50% Feasibility Study Feedback Forum January 12, 2016 Medfield Elementary School Who are you? (Please select one): _____ Parent

_____ Student

_____ Principal

_____ School Staff

_____ Teacher

_____ Community Member (please specify): ___________________________________ _____ Agency Rep (Name of agency): ____________________________________________ _____ Other (please specify): ____________________________________________

Please provide us with feedback on Feasibility Study options #1-3 return to City Schools staff at the end of the meeting. Option 1:

Draft: Subject to change

Below includes pros and cons from the architect, please feel free to add additional comments

Pros/Likes  Utilizes existing building  Close proximity to play areas is maintained  Provides separate community space allowing securing of the school  Parks and Rec’s land will not altered during construction

Cons/dislikes  Inadequate amount of space for all requirements of the educational specifications (50,000 SF shortcoming)  Does not address site specific circulation issues – parking and pedestrian  Security concerns from unattached buildings

Additional feedback:

Option 2A:

Draft: Subject to change

Below includes pros and cons from the architect, please feel free to add additional comments

Pros/Likes

Cons/dislikes

Additional feedback:

Option 2b:

Draft: Subject to change

Below includes pros and cons from the architect, please feel free to add additional comments

Pros/Likes    

Utilizes existing building Option 2a – Provides separate parent and bus drop off Option 2a – Provides off street parking Option 2b – Provides off street parent and bus drop off

Cons/dislikes  

Onsite development limited by one story existing footprint. Option 2b - Parking needs are not met – requires continued use of off-site parking.

 

Provides separate community space access allow securing of the school Provides natural lighting to all instructional spaces



Does not provide optimal adjacencies of educational spaces

Additional feedback:

Option 3:

Draft: Subject to change

Below includes pros and cons from the architect, please feel free to add additional comments

Pros/Likes  Provides optimal orientation for daylighting of instructional spaces

Cons/dislikes  Encroaches onto Parks & Recreation’s property  Requires grading hillside

    

Optimal arrangement of instructional spaces Best potential for future expansion Provides separate bus and parent drop offs Optimal adjacencies of educational spaces Provides separate community space allowing securing of the school

Additional feedback:



Main parking lot remote from main entrance

Medfield 50% Feasibility Study Feedback with photos.pdf ...

Page 1 of 5. 50% Feasibility Study Feedback Forum. January 12, 2016. Medfield Elementary School. Who are you? (Please select one):. _____ Parent _____ Student _____ Principal _____ School Staff _____ Teacher. _____ Community Member (please specify): ...

1018KB Sizes 0 Downloads 182 Views

Recommend Documents

coffee shop feasibility study pdf
coffee shop feasibility study pdf. coffee shop feasibility study pdf. Open. Extract. Open with. Sign In. Main menu. Displaying coffee shop feasibility study pdf.

Barrambie Pre-feasibility Study Results - Neometals
Aug 25, 2015 - Operating and Capital costs are both valid as at July 2015 with an indicative ... Media. Richard Glass / Michael Weir. Citadel MAGNUS. T: +61 8 6160 4900 .... identifying the contacts during the second drilling campaign in 2007 (hole .

project feasibility study sample pdf
Page 1 of 1. File: Project feasibility study sample pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. project feasibility study sample pdf. project feasibility study sample pdf. Open. Extract. Open with. Sign In

CertBus-Novell-50-683-Study-Materials-Braindumps-With-Real ...
CertBus-Novell-50-683-Study-Materials-Braindumps-With-Real-Exam.pdf. CertBus-Novell-50-683-Study-Materials-Braindumps-With-Real-Exam.pdf. Open.

Mobility Feasibility Study of Fuel Cell Powered Hopping ...
1.2.2 Fuel Cell Power Systems for Mobile Robots. ..... Table 2: A comparison of current hydrogen storage methods [38]. ................................. 27. Table 3: The .... A great deal of research has been conducted on hopping robots. Hopping mobi

Feasibility Study of Pharmacy Robotic System (PRS ...
3. determine the number of staff needed to meet service target WT ... Specification of PRS to achieve WT target. With PRS ... Email: [email protected].

RAILDOCs041-12 Feasibility Study of CMMS Implementation A case ...
System development life cycles [11]. Page 3 of 13. RAILDOCs041-12 Feasibility Study of CMMS Implement ... A case study in RAJA Passenger Trains Company.

Grasping Virtual Objects: a Feasibility Study for an ... - Psychnology
Two reviews concerning various types of treatment for the arm in stroke patients concluded that more intensive exercise therapy is beneficial (Duncan, 1997; ...

FEASIBILITY STUDY OF 4D CAD IN COMMERCIAL ...
4D tools should include bar charts, component lists, and annotation tools in their graphical user ... sualization tool, analysis tool, and integration medium. We.

A Feasibility Study on Opportunistic Interference ...
a fundamental solution to achieve the optimal degrees-of- freedoms (DoF) in ... given SNR through computer simulations so that the sum-rate is maximized.

Grasping Virtual Objects: a Feasibility Study for an ... - Psychnology
Each finger sensing structure has one resistive bend sensor, which measures the global bending with a 3.0-degree maximum resolution over a range of 0 to 90 ...

Kalye Ocho - Feasibility Study on Streetfood Kiosk.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Kalye Ocho ...

FEASIBILITY STUDY OF 4D CAD IN COMMERCIAL ...
Users need to be able to generate 4D models at multiple levels of detail and generate and ... desktop VR (virtual reality) techniques and projection VR presentations ..... cast on top of the foundation so that once fully cured, they could be tilted .

Feasibility Study on Solar Photovoltaic Office Air ...
... 2011: FACULTY OF ENGINEERING, UNIVERSITY OF MORATUWA, SRI LANKA. Feasibility ..... Renewable Energy Laboratory, Golden, Colorado, May 2005.

Kalye Ocho - Feasibility Study on Streetfood Kiosk.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Main menu.

feasibility study cotton – made in africa
cotton is the third largest agricultural export after coffee and cocoa. ... The objective of the feasibility study is to identify mechanisms that would lead to changes in ...... many households also store millet, groundnuts and cowpeas (ICS 2002).

A Feasibility Study on Opportunistic Interference Alignment: Limited ...
Nov 3, 2012 - generating interference to other cells as a scheduling metric. Simulation results ... suitable performance measure that can be taken into account.

Mobility Feasibility Study of Fuel Cell Powered Hopping ...
Figure 9: A schematic of the fuel cell power system prototype. ...... MER Analysts Notebook (2007, June), “Endurance Crater DTM, ASCII Format”,. Available: ...

Head suspension with resonance feedback transducer
Jun 9, 2006 - 360/104. 5,335,126 A * 8/1994 Tokyuama et al. ........ .. 360/104. 18 .... 1 is an isometric view of a head suspension assembly including a strain ...

Head suspension with resonance feedback transducer
Jun 9, 2006 - Head Suspension in Hard Disk Drive; IEEE Transactions on. Magnetics; Sep. 1986 ...... UNITED STATES PATENT AND TRADEMARK OFFICE.

Preliminary study of tactile feedback devices featuring ...
Now, this has to be adapted to automated, ... cieved an email” and can be derived into several differ- ... ”Recieved a mail from Francis” only by changing a few.

619 FEASIBILITY STUDY.pdf
Retrying... 619 FEASIBILITY STUDY.pdf. 619 FEASIBILITY STUDY.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying 619 FEASIBILITY STUDY.pdf.