Press Release Battle Ground Public Schools Director of Communications: Gregg Herrington, (360) 885-5337 PO Box 200 • Battle Ground, WA 98604-0200 • Office Location: 11104 NE 149th Street • Brush Prairie, Washington District Switchboard: (360) 885-5300

Dec. 18, 2012

Demolition of old bus barn and home economics building to conclude Dec. 19

This is the west end of the 1935 Battle Ground School District bus barn and home economics building after one day of demolition. The center portion still standing was to come down Wednesday, Dec. 19.

The center section of the old and long-vacant Battle Ground School District bus barn and home economics building was all that remained standing after Day 1 of the structure’s demolition Dec. 18. 3 Kings Environmental Inc. of Battle Ground, contractor on the job, was to be back at the Main Street site in downtown Battle Ground early Wednesday, Dec. 19, to knock down the three-story center portion of the 77-year-old brick-and-lumber building. Tuesday, the 3 Kings crew flattened the two-story sections at either end of

the 1935 building, starting at the east with the first bite into the roof at 8:07 a.m. The dinosaur-like excavator remained on school district property as it worked Tuesday. As a precaution, westbound traffic on Main Street was funneled into one of the eastbound lanes. Setback regulations must have been rather lax in 1935 -- or Main Street has been widened considerably on its north side. The building’s south wall is just the width of the sidewalk from the street. Wednesday, the company was to move the excavator, with its “clam” attachment, into the street itself to finish the demolition. This is the third vacant and unused Battle Ground School District building razed in 2012. In January, the old Central School on Parkway Avenue in downtown Battle Ground was burned in a fire-fighter-training exercise, thus saving on demolition expenses. The same fate awaited the old, vacant Amboy Middle School in June. -0MEDIA: The Battle Ground School District Communications Dept. will be unstaffed Dec. 19 to Jan. 2. To confirm completion of the demolition project, you might drive by the site or call 3 Kings Environmental Inc. at (360) 666-5464. (Or maybe call BurgerVille or Chase Bank and ask an employee to look out the window and tell you if the building is entirely down.) – Gregg Herrington

#####

The Battle Ground Public Schools provides equal opportunity in programs and employment and does not discriminate on the basis of race, color, national origin/language, creed/religion, sex, sexual orientation-including gender identity, disability, or the use of a service animal by a person with a disability, age, marital status, honorably discharged veteran or military status, HIV/Hepatitis C status. The district provides equal access to the Boy Scouts and other designated youth groups. Contact the following regarding questions and complaints of alleged discrimination: Title IX Sexual Harassment Officer, 360.885.5415; Title IX Compliance Officer 360.885.5338; Section 504/ADA Coordinator 360.885.5318; or a letter may be submitted to the designated coordinator at the Battle Ground Public Schools, PO Box 200, Battle Ground, WA 98604.

12-18-12 Bus barn demolition to wrap up Dec. 19.pdf

... Title IX Compliance Officer 360.885.5338; Section 504/ADA Coordinator 360.885.5318; or a. letter may be submitted to the designated coordinator at the Battle Ground Public Schools, PO Box 200, Battle Ground, WA 98604. Page 2 of 2. 12-18-12 Bus barn demolition to wrap up Dec. 19.pdf. 12-18-12 Bus barn demolition ...

142KB Sizes 0 Downloads 182 Views

Recommend Documents

DAILY WRAP UP -17TH APRIL.pdf
Page 1 of 4. MARKETS ENDS WITH NEGATIVE BIAS & NIFTY BELOW 9150. OASIS DAILY STOCK MARKET WRAP UP. MARKET COMMENTARY. The market ...

DAILY WRAP UP- sep 1st.pdf
COMPANY GROWTH RATE % CURRENT STOCK PRICE CHANGE %. MARUTI SUZUKI 12.20% Rs. 5058.25 + 0.11%. MAHINDRA & MAHINDRA 15% Rs.

DAILY WRAP UP- 2nd sept.pdf
Page 1 of 6. INDIAN MARKET ENDS WEEK ON A HIGH NOTE. DAILY MARKET WRAP UP. MARKET COMMENTARY. Indian stock markets said good morning ...

DAILY WRAP UP - 19th April.pdf
OASIS DAILY STOCK MARKET WRAP UP. MARKET COMMENTARY ... today. RPP Infra projects received an order from Power Grid Company of Bangladesh for its ... research report does not constitute a personal recommendation or take into.

DAILY WRAP UP - 8TH SEPT.pdf
As per market rumors, TCS has indicated a weak September. quarter. If accurate, TCS would be third company after Infosys and Mindtree to do so. As a result,.

DAILY WRAP UP - 10th Oct.pdf
... we're talking about socks or stocks, I like buying quality merchandise when ... Indo Borax & Chemicals Ltd ... Displaying DAILY WRAP UP - 10th Oct.pdf.

DAILY WRAP UP 4th April.pdf
OASIS DAILY STOCK MARKET WRAP UP. MARKET COMMENTARY. The market ... research report does not constitute a personal recommendation or take into.

DAILY WRAP UP -31st August 2016.pdf
exercise of independent judgment. Page 3 of 5. DAILY WRAP UP -31st August 2016.pdf. DAILY WRAP UP -31st August 2016.pdf. Open. Extract. Open with.

Bus Driver Job Announcement Dec 2015 (1).pdf
Page 1 of 2. PYRAMID LAKE JR./SR. HIGH SCHOOL. P.O. Box 267 - 711 State Street. Nixon, Nevada 89424-0267. (775) 574-1016 (775) 574-1043 – Fax.

Baltimore demolition contractors.pdf
demolition contractors in Annapolis Maryland. Annapolis Maryland demolition contractors. Annapolis ... Page 2 of 2. Baltimore demolition contractors.pdf.

Faulkner, William-Barn Burning.pdf
Older, the boy might have remarked this and wondered why not a big one; why should not a. man who had not only seen the waste and extravagance of war, but ...

The Barn Menu.pdf
Fajita chicken, crisp bacon, lettuce,. and cheddar cheese, tossed with. Parmesan peppercorn ranch dressing. Turkey Bacon Swiss. Grilled turkey, crisp bacon, ...

Silent Barn Financial Review.pdf
Silent Barn Financial Review.pdf. Silent Barn Financial Review.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Silent Barn Financial Review.pdf.

Mottagandet-av-ensamkommande-barn-i-vasterbotten_utskrift.pdf ...
Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Mottagandet-av-ensamkommande-barn-i-vasterbotten_utskrift.pdf. Mottagandet-av-ensamkommande-barn-i-v

Dec 12 PGCPS response to Scarato, Theodora - MPIA (follow up #2 re ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Dec 12 PGCPS response to Scarato, Theodora - MPIA (follow up #2 re lead remediation efforts) (1).pdf. Dec 12

Dec 12 PGCPS response to Scarato, Theodora - MPIA (follow up #2 re ...
Dec 12 PGCPS response to Scarato, Theodora - MPIA (follow up #2 re lead remediation efforts) (1).pdf. Dec 12 PGCPS response to Scarato, Theodora - MPIA ...

IVC SBC Wrap-Around Plan.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. IVC SBC ...