Revised July 2009

U.S. Hours and Productivity Behavior Using CPS Hours Worked Data: 1947-III to 2009-II

SIMONA E. COCIUBA Federal Reserve Bank of Dallas EDWARD C. PRESCOTT Arizona State University and Federal Reserve Bank of Minneapolis ALEXANDER UEBERFELDT Bank of Canada

ABSTRACT ________________________________________________________________________ We construct estimates of average hours worked and labor productivity for the U.S. economy. The data are based on the Current Population Survey (CPS). The methodology and data sources are presented in detail. ________________________________________________________________________

1. INTRODUCTION

The goals of this paper are to construct time series of average hours worked and labor productivity for the U.S. economy using the Current Population Survey (CPS). Average hours worked is defined as total hours worked per population ages 16 to 64. Labor productivity is defined as gross domestic product per total hours worked.

The primary source of data for hours and population is the Employment and Earnings publications of the U.S. Department of Labor, Bureau of Labor Statistics. These data are based on the CPS.

The population covered by our analysis is the non-institutional population, ages 16 to 64. We construct this series by adding CPS civilian non-institutional population ages 16 to 64 and military personnel worldwide.1

The total hours worked is constructed using CPS data on persons at work, and their weekly average hours of work. The CPS estimate of total hours does not include military hours. We estimate military hours and add it to the civilian hours to obtain total hours worked.

Figures 1 through 7 plot data on gross domestic product (GDP) per capita, average hours worked and labor productivity, respectively. The rest of the paper presents the methodology and data sources in detail.

1

The gross domestic product (GDP) measure provided by the Bureau of Economic Analysis includes on the cost side the salaries to military personnel worldwide, and not only the salaries of the military personnel in the U.S. territories. This justifies adding the military personnel worldwide in our measure of population.

FIGURE 1. U.S. Detrended* GDP per Noninstitutional Pop. 16-64 1947-III to 2009-I

110 1989-I = 100 105 100 95 90 85 * Quarterly trend growth: 0.5%

80 1947-III

1957-III

1967-III

1977-III

1987-III

1997-III

2007-III

FIGURE 2. U.S. Detrended* GDP per Noninstitutional Pop. 16-64 1989-I to 2009-I

110 1989-I = 100 105 100 95 90 85 * Quarterly trend growth: 0.5%

80 1989-I

1994-I

1999-I

2004-I

2009-I

FIGURE 3. U.S. CPS Hours Worked at Annual Rate per Noninstitutional Pop. 16-64 1947-III to 2009-II

1600

1500

1400

1300

1200

1100 1947-III

1957-III

1967-III

1977-III

1987-III

1997-III

2007-III

FIGURE 4. U.S. CPS Hours Worked at Annual Rate per Noninstitutional Pop. 16-64 1989-I to 2009-II

1600

1500

1400

1300

1200

1100 1989-I

1994-I

1999-I

2004-I

2009-I

FIGURE 5. U.S. Detrended* GDP per CPS Hours 1947-III to 2009-II

130 1989-I = 100 120

110

100 * Quarterly trend growth: 0.5%

90 1947-III

1957-III

1967-III

1977-III

1987-III

1997-III

2007-III

FIGURE 6. U.S. Detrended* GDP per CPS Hours 1989-I to 2009-II

102 1989-I = 100

98

94

* Quarterly trend growth: 0.5%

90 1989-I

1994-I

1999-I

2004-I

2009-I

FIGURE 7. U.S. Detrended* GDP per CPS Hours 1974-I to 2009-II

120 1989-I = 100

110

100

* Quarterly trend growth: 0.5%

90 1974-I

1979-I

1984-I

1989-I

1994-I

1999-I

2004-I

2009-I

2. AVERAGE HOURS WORKED ESTIMATE

Average hours worked is defined as total hours worked per noninstitutional population ages 16 to 64. The following definitions apply:

Noninstitutional population 16-64 = Civilian population + military personnel Total hours worked = Civilian hours + military hours

Civilian hours are constructed using CPS data on persons at work and their weekly average hours of work. Military personnel hours are calculated using military personnel data and assuming a 40 hour workweek.

For calculations, refer to Excel file “US Hours and Productivity”, worksheet “average hours worked”.

2.1. TOTAL CIVILIAN HOURS For details, refer to Excel file “US Hours and Productivity”, worksheet “Data1” and “Data1b”. Total hours worked by the civilian noninstitutional population are calculated as follows: Total civilian hours worked = Persons at work ⋅ Hours worked per week ⋅

52 4

DEFINITIONS Civilian noninstitutional population: All persons age 16 or older, that currently reside in one of the 50 states or the District Columbia and who are not inmates of institutions (e.g. penal and mental facilities, homes for the aged) and who are not on active duty in the Armed Forces. Employed person: All persons who, during the reference week (i) worked at least 1 hour as paid employees, worked in their own business, profession or on their own farm, or worked without pay for more than 15 hours in a family business or farm, or (ii) all persons who were not working, but who were temporarily absent from work due to illness, bad weather, vacation, labor-management disputes, job training or for personal reasons – whether or not they were paid for the time off. Persons at work: All employed persons who were not absent from work during the reference week.

DATA SOURCES •

For data from June 1947 to June 1959, the data source is U.S. Bureau of the Census, Current Population Reports, Labor Force, Series P-57, various issues. The P-57 reports were published by the U.S. Government Printing Office, Washington D.C.



For data from 1959 to June 1976, the data source is U.S. Department of Labor, Bureau of Labor Statistics, Employment and Earnings, Table A-24. Persons at work in agriculture and related and in nonagricultural industries by hours of work2



For data from June 1976 till present, U.S. Department of Labor, Bureau of Labor Statistics, http://www.bls.gov/cps/ –Go to BLS page http://data.bls.gov/cgibin/srgate. Insert code “LNU02005054” to get (Unadj) Average Hours, Total At Work, All Industries. Insert code “LNU02005053” to get (Unadj) Number Employed, At Work.

CALCULATIONS 1. From the Employment and Earnings publications we obtain monthly data on: -

Persons at work, and

-

Average hours worked by a person at work

2. We convert the monthly data into data on quarterly basis (see details below) 3. The series obtained are deseasonalized using the census deseasonalizer X12, multiplicative deseasonalizing as provided by E-views. 4. Total hours worked per quarter are given by the persons at work on a quarterly basis times the average hours worked per week on a quarterly basis times

52 . 4

Converting monthly data into quarterly basis data Let mi denote monthly data to be converted into quarterly data. Define: d=

min {m1 , m2 , m3} average {m1 , m2 , m3}

The quarterly basis data over those three months, q , is computed as follows:

⎧ 3 ⋅ average {m1 , m2 , m3 } − min {m1 , m2 , m3 } , ⎪ q=⎨ 2 ⎪average {m , m , m } , 1 2 3 ⎩

2

if d < 0.95 otherwise

The table number changes between different Employment and Earnings publications, but the title indicates data on persons at work by hours of work.

In words: If no particular value of the monthly data deviates too much from the average of those monthly data, then the value for the respective quarter is the average over all values. Otherwise, the minimum value is ignored, and the quarterly data is computed as the average of the two highest monthly values. The goal of this procedure is to sort out outliers on the low side. Consider the following example. Table 1 presents the data for selected months of the year 1998. With the procedure described we ignore the month of September 1998 when computing the data for the third quarter of 1998. TABLE 1. AVERAGE HOURS WORKED PER WEEK BY A PERSON AT WORK, IN 1998

Month

July

August

September

October

Hours

39.9

39.9

36.8

39.5

Note: In some other years in our dataset, the data for the month of September is a large outlier relative to data in the other months. This is due to a holiday (Labor Day) falling in the reference week (the reference week is the week containing the week of the 12th).

2.2. POPULATION DATA

For details, refer to Excel file “US Hours and Productivity”, worksheet “Data2”.

DATA SOURCES



U.S. Department of Labor, Bureau of Labor Statistics, http://www.bls.gov/cps/ -

Go to BLS page http://data.bls.gov/cgi-bin/srgate. Insert code “ LNU00000000” to get (Unadj) Civilian Noninstitutional Population 16 and over; insert code “LNU00000097” to get (Unadj) Civilian Noninstitutional Population 65 and over.

CALCULATIONS

1. From the BLS webpage we downloaded on April 16, 2007 monthly data on: -

civilian noninstitutional population, age 16 and over (Not Seasonally Adjusted)

-

civilian noninstitutional population age 65 and over (Not Seasonally Adjusted)

2. We compute quarterly data of Population 16 and over and Population 65 and over by averaging over monthly data. 3. We obtain quarterly civilian noninstitutional population ages 16 to 64.

2.3. MILITARY PERSONNEL DATA

For details, refer to Excel file “US Hours and Productivity”, worksheet “Data3”.

DATA SOURCES



U.S. Department of Defense, statistics on Military Personnel http://siadapp.dmdc.osd.mil/

CALCULATIONS

1. From the Department of Defense webpage we download data on: -

Military personnel in U.S. Territories

-

Military personnel worldwide

From 1956 onward, these data were collected on the 30th of September of each year; data prior to 1956 were collected in June of the respective year. Starting 2000, data are collected quarterly. 2. Data collected on the 30th of September is assumed to be the data for the forth quarter of the respective year. We obtain data for the first three quarters by linear interpolation, that is: mi ,t =

4−i i m4,t −1 + m4,t , where i = 1,2,3 denotes the quarter, 4 4

and t denotes the current year. 3. Starting year 2000, we have data for almost all quarters, we use linear

interpolation for any missing values.

3. LABOR PRODUCTIVITY ESTIMATE

Labor productivity is defined as gross domestic product per total hours worked.

DATA SOURCES



Bureau of Economic Analysis, http://www.bea.gov - Table 1.1.6 Real Gross Domestic Product (Billions of Chained (2000) dollars)

CALCULATIONS

1. From the BEA webpage we downloaded on April 16, 2007 quarterly real GDP. 2. We construct GDP per CPS hours worked, and GDP per capita. 3. We detrend using a growth trend of 0.5% per quarter (i.e. 2% annual growth trend)

For calculations, refer to Excel file “US Hours and Productivity”, worksheet “labor productivity”.

US Hours and Productivity 1947 to 2009

Using CPS Hours Worked Data: 1947-III to 2009-II. SIMONA E. ... The population covered by our analysis is the non-institutional population, ages 16 to 64. ... For calculations, refer to Excel file “US Hours and Productivity”, worksheet “average.

88KB Sizes 1 Downloads 211 Views

Recommend Documents

Revised February 2012 US Hours and Productivity ...
hours worked is defined as total hours worked per population ages 16 to 64. ... The population covered by our analysis is the non-institutional population, ages ...

Productivity, Taxes, and Hours Worked in Spain 1975-2000
Cole-Ohanian (1999) and Kehoe-Prescott (2002): growth accounting + general equilibrium growth model. Other researchers ⇒ role of labor market institutions: Blanchard and Jimeno (1999), Blanchard and Summers (1986), Sargent and. Ljungqvist (1995, 19

Productivity, taxes, and hours worked in Spain: 1970 ...
Jul 21, 2017 - compounding of depreciation in the cumulation of investment (3). For the growth accounting reported in Fig. 1, we have data on investment and ...

Market Potential and the Rise of US Productivity ...
Apr 4, 2013 - data, gave us the green light to use some of it, and warned us against potential mis-use of various data series. Special ... government…it is free unrestricted trade in everything under the same ...... Netherlands (very open, not so r

Heterogeneity and Long%Run Changes in US Hours ...
gaps and increasing labor income taxes observed in U.S. data are key determinants of hours .... of substitution between government and private consumption.

trade and productivity - CREI
institutional quality as well as geography and take into account the ... financial support from the CREI and CREA research institutes, the European Fund for .... Purchasing power parity (PPP) GDP differs from GDP in that the production of each good i

trade and productivity - CREI
Our empirical approach accounts for the endogeneity of trade and ... of openness as a measure of trade can be illustrated using a small open economies.

Three Doctors Pact, 1947
South Africa, full franchise rights must be extended to all sections of the South. African people, and to this end this Joint Meeting pledges the fullest cooperation.

us-jp-morgan-citigroup-nelnet-2009.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

Capital Reallocation and Aggregate Productivity
Jun 14, 2016 - model with dispersion shocks alone accounts for nearly 85% of the time .... elements: A is aggregate TFP and K is the aggregate stock of capital. ... focus on business cycle, not reallocation moments. 4 .... For the dynamic program of

Product Mix and Firm Productivity Responses to Trade Competition
demand shocks and the productivity of multi-product firms exporting to those ...... accounting then implies that this normalized number of consumers Lc ...

us-jp-morgan-citigroup-nelnet-2009.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. us-jp-morgan-citigroup-nelnet-2009.pdf. us-jp-morgan-citigroup-nelnet-2009.pdf. Open. Extract. Open with. Si

Product Mix and Firm Productivity Responses to Trade Competition
Sections 5 and 6 take these predictions to the data and measure large responses in ...... “The Quantitative Analytics of the Basic Neomonetarist Model.” Journal.

Rambler 1947.pdf
Butler as a principal, a teacher, a coach, and,. above all, as a friend. We, the class of 1947,. are proud to dedicate our Rambler to him. The 27th Annual Issue of.

Watch Scared To Death (1947) Full Movie Online Free ...
Watch Scared To Death (1947) Full Movie Online Free .Mp4______________.pdf. Watch Scared To Death (1947) Full Movie Online Free .

LINKING KNOWLEDGE TO PRODUCTIVITY: A ...
29 - Mechan. engineering. 475. 10589. 1328. 1969. 30 - Office mach.& comp. 35. 1030. 31. 47. 31 - Electrical. engin. 94. 1907. 383. 553. 32 - TV & telecom. eq.

1947 Podravski ZBORNIK.pdf
... luči ć i pregača, napos e pak duga kabani- ca kao "menten" modra, ukra šena motivima od očito prišivenih svjetlijih gajtana, optočena vunom ili krznom. Nema sumnje da oba lika prikazuju opremu tadašnjih imućnijih Virovaca. 51. Whoops! Th

Dates, Hours and Fees 2017
Ent. Grades 4-6. $1,107. $1,230. $1,230. $1,230. Senior Camp. Ent. Grades 7-8. $1,139. $1,266. $1,266. $1,266. Early Drop-Off. All. $70. $77. $77. $77. Extended Day. All. $120. $133. $133. $133. CIT Program (New applicant). Ent. Grades 9-10. CIT Prog

productivity growth and worker reallocation
Finally, a proof of existence of an equilibrium solution to the model is also provided. 1. INTRODUCTION. In their review ... one firm to another frequently. As Davis et al. (1996) and others document, job ... Finally, we prove that an equilibrium sol

Employment, Innovation, and Productivity: Evidence ...
on employment has made significant progress since the 1990s, when micro- ...... productivity trend in the production of old products, and the second for the ...

Productivity and Misallocation in General Equilibrium
Apr 7, 2018 - prices are used to “estimate” marginal products, cost, and utilities. • this is important because it means that the underlying output elasticities ...