Areas of Operable Unit 5 (The River and Portage Creek)
River Reach/ Area Area 1 – Morrow Dam to Plainwell Dam Area 1 – Portage Creek Area 2 – Plainwell to Otsego City Dam Area 3 – Otsego City to Otsego Dam Area 4 – Otsego to Trowbridge Dam Area 5 – Trowbridge to Allegan City Dam Area 6 – Lake Allegan Area 7 – Allegan Dam to Lake Michigan
Average Average Length Water Depth River (miles) (ft) Width (ft) 21.9 3.4 181 2.0 2.3 32 1.7 2.5 450 3.4 3.8 200 4.7 5.0 248
Area (acres) 487 8 96 83 131
9.1
4.3
292
317
9.8 26
6.7 5.5
1,500 212
1,650 670
PLAINWELL
Area 1 – Morrow Dam to Plainwell Dam, Lower Reach of Portage Creek
Plainwell Dam
FLOW
PARCHMENT
Morrow Dam Portage Creek/ Kalamazoo River Confluence
US 131
KALAMAZOO
Portage Creek
Update on River Progress AREA 1 • Supplemental Remedial Investigation/Feasibility Study (RI/FS): Draft submitted 4/22/11 to EPA • Feasibility Study of potential remedial alternatives to be submitted in Fall/Winter 2011 • Final remedy decision for Area 1 in late 2012
AREA 2: Otsego City Impoundment Plainwell
Otsego City
Study Area
Update on River Progress AREA 2 • Conducting field reconnaissance Winter/Spring • Supplemental RI/FS sampling to begin Summer through Fall 2011 • Two field seasons to complete RI/FS investigation
Area 3: Otsego Impoundment
Update on River Progress AREA 3 • September 1, 2011: Start of Area 3 Supplemental RI/FS • Field work to begin in Spring 2012
Plainwell No. 2 Dam Area Kalamazoo River
Plainwell “The Island City”
Plainwell No. 2 Dam
Mill Race
Former River Oxbow MFE: July 14 2009 public mtg_FINAL.ppt
9
Plainwell No. 2 Dam Area Time-Critical Removal Action Project Area: 2009-2010
Access to River Construct staging areas and roadways Excavation, Verification and Restoration Habitat Restoration and monitoring – 3 yrs Bank Monitoring – 3 yrs Vegetation Monitoring – 3 yrs Exotic/Invasive Species Control
Summary of Construction Activities Bank Length Removed (linear feet) Volume Removed (cubic yards) Material Disposed (tons) Area Restored (acres) Woody Plantings (trees and shrubs) Confirmation Samples Collected
Page 1 of 13. Areas of Operable Unit 5. (The River and Portage Creek). River Reach/ Area Length (miles) Average Water Depth (ft) Average River Width (ft) Area ...
Total Population. Percent of Population Age 60+. Percent Having Grandchildren Living at Home. Median Income. Percent White. Percent Married. Portage County. Percent with High School Diploma Or Higher. Education. 1 CountyOverall.xls. Page 3 of 13. Por
PCB Design. Tutorial. by David L. Jones. Email: david AT alternatezone DOT com. Revision A - June 29th 2004. The latest version of this tutorial can be found ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. PCB Main.pdf.
Jun 29, 2004 - In many designs (high speed digital, low level analog and RF to ..... and below though, you are getting into the serious end of the business,.
was a large meadow system where the creek converged with the Little Truckee River. .... tapping of woodpeckers as well as the chirps, songs, and calls of other birds. .... Sagehen Basin smart phone field guides: http://www.inaturalist.org/guides.
R. Y. R. D. SOUTH RD. T. H. OM. A. S. S. T. N. E. P. E. A. N. H. W. Y. CENTRE RD. CENTRE RD. 0. 1. 2 kilometres. Map produced by City of Port Phillip GIS Unit,.
Stalley, a recent graduate of Wellesley College; and her sister Alyssa Stalley, a recent ... Chuck Stalley is the former California state champion in Ride & Tie.
For the BLM website, go to: www.blm.gov/ca/st/en/fo/ukiah/cachecreek.html ... a lush bed of red clover that is evidently more tasty than the bales of grass-hay back at ... At right, Sharon Wimberg is delighted with her 5th place finish and Top-Ten ..
Saving The West. ⢠We did the research. We now know how to stop the wildfires. ⢠We invited our community to help us decide what to do with that science.
... the apps below to open or edit this item. WQ_COSPBO02-Boulder-Creek-from-North-Boulder-Cree ... uth-Boulder-Creek-E.-coli-TMDL-w-Cover-Letter.pdf.Missing:
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Morrison Creek ...
C:\Anaconda\python.exe setup.py install. Install PyPy. Download PyPy from http://pypy.org/download.html and install it. Install Java. Download Java from ...
1. 2. 3. 4. B. A. 3. 2. 1. 5. C. D. 4. 6. 7. 8. A. A. SHEET 1 OF 1. Alarm Clock. TITLE. Display (Model B) - Dots PCB. REV. PART #. CLK-PC-06. DOCUMENT #.