Girder Span Tables from the Code for #2 SP and a 40 lb. Live Load: Tributary Load Width** (feet) Girder Size

4’

5’

6’

7’

8’

9’

(2) 2x6

7’

6’

(2) 2x8

9’

(2) 2x10

10’

11’

12’

7’

7’

6’

5’

5’

10’

9’

8’

7’

7’

7’

6’

6’

6’

(3) 2x8

11’

10’

9’

8’

8’

7’

7’

7’

6’

(2) 2x12

12’

11’

10’

9’

8’

8’

7’

7’

7’

(3) 2x10

13’

12’

11’

10’

9’

9’

8’

8’

7’

(3) 2x12

16’

14’

13’

12’

11’

10’

10’

9’

9’

The maximum stair riser height is 8¼-inches and the minimum stair tread depth is 11-inches without noising. Stair tread and riser shall be of uniform height and width. Exception the bottom riser of an exterior stair adjoins an exterior walk, driveway, or finished grade, the height of the riser may be less than the height of the adjacent risers. When the total rise of the stairs is greater than 30-inches, open risers are not permitted by Code. Open riser is defined as permitting the passage of a 4-inch-diameter sphere. Handrail shall be provided on at least one side of stair with four or more risers. Handrail shall be minimum 34-inch to 38-inch maximum above stairs. Handrail shall be continuous the full length of the stairs from a point directly above the top riser of a flight to a point directly above the lowest riser of the flight. Handrails shall be returned to a wall or floor, or terminate in a newel post or in some type of end that will not catch clothing or limbs.

Decks designed with material other than wood require special approval from Building Inspector before installation.

City of Asheville

Are You Ready To Get All Decked Out?

Approved Non-Circular Hand Rails

* Spans are distances in feet between posts or supports. ** Tributary Load Width is typically half the distance from the house to the outside band of the deck and shall include the distance of any deck overhang. If the deck has multiple support beams, then the tributary load width is equal to the spacing between the beams. SP – Southern Pine (typical pressure treated lumber)

5. Bracing your deck for lateral support. For attached deck and over 4-feet above the ground, bracing for lateral support is required. Several methods of bracing are acceptable. The most common method is pressure treated 4” x 4” knee braces, provided on each column in both directions. The knee braces shall attach to each post at a point not less than 1/3 of the post length from the top of the post, and the braces shall be angled between 45° and 60° from the horizontal. Knee braces shall be bolted to the post and the girder with one 5/8” diameter hot dipped galvanized through bolt at each end. See example with Knee Braces for typical deck.

6. Will my deck need a Guardrail. Decks located more than 30-inches above ground shall have not less than 36-inch high guardrail. Horizontal spacing between the vertical pickets in guardrails shall be a maximum of 4-inches between members.

What YOU need to know before building an Attached or Free-Standing Deck to your home. Call the Building Inspector for a Framing & Final Inspection when deck is completed.

7. Will your deck have stairs to ground?

Decks with post heights over 20’-0” or decks with special loads such as Hot Tubs shall be designed and sealed by a NC Professional Engineer or Architect.

If you have any questions about these specifications, the use of other materials, standards or the Code requirements for your deck, please do not hesitate to call the Development Services Center (828) 259-5846.

First Things First…

3. How deep and how large must the footings be? Each deck support post must be supported by concrete footings. The size of each footing is determined by the tributary load imposed on it. See the diagram below for an explanation of tributary load. Each footing must be dug down into undisturbed soil and the minimum depth of 12-inches (frost line) below finished grade. Deck Footing are required to be inspected prior to placing the concrete, call the Building Inspector for a Footing Inspection.

Everyone dreams of the “perfect deck”… But getting from Point A- “the dream deck” – to Point B – planning and constructing it – is not always easy. This brochure will help you construct a safe, code-compliant “dream deck”.

Plan, Build & Inspect for Safety But, First Things First… Be sure to obtain a building and zoning permit for the deck before you build it. For information on how and where to obtain your permits, call or visit the Development Service Center in A-101 at the Public Works Building, 161 S. Charlotte Street or simply call us at 828-259-5846. Office hours are Monday through Friday from 8:30 AM to 5:00 PM. Why are permits and inspections required? To ensure that your deck will comply with the City’s zoning regulations and with the NC State Building Code. The zoning regulations establish minimum setbacks that must be maintained from property lines. The Building Code governs the method of construction, materials, means of support, attachment and requires safety features such as guardrails and handrails.

Some Things To Think About… All material to construct your deck must be decay resistant. Typically this is PT (pressure treated) lumber. Deck Supporting Hot Tub or Spa: Standard deck design of 40 lb. Live Load and 10 lb. Dead Load is not adequate support and cannot use this hand out.

Precast Footing

1. How will your deck be supported? Will your deck be attached to the house for support or will it be a “freestanding” deck? Attached Deck: The deck band is connected to the house band and the deck is supported partially by the foundation of the house. Attached decks are connected to the band or rim joist of the house by 5/8inch galvanized through bolts. The existing siding (except brick) which covers the house band must be removed so that the deck band makes full contact with the house band. Flashing must be installed between the house and deck band to prevent water from rotting the house band. Method 1 2

3

4

All Structures except Brick Veneer Fasteners 8’ Max. Joist 16’ Max. Joist Span Span 5/8” Hot Dipped Galv. Bolts with Washers* 1 @ 3’6” OC 1 @ 1’8” OC and and and 12d Common Hot 2 @ 8” OC 3 @ 6” OC Dipped Galv. Nails** Self-drilling Screw 12” o.c. 6” o.c. Fastener*** staggered staggered Brick Veneer Structures Fasteners 8’ Max. Joist 16’ Max. Joist Span Span 5/8” Hot Dipped Galv. 1 @ 2’4” OC 1 @ 1’4” OC Bolts with Washers*

*Minimum edge distance for bolts is 2½-inches. **Nails must penetrate the supporting structure band a minimum of 1½- inches oc – On Center ***min shank size to be 0.195” and length longer enough to penetrate thru the band. Screw shall have an allowable shear load of at least 250 lbs and a corrosion resistance finish. The approved screw MUST have an valid ICC-ES Report.

FOOTING SIZE (minimum) TRIBUTARY THICKNESS (inches) Poured in Precast Poured in AREA* Place Footing Footing Place Footing (square feet) (CAP BLOCK) 8 X 16 36 4 6 12 X 12 40 4 6 16 X 16 70 8 8 16 X 24 100 NP 8 24 X 24 150 NP 8

SIZE (inches) (CAP BLOCK)

8 X 16 12 X 12 16 X 16

Aluminum Flashing shall not be used.

2. What distance will the floor joist span between supports? Your floor joists must be sized to carry a minimum 40 lb. per sq. ft. live load. In some instances, a center girder is used to help meet this design criteria and to allow the use of smaller floor joist. Span Tables from the Building Code for #2 SP and a 40 lb. Live Load: Joist Size

2x6

2x8

Spaced @

Span

12” OC 16” OC 24” OC 12” OC 16” OC 24” OC

10’3” 9’4” 7’7” 13’6” 11’10” 9’8”

SP – Southern Pine (typical pressure treated lumber) OC – On Center

Joist Size 2x10

2x12

Spaced @

Span

12’ OC 16” OC 24” OC 12” OC 16” OC 24” OC

16’2” 14’ 11’5” 19’1” 16’6” 13’6”

* Round up to next larger size when exact area is exceeded. NP – Not Permitted

4. How high off the ground will the floor of your deck be? If the walking surface of the deck is 30-inches off the ground, your deck must be surrounded by guardrails which are a minimum of 36inches in height. The steps for the deck must also have guard/ handrail on both sides if there are 4 or more individual risers (spaces between steps). If the steps have a total rise of 30-inches or more above ground level, guard rails/hand rails must also be provided on open sides of the steps. POST SIZE (minimum) Post Size (inches) Post Height 4X4 8’0” 6X6 20’0”

DECK HANDOUT 2015 pdf.pdf

There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.
Missing:

238KB Sizes 2 Downloads 194 Views

Recommend Documents

2015 MCTM Spring Conf HANDOUT
[email protected] [email protected]. 7th Grade * Ramsey Middle School * Minneapolis Public Schools. Things to do BEFORE we begin… 1) If you are on twitter, TWEET us at @saravdwerf @sonjakrasean. Use the HASHTAG #mctmduluth.

HANDOUT
Why do you think Paul says we are light in verses 8–14? Is there something in our identity that has changed from darkness to light? Paul also asks us to “live as ...

MWE COURSE HANDOUT 2015-16.pdf
Brain storming. sessions. Chalk and Talk,. Test3. Page 3 of 12. MWE COURSE HANDOUT 2015-16.pdf. MWE COURSE HANDOUT 2015-16.pdf. Open. Extract.

Student Handout
A farmer wants to make the largest possible rectangular pen for his dogs. He has 60 feet of fencing. What is the largest area the pen can have? What should the ...

Side by side Handout 2015.pdf
Whoops! There was a problem loading this page. Retrying... Whoops! There was a problem loading this page. Retrying... Side by side ... dout 2015.pdf. Side by ...

Student Handout
However, in this problem you will use the TI-Nspire CAS to manually collect data in a spreadsheet, make a scatterplot of the data, and make observations based ...

Handout def
Jos Kole & Doret de Ruyter, VU University Amsterdam ... Project of sustaining teachers' professionalism through emphasis on role of professional ideals.

Better Searches handout
box to refine your searches and get the best results. © Exact Phrase ... What you'll get: results that include the exact phrase ... link to a particular website. What to ...

CSHA Handout
Phonemic Awareness. Activities and Consultation Strategies for Advanced Code.. Advanced Code Flash. Cards.. Fluency Builders.. Reading Games.

FOSS6 handout
The company lawyers considered employee demands for a raise but they. (344 ms) didn't act until a strike seemed imminent. VP modifier for a month. (372 ms).

Better Searches handout
What to type: “one small step for man". What you'll get: results that include ... What you'll get: results with the word “phone,” as well as “cell,” “cellular,” “wireless," ...

Weather Deck
Reporters: Bill Giers, FSO-PA. Jim Roche, VFC. Photographers: Bill Giers,. Rick Bloom. The Weather Deck: DHS/USCG-AUX,. District 7, Division 17, Flotilla 6,. P.O. Box 540867, Merritt Island,. FL. 32954, (877) 835-3760. This publication is intended fo

DWP Handout Sonnaert.pptx - crissp
bi-l-da. Evans 1995. 1. Morphology. • Suppletive paradigm (Guaraní). • Regular person stem + number affix. (Quechua). • Suppletive person stem + number affix.

Handout # : Dubai
in overdrive , and not surprisingly, the speed of it all has had unintended social and political consequences. KROFT: ... Some people call it Dubai, Inc., and besides all the investments at home, it includes extensive ... Informal. an intense stat

operant handout
... changed from fixed interval to variable interval and from fixed ratio to variable ratio. Above taken from: http://chiron.valdosta.edu/whuitt/col/behsys/operant.html.

PowerPoint Handout
During the PPT activity, take notes on Romanticism from the screen so that during our class ... Romantic Period, take notes on the pieces of art and poetry.

BCGL7 handout-Final
prze-na-siadywać się. PERD-DIST-sit self. Wiland (2012): generalization about Polish aspectual prefixes: • given any two vP-external prefixes that can stack in the order X>Y, the reversed order. Y>X is ill-formed (holds without without exception)

handout-english.pdf
computerised machine, hence you should carefully read instructions regarding handling of the. answersheet and the method of marking answers. You are ...

Handout 2.pdf
shadowy, crashing the boat? Is the moon bright or. hidden? The boat is rolling around, you see all are afraid. Suddenly you notice Peter has stopped shouting.

HANDOUT 2.pdf
What do you think about dream interpretation? - Do you ever have recurring dreams? - What is the best dream you ever had? - Speak about a nightmare you ...

SSILA 2011 Handout | Google Sites
I tentatively follow her proposal that such elements are base-generated adjoined to CP: ... (16) John, who met someone in the coffee shop, bought them a drink.