the stability checks in dase o*ehjning waJJ? 3. How will you classi[, the water hnks? 4. List the conditions to be cllrsidered while designing a undergrcund tank. 5. What are the different tj.pes

2017 Nov Dec Post Newsletter.pdf
Page 1 of 4. AMERICAN LEGION. COLONEL CRAWFORD POST 181. NOVEMBER – DECEMBER 2017 NEWSLETTER. POST 181 OFFICERS: Commander: Bill Cummings. 1st Vice: Tony Michalek. 2nd Vice: John Neubacher. Adjutant: David Robertson. Finance Officer: Kevin Weinandy

Nov-Dec 2010.pdf
extinct in Malaysia, Phi l ippines and Thai land and is. classified as Vulnerable on the IUCN Red List. The. Philippine population of Sarus Crane was wiped out ...

nov-dec 16.pdf
Conference on Image Processing, 2013. Tsumoto, S.; Hirano, S.; Iwata, H., Granularity-based Temporal Data Mining in Hospital. Information System Big Data, ...

cs nov 2012 qp.pdf
c) Conditionally Stable system d) Marginally Stable system. 3. Addition of compensating networks are done when the designer [ ]. a) Is not able to alter the ...

SAOB-Jul-Dec-2012.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

Ford Bylaws - Dec 2012.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Ford Bylaws ...

UU NEWSLETTER -- DEC 2012.pdf
please contact Jayne Djubek (419-626-6234 or ... Fellowship of Erie County. Designate on the. memo line ... Page 1 of 1. UU NEWSLETTER -- DEC 2012.pdf.

CR-YEMEN NOV 2012.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. CR-YEMEN NOV 2012.pdf. CR-YEMEN NOV 2012.pdf. Open. Extract. Open with. Sign In. Main menu. Whoops! There wa

Nov. 29-Dec.3, 2010 30 1 2 3
Students to develop at their own pace. Short day. Visitors. ... treaty/Web work on long term impacts(chap14) ..... Quick Lab pg.196. Teacher Demo. Mole Box.

Built Environment aanwinsten nov.-dec. 2015.pdf
Page 1 of 2. Aanwinsten Studiecentrum November-December 2015. Verbeelding Bouwbesluit Brandveiligheid, editie 2015. ISBN 9789462451711. Fassaden ...

Scheduled Power Interruption: Nov. 27-Dec. 1.pdf
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC