Mount Abraham Union Middle/High School Renovation

Topics for Tonight ● ● ● ●

The Building Today The Opportunity The Cost Question & Answer

The Building Today ● Doors opened fall 1968 ● Construction completed fall 1969 ● Notable renovations: ○ South end addition 2005 ○ Wood chip boiler 2007 ○ Gym floor 2016 ● Currently no debt

The Building Today ● ● ● ● ● ●

Accessibility challenges Little daylight due to lack of windows Poor air circulation Pass-through classrooms Plumbing concerns Security concerns

The Building Today ● ● ● ● ● ●

Restrooms/locker rooms in poor condition Gym scheduling challenges Traffic flow concerns No sprinkler system Auditorium at end of useful life Outdated science labs

The Building Today How do students and staff feel about the building?

The Opportunity ● A facility that reflects the pride our community has in its students ● A facility that reflects the great work happening at Mt. Abe ● Improved outcomes for students ● A safe, functional building for decades to come ●

The Opportunity ● Improved environmental health and security ● Improved energy efficiency ● Improved community access ● A second gym ● Improved perceptions of our community

The Opportunity When Schools Have a Good Reputation: ● Families want to move to the area ● Property values increase ● Houses are built and/or sell faster and at higher prices ● A larger grand list drives down taxes for everyone

The Cost Renovating Mt. Abe will never be more affordable than it is right now.

The Cost ● Total project cost is $36,664,000 ● Total bond needed $35,000,000 ● The projected tax impact is $87.60 per $100,000 of assessed property value ● This is a 43% reduction from the 2014 bond, which was $153.39 per $100,000

The Cost ● 45% of the projected bond payment is already in the school budget ● Renovating now will reduce emergency repair costs, such as last year’s gym floor

The Cost ● In today’s dollars the 2014 bond would be nearly $38,000,000 ● If we wait, construction costs will increase 4-5% each year and interest rates will likely rise ● Each month that passes the cost increases more than $140,000

The Cost ● 11 month design phase ● Construction would start summer 2019 ● After January construction pushed back to summer 2020 ● Project cost could increase $1,800,000 total interest paid could increase $2,750,000

Question & Answer

For More Information & Upcoming Events

ANESU.org

Vote November 2! Your vote is your voice!

Renovation Presentation October 2017.pdf

Page 1 of 13. Mount Abraham Union. Middle/High School Renovation. Topics for Tonight. ○ The Building Today. ○ The Opportunity. ○ The Cost. ○ Question & Answer. Page 1 of 13. Page 2 of 13. The Building Today. ○ Doors opened fall 1968. ○ Construction completed fall 1969. ○ Notable renovations: ○ South end ...

4MB Sizes 2 Downloads 159 Views

Recommend Documents

LMFA IR Presentation October 10-19-16.pdf
... the Securities and Exchange Commission, available on the Investors section of our website at. www.lmfunding.com and on the SEC's website at www.sec.gov.

PSC Investor Presentation Materials October 2014.pdf
Page 2 of 18. Who We Are. MISSION: To make daily life easier by providing. modern convenience. VISION: To be the best retailer of convenience. for emerging ...

LMFA IR Presentation October 10-19-16.pdf
2008 – Founded LM Funding. Page 3 of 34. LMFA IR Presentation October 10-19-16.pdf. LMFA IR Presentation October 10-19-16.pdf. Open. Extract. Open with.

Waterhouse Renovation Ppoint_Sm.pdf
Page 2 of 29. History of the Field. • The Waterhouse Commission (previously known as Biddeford. High School Alumni Field Association) was deeded the ...

Presentation
A fast, cheap and simple analytical method. .... limited data from Jordan ... data. • Some of those: Mishor Yamin,. Revivim – Mashabim, Sde-. Boker, Shivta ...

Renovation application form.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Renovation ...

Presentation Title Presentation Sub-Title
April 2010, Prahran, Melbourne. • Direct impacts ... Victoria. Currently infrastructure and facilities are designed based on past climate, not future climate. ... Sensitivity of Materials to Climate Change Impacts. Material. CO. 2. Cyclones. & Stor

Presentation Title Presentation Sub-Title
Climate change impacts – impact upon cycling conditions and infrastructure. Infrastructure and climate change risks for Vic. Primary impacts – impact upon ...

CTE-PROPOSED-RENOVATION-PLAN.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... CTE-PROPOS ... N-PLAN.pdf. CTE-PROPOSE ... ON-PLAN.pdf.

Renovation (Print).key - David J. Peterson
Aug 18, 2011 - Sound System. Oral Stops. Nasal Stops. Fricatives. Affricates ... front > furonto > “reception desk” animation > anime > anime. Rejection and.

Presentation Title Presentation Sub-Title
Helen Millicer, Member, Glen Eira BUG and Bicycle. Victoria Board. Thanks for permission to use slides from presentations given to PACIA members in Vic and ...

Presentation Information
Please arrive at the assigned meeting room 10 minutes before the session ... All meeting rooms are equipped with digital projectors and laptop computers.

Renovation bldg permit application.pdf
Page 1 of 1. BUILDING RENOVATION/ALTERATION PERMIT APPLICATION. CITY OF GRAMBLING. 127 King Street. Grambling, LA 71245. Telephone (318) 247-6120 Fax: (318) 247-0940. Type of Permit Applying: □ Residential Renovation □ Commercial Renovation. PROP

Green Street Plaza renovation
... in spring 2010, the plaza located between the US Bank branch and the drive-up facility ... For more information, please call the CTA information hotline at:.

Renovation (Print).key - David J. Peterson
Aug 18, 2011 - Sound System. Oral Stops. Nasal Stops. Fricatives. Affricates ... front > furonto > “reception desk” animation > anime > anime. Rejection and.

CTE-PROPOSED-RENOVATION-PLAN.pdf
Facility design for the next 30 years of career and technical education. • Code compliant egress .... A B. Page 4 of 7. CTE-PROPOSED-RENOVATION-PLAN.pdf.

October,3 October,4 -
Oct 3, 2016 - 14:50 Enrico Gratton (invited) , University California-Irvine, USA Metabolic ... Jerker Widengren (invited) ,KTH, Royal Institute of Technology,.

October,3 October,4 -
Oct 3, 2016 - Advanced Techniques and Applications. 14:50 Enrico Gratton (invited) , University California-Irvine, USA Metabolic changes in cells and ...

October,3 October,4 -
Oct 3, 2016 - Institute of Applied Physics, Snezhinsk, Russia An analytic perturbation model for high-resolution time-domain diffuse optical tomography in.