Department of Environment and Natural Resources PHYSICAL ACCOMPLISHMENT REPORT As of the Quarter Ending June 30, 20145 OFFICE: DENR, Regional Office No. V PHYSICAL CODE

Program/Project/Activity

1 ADDITIONAL TARGETS:

Province

Performance Indicator

2

Location (Municipality/ District)

3

4

TARGET Annual 5

This Month

To Date

This Month

6

7

8

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date 9

8/7

9/5

COMPREHENSIVE AGRARIAN REFORM PROGRAM (CARP) UNDER THE LMS Land Survey, Disposition and Records 1. Patent Processing and Issuance (PPI) on Agricultural Lands 3,600 4,100

412 375

1,044 1,260

Total (ha.) Albay (ha.) Cam Norte (ha.) Cam Sur (ha.) Catanduanes (ha.) Masbate (ha.) Sorsogon (ha.)

3,600 4,100 550 492 150 150 1,520 1,638 200 200 760 1,200 420 420

333 387 39 36 14 14 147 159 20 20 77 122 36 36

1,440 1,634 180 152 68 68 619 657 80 80 323 507 170 170

Total

3,600 4,100

333 387.0000

1,440 1,634.0000

455 411.2653

1,560 2,002.3810

32% 25%

43% 49%

200 173

16 13

66 54

24

66 53.6503

36%

33% 31%

patent issuance monitored/ supervised (no/has)

Region

patents issued (no/has)

applications processed and forwarded to PENRO (no./has)

Albay Legazpi

ADDITIONAL

LMD

Page 1 of 5

132 17 32.4563 182 225.4590

144 153.35 88

1,560 2,002.3810 192 142.7964 41 59.9533 720 908.3130 81 62.5163 325 528.6020 201 300.2000

73% 25% 48% 29% 34%

45% 30%

43% 49% 35% 29% 27% 40% 47% 55% 41% 31% 43% 44% 48% 71%

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Guinobatan Cam Norte Daet Cam Sur Sipocot Naga Goa Iriga Catanduanes Virac Masbate San Jacinto Mobo Sorsogon Sorsogon

Location (Municipality/ District)

TARGET Annual

This Month

To Date

This Month

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

350 319

23 23

114 98

126 89.1461

36% 28%

150 150

14 14

68 68

17 32.4563

41 59.9533

25% 48%

27% 40%

360 540 150 140 700 723 310 235

36 54 16 16 68 68 27 21

146 219 61 56 285 285 127 97

39 64.8 20 12.198 75 123.213 48 25.248

183 280.8 80 48.798 285 468.243 172 110.472

27% 30% 33% 22% 26% 43% 38% 26%

51% 52% 53% 35% 41% 65% 55% 47%

200 200

20 20

80 80

160 300 600 900

16 28 61 94

68 120 255 387

420 420

36 36

170 170

81 62.5163 42 102 153.3500 88

41% 31%

68 120.27 257 408.3320

62%

201 300.2000

52%

40% 40%

43% 40% 43% 45% 48% 71%

2. Public Land Survey (PLS) lots surveyed and submitted for IVAS (ha)

Region

1,600

167

833

346.2458

lots verified and approved (has)

Region

35,444 258

833

4,167 258

881.2500 439

3. Inspection Verification and Approval of Surveys (IVAS)

a. DAR Submittal

1,390.6890 694

Approved DAR Surveys

ADDITIONAL

Page 2 of 5

86.8044 89

968.0551 694

86.8044 89

968.0551 694

22%

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET Annual

This Month

To Date

This Month

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

Verified AR Surveys b. Approved DENR Surveys Isolated PLS

16,818.3919 11,196.0000 11.1423 92.0000 16,807.2496 11,104.0000

16,818.3919 11,196.0000 11.1423 92.0000 16,807.2496 11,104.0000

75

90

73%

72%

45 10 20

45 10 20 15

136% 120% 120%

113% 100% 100% 100%

68

112

66%

90%

LAND MANAGEMENT SERVICES MEMORANDUM OF AGREEMENT WITH DEPED AND DENR TITLING OF SCHOOL SITES 1. Processing of application and preparation of special Patent

Total

125

22

103

issued special patents monitored

Region

125

22

103

special patent issued

Total

125

22

103

30 10 40 10 20 15

5 2 7 2 3 3

Total

125

22

103

Region (LMD)

125

40

40

112

0%

90%

Albay Legazpi Guinobatan

30 15 15

6 3 3

24 12 12

12 6 6

0% 0% 0%

40% 40% 40%

Cam Norte Daet

10

2

8

10

0%

100%

Cam Sur Sipocot Iriga

15 15

3 3

12 12

15 15

122% 122%

100% 100%

Albay Cam.Norte Cam.Sur Catanduanes Masbate Sorsogon draft special patent prepared with CSW and endorsed to PENRO (no.)

ADDITIONAL

Page 3 of 5

25 8 33 8 17 12 `

15 15

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET Annual

This Month

To Date

This Month

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

Remarks

Goa

10

2

8

15

15

180%

150%

Catanduanes Virac

10

2

8

3

10

36%

100%

Masbate Mobo San Jacinto

10 10

2 2

8 8

10 10

10 10

120% 120%

100% 100%

Sorsogon Sorsogon

15

3

15

15

100%

2. Survey of School Sites lot surveyed (no.)

Region

125

22

103

lots verified and approved

Region

125

22

103

125

40

40

6

5%

40

40

6

5%

CENTRAL BASED FUNDED ACTIVITIES

a.Survey &Mapping of Foreshotre Areas

foreshore areas surveyed & maps prepared

Cam Sur Masbate

b. Survey &Titling of School Sites (MOA with DepEd)

2,500 2,600

Titling Component

Draft Special Patent (SP)/ Proc. w/ CSW endorsed to LMB

125

Review of Special Patents (LMD)

Draft SP reviewed

125

Draft SP prepared with CSW

ADDITIONAL

Region

60

Page 4 of 5

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Draft SP prepared with CSW forwarded to PENRO

Survey Component

ADDITIONAL

Province

Albay Guinobatan Legazpi Cam Norte Daet Cam Sur Sipocot Iriga Goa Catanduanes Virac Masbate Mobo San Jacinto Sorsogon Sorsogon

Location (Municipality/ District)

TARGET Annual

This Month

30 15 15

To Date

8 4 4

10 40 15 15 10 10 10 10 10 15 15

lots surveyed (no.)

125

lots verified and approved

125

Page 5 of 5

This Month

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

30 15 15

18 9 9

30 15 15

60% 60% 60%

100% 100% 100%

15 10 5 5

15 10 10 10

15 10 10 10

100% 100% 200% 200%

100% 100% 100% 100%

Remarks

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Physical and Financial Accomplishment Monitoring Report As of the Quarter Ending June 30, 2015 Region : V

Code

Program/Project/Activity

Performance Indicator

1 A.01.a

Province

2

PHYSICAL ACCOMPLISHMENT

Location (Municipality/ District)

Annual

This Month

To Date

This Month

To Date

This Month

To Date

4

5

6

7

8

9

8/7

9/5

3

TARGET

PERCENTAGE

Remarks

General Management and Supervision A. Administrative Division Personnel Services 1. Personnel Actions

documents prepared acted upon (no.)

Region

12,000

1,000

6,000

3,278

22,503

55%

188%

2. Maintenance/updating of personnel records

records maintained/ updated (no.)

Region

8,000

668

4,000

1,674

9,831

42%

123%

sex disagregated data (no. of reports prepared)

Region

12

1

6

1

6

17%

50%

PES/IPCR/SPMS reviewed (no.)

Region

500

44

250

12

508

5%

102%

1. Building and facilities maintenance

building/facilities maintained (no.)

Region

6

6

6

6

6

100%

100%

2. Preparation of plans/designs/ estimate for the repair/ construction of buildings/ facilities

plans/designs/estimate for the repair/construction of buildings prepared

Region

18

2

9

10

38

111%

211%

3. Construction of building

contract awarded (no.)

Region

4. Property Inventory

inventory of property/ plan/equipment conducted

Region

3. PES/IPCR/SPMS/review

General Services

Masbate

1 1

Page 1 of 20

Code

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

inventory report submitted (no.)

Region

1

1

5. Property Disposal

reports submitted

Region

4

6. Procurement of supplies/ materials

APP consolidated

Region

1

disbursement voucher processed and submitted for payment (no.)

Region

400

34

200

7. Support to disabled

special lane maintained/ reports submitted (no.)

Region

1

1

8. Inventory of supplies/ materials/accountable forms

reports submitted (no.)

Region

2

1. Maintenance of general records

records/received/ released/classified/filed

Region

2. Inventory and disposal of records

reports submitted (no.)

PERCENTAGE

To Date

This Month

Remarks

To Date

1

0%

100%

5

100%

125%

1

0%

100%

35

391

18%

98%

1

1

1

100%

100%

1

1

1

1

100%

50%

20,000

1,668

10,000

2,192

14,302

22%

72%

Region

2

1

1

financial plan, monthly disbursement program and expanded plantilla prepared

Region

15

regional budget proposal prepared

Region

1

Quarterly Allocation by services for funds 101 and CARP prepared

Region

14

1

1

1

1

Records Management Services

B. Finance Management Budget and Fiscal Section

Page 2 of 20

(on-going)

1

14

1

15

100%

0%

107%

Code

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

complete, accurate recording of allotment of obligations in registries reflecting daily running balances updated database of allotment

Region

5

5

5

5

5

100%

100%

Region

3

3

3

3

3

100%

100%

expense vouchers with supporting documents evaluated and obligated

Region

3,500

268

1,400

499

1,998

36%

57%

updated posting of payments

Region

3,500

268

1,400

759

2,858

54%

82%

SAAs/NTAs/NFTs and funding vouchers for funds 101, 102 and CARP prepared per request of concerned

Region

40

4

20

35

117

175%

293%

bond applications prepared and submitted to BTR

Region

16

2

11

2

16

18%

100%

special budget request for terminal leave benefits prepared and submitted

Region

2

Financial Performance & Status Reports (FPSR) & Statement of Allotments Obligations and balances (SAOB) and Budget & Financial Accountability Reports (BFARs) prepared

Region

48

Page 3 of 20

1

4

24

42

92

50%

175%

192%

Code

Program/Project/Activity Cash and Collection Section

Accounting Section

A.01.b

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

LDDAP-ADA/Checks prepared/creditors paid (no.)

Region

4,200

334

1,500

437

2,519

29%

60%

FINDES/PaCS prepared and submitted (no.)

Region

300

17

100

72

318

72%

106%

reports prepared

Region

1,200

100

600

240

1,093

40%

91%

cash advances prepared/ petty cash fund (no.)

Region

4

1

1

2

5

200%

125%

official receipt issued/ collection deposited

Region

400

34

200

113

506

57%

127%

Contracts/vouchers/ payrolls received/ processed/obligated and released

Region

5,000

417

2,500

562

4,028

22%

81%

financial transactions recorded

Region

5,000

417

2,500

562

4,028

22%

81%

financial reports prepared

Region

900

75

450

130

889

29%

99%

accounting records maintained

Region

6,800

567

3,400

835

5,006

25%

74%

certification issued

Region

750

62

370

95

549

26%

73%

HUMAN RESOURCES DEVELOPMENT Human Resource Development I. Training Management and Development

Page 4 of 20

Code

Program/Project/Activity 1. Conduct of Learning Programs a. Capacity Enhancement Seminar for DENR personnel

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

no. of learning programs conducted

Region

1

1

1

1

5

100%

500%

b. Learning Program for new entrants pursuant to RATPLAN implementation

no. of learning program conducted

Region

2

1

1

1

2

100%

100%

c. Re-engineering and Renewal (R2) Program

no. of learning program conducted

Region

1

2. Assistance/facilitation in conducting technical learning programs

no. of learning programs assisted/faciltiated

Region

4

1

2

1

4

50%

100%

no. of learning programs monitored and evaluated

3

1

1

1

3

100%

100%

2. Monitoring and Evaluation of graduates and trainees of DENR Learning Programs

no. of graduates and trainees monitored and evaluated

2

1

1

5

0%

250%

3. Monitoring and Evaluation and assistance to grantees under the local/foreign scholarship program

no. of monitoring and evaluation (M&E) conducted and assistance provided to local/foreign scholarship grantees

1

1

1

5

0%

500%

4. Evaluation and Processing of Foreign/Local Scholarship

no. of scholarship evaluated and processed

5. Conduct of Learning Needs Assessment (LNA)

no. of LNA conducted and analyzed

3

1

1

6. Formulating/Developing training designs

no. of training designs formulated/developed

3

1

1

II. Research and Development 1. Monitoring and Evaluation of Learning Programs conducted

Demand Driven 1

Page 5 of 20

1

2

100%

67%

2

0%

67%

Code

Program/Project/Activity III. Career Management and Development 1. Assistance in the preparation of CESPES PCRF of CESO eligibles

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

no. of assistance extended to CESPESPCRF preparation

3

3

5

0%

167%

2. Assistance in the review and processing of CESPES accomplishment

no. of assistance extended in reviewing and processing of CESPES accomp.

1

1

5

0%

500%

3. Assistance in the admin. of Behavioral Competency Scale (BCS) Rating on CESPES

no. of assitance extended to BCS rating administration

1

1

3

0%

300%

4. Staff Development

no. of personnel who participated/attended trainings/seminar Regional Office Field Office

8 6

200% 100%

133% 100%

4

0%

100%

IV. Institutional Development and Linkages

V. Employees Welfare and Benefits

6 6

2 2

2 2

no. of linkages with NGAs/LGUs/Academe Private Sector

4

1

2

no. of healthy lifestyle/ wellness and physical fitness activities organized/ coordinated/facilitated

8

2

4

2

10

50%

125%

no. of inter-agency meetings/fora attended/ participated

4

1

2

1

6

50%

150%

no. of MOWEL fund claims processed/ evaluated/endorsed

8

2

4

3

7

75%

88%

Page 6 of 20

4 2

Code

Program/Project/Activity

Performance Indicator

Province

no. of assistance extended to employees claim on welfare and benefits

A.02

SUPPORT TO OPERATIONS

A.02.a

Data Management including System Development and Maintenance

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

8

2

4

23

28

575%

350%

1. Application and Database build-up and maintenance

2. Management and maintenance of VOIP, Safety and Security System, Connectivity and other ICT Resources/Facilities

Thematic maps (no.)

Region

8

2

4

1

6

25%

75%

maps generated and composed (no.)

Region

8

2

4

1

5

25%

63%

database maintained/ updated (no.)

Region

4

4

4

5

5

125%

125%

field monitoring conducted (no.)

Region

6

6

6

6

6

100%

100%

GAD database maintained/updated

Region

1

1

1

1

0%

100%

Info. System maintained - payroll systems - personnel info system - document tracking system

Region

3

3

3

3

3

100%

100%

LAN maintained (no.)

Region

1

1

1

2

2

200%

200%

workstations/internet connectivity operationalized/ maintained (no.)

Region

86

86

86

135

135

157%

157%

Page 7 of 20

Code

Program/Project/Activity

3. Attendance/Conduct of trainings workshops on ICT

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

monitoring of Field Office LAN connection

Region

17

17

17

17

17

100%

100%

Wide Area Network maintenance

Region

2

2

2

2

2

100%

100%

CCTV system maintained (no.)

Region

1

1

1

2

2

200%

200%

CCTV systems monitored = 6 PENROs = 11 CENROs = 2 Sectors

Region

19

19

19

19

19

100%

100%

hardware maintained (no.)

Region

15

15

15

30

30

200%

200%

ICT operationalized and equipments maintained

Region

1

1

1

1

1

100%

100%

maintenance of Field Office Voice Over Internet Protocol (VOIP)

Region

17

17

17

17

17

100%

100%

capacity building/training for Info. & Communications Technology (ICT)

Region

1

1

1

1

0%

100%

semestral statistical report consolidated (no.)

Region

2

1

1

0%

50%

data sets analyzed with report prepared (no.)

Region

1

4. Publication of Statistical Information

Page 8 of 20

1

100%

Code

Program/Project/Activity

Performance Indicator ENR statistical/profile updated

Province Region Albay Cam. Sur

briefing kit updated (no.)

5. Coordination/linkages/ attendance to statistical activities and related workshops/seminars A.02.c

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

1 1 1

1 1 1

1 1 1

1 1 1

1 1 1

100% 100% 100%

100% 100% 100%

1

1

1

1

1

100%

100%

2

4

4

0%

50%

briefing kit produced (no.)

Region

8

statistical activities conducted/coordinated (no.)

Region

2

production of news, press broadcast and photo releases (no.)

Region

250

20

newsletter produced (no.)

Region

2

newsletter copies distributed (no.)

Region

Tarpaulin designed, produced and installed(no)

1

1

50%

120

20

75

17%

30%

1

1

1

1

100%

50%

4,000

334

2,000

767

0%

19%

Region

24

2

12

12

20

100%

83%

print media advertisement on ENR prepared and published (no.)

Region

6

1

1

2

2

200%

33%

production and publication of coffetable books (no. of copies)

Region

200

100

100

Production and Dissemination of Technical and Popular Materials in theConservation and Development of Natural Resources including Environmental Education 1. Conduct IEC campaign activities a. Print

Page 9 of 20

50%

Code

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

video presentation produced (no.)

Region

2

airing of ENR materials on TV (no.)

Region

10

1

radio program produced and aired (no.)

Region

1

caravan/roadshow conducted (no.)

Region

event organized (no.)

800

250%

To Date

6

6

8

11

133%

110%

1

1

1

3

100%

300%

4

2

3

2

4

67%

100%

Region

1

1

1

1

1

100%

100%

press briefing conducted (no.)

Region

1

1

1

1

1

100%

100%

newspaper subscription

Region

3

3

3

3

3

100%

100%

books, journals and non-books catalogued and indexed (no.)

Region

145

17

100

45

97

45%

67%

3. Reports preparation

reports prepared and packaged (no.)

Region

11

1

6

2

6

33%

55%

4. Networking with Information Officer (IO)/Field Officer (FO)

linkages with IOs (no.)

Region

6

2

2

2

5

100%

83%

6. Updating and maintenance of DENR webpage

webpage updated and maintained (no.)

Region

2

2

2

2

2

100%

100%

Page 10 of 20

134

This Month

5

2. Maintain ENR Library

2,600

To Date 2,720

c. Interpersonal

Region

This Month

Remarks

2,000

b. Broadcast

minutes of airtime attained in airing ENR info

To Date

PERCENTAGE

105%

300%

Code A.02.d

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

Legal Services

28

3

14

1

6

7%

21%

28

3

14

4

8

29%

29%

100

9

50

20

126

40%

126%

1

1

1

1

1

100%

100%

cases inventoried (no.)

4

1

2

1

2

50%

50%

1. Evaluation of Cadastral Project

Cadastral Project evaluation

4

1

2

2

0%

50%

2. Special Assignment (DENR 5 projects assessment)

DENR 5 project assessed

4

1

2

2

0%

50%

3. Property Management Review

property management review conducted

4

2

2

1

2

50%

50%

4. Personnel Enhancement

seminar/workshop participated

5

1

3

0

0

0%

0%

1. Conduct Investigations

2. Resolution of ENR cases

court hearings attended and appearances made (no.) - investigations conducted ENR related cases resolved (no.) Maintenance/Upgrading of Law Library/purchase of books and other references

3. Inventory of pending ENR Cases INTERNAL AUDIT SYSTEM

A.03

A.03.a

OPERATIONS MFO 1 ECOSYSTEM POLICY SERVICES Formulation and Monitoring of ENR Sector Plans, Programs, and Projects

Page 11 of 20

Code

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

Formulation and Monitoring MTPDP/AIP/RDIP/RDP/ MDG updated (no.)

Region

4

worktargets and budget proposals prepared, reviewed and evaluated (no.)

Region

16

WFP by congressional district prepared (no.)

Region

16

forward estimates prepared

Region

1

GAD plan/proposal prepared (no.)

Region

2

1

1

50%

= prepares OPCR

OPCR prepared/ submitted to C.O.

Region

1

1

1

100%

7. Validation of DPCR

DPCR validated

Region

16

8

8

50%

8. Prepares quarterly performance assessment based on reported accomp.

quarterly performance assessment report prepared

Region

4

1

2

1

25%

9. Prepares Accomplishment Reports

online submission of accomplishment report = monthly report

Total

252

21

126

23

132

18%

52%

Region FMS LMS PAWCZMS

12 12 12 12

1 1 1 1

6 6 6 6

1 1 1 1

6 6 6 6

17% 17% 17% 17%

50% 50% 50% 50%

Albay Legazpi Guinobatan

12 12 12

1 1 1

6 6 6

1 1 1

6 6 6

17% 17% 17%

50% 50% 50%

1. Preparation of work targets and budget proposals

2. Conduct of gender Planning

2

2

2

100%

50%

16

16

16

16

100%

100%

16

16

16

16

100%

100%

1

1

100%

100%

6. Implementation of SPMS

Page 12 of 20

Code

Program/Project/Activity

Performance Indicator

= Consolidated quarterly Report prepared

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

Cam. Norte Daet

12 12

1 1

6 6

1 1

9 9

17% 17%

75% Bi-monthly 75% report submitted

Cam. Sur Sipocot Naga Goa Iriga

12 12 12 12 12

1 1 1 1 1

6 6 6 6 6

1 1 1 1 1

6 6 6 6 6

17% 17% 17% 17% 17%

50% 50% 50% 50% 50%

Catanduanes Virac

12 12

1 1

6 6

2 2

6 6

33% 33%

50% 50%

Masbate San Jacinto Mobo

12 12 12

1 1 1

6 6 6

1 1 1

6 6 6

17% 17% 17%

50% 50% 50%

Sorsogon Sorsogon

12 12

1 1

6 6

1 1

6 6

17% 17%

50% 50%

Total

84

21

42

21

42

50%

50%

Region FMS LMS PAWCZMS

4 4 4 4

1 1 1 1

2 2 2 2

1 1 1 1

2 2 2 2

50% 50% 50% 50%

50% 50% 50% 50%

Albay Legazpi Guinobatan Cam. Norte Daet Cam. Sur Sipocot Naga Goa Iriga Catanduanes Virac Masbate San Jacinto

4 4 4 4 4 4 4 4 4 4 4 4 4 4

1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 2 2 2 2 2 2

50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%

50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%

Page 13 of 20

Code

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

This Month

Mobo Sorsogon Sorsogon

4 4 4

Annual report prepared

Region

1

10. Attends inter-agency meetings (NEDA, DILG, DBM, LGUs, RDC, EDC)

meetings attended (no.)

Region

8

2

4

11. Maintain/compile Policy Issuances

no.

Region

4

1

2

12. Monitoring and Evaluation of major DENR programs/projects (NGP, Cadastral, Delineation and demarcation of Protected Areas topographic base mapping and coastal resource mapping and other projects

projects monitored

Region

8

2

4

Albay Legazpi Guinobatan

4 4 4

1 1 1

Cam. Norte Daet

4 4

Catanduanes Virac

1 1 1

To Date 2 2 2

1 1 1

PERCENTAGE

To Date

This Month

Remarks

To Date

2 2 2

50% 50% 50%

50% 50% 50%

1

100%

100%

14

75%

175%

34

0%

850%

3

11

75%

138%

2 2 2

3 3 4

4 4 5

150% 150% 200%

100% 100% 125%

1 1

2 2

1 1

2 2

50% 50%

50% 50%

12 12

1 1

6 6

1 1

6 6

17% 17%

50% 50%

1

3

13. Prepares/presents ENR programs in inter-agency conferences

presentations prepared/ presented (no.)

Region

4

1

2

1

9

50%

225%

14. Monitor compliances to agreements during EXECOM/ ManCon

compliances monitored

Region

12

1

6

2

8

33%

67%

15. Prepares communications memoranda and other issuances

communications prepared

Region

40

4

20

3

43

15%

108%

Page 14 of 20

Code

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

Annual

This Month

Region

4

watershed site characterized (no./ha) - primary data gathering - secondary data gathering - report preparation

Region

1 3,800

conduct gender workshop for integration in IWMP

Region

IWMP prepared and submitted (no./ha.) - small watershed 10,000 ha.

Region

FLUP prepared/ drafted (no.)

Region

conduct gender workshop for integration in FLUP

Region

FLUP finalized and adopted by the SB (no.)

Region

16. Provide direction and information as member of inter-agency committees (PRAISE, ARTA, PMT DENR-DILG-DA convergence SPMS, B+WISIRE PSB, PERC, PSLMC, LAMS, AMT, PMB, PMB, GAD)

PHYSICAL ACCOMPLISHMENT

TARGET

1

To Date

This Month 2

2

To Date 16

PERCENTAGE This Month 100%

Remarks

To Date 400%

Forestry Preparation and updating of climate resilient plans 1. Watershed Management Planning 1.a Watershed Characterization (including vulnerability assessment)

1.b Preparation of Integrated Watershed Management Plan (IWMP) (including NGP areas)

Pili River Watershed Castilla/Sorsogon Manito, Albay

on going data gathering

1

Pili River Watershed Castilla/Sorsogon Manito, Albay

1 3,800

on going data gathering

2

on going data gathering

2. Forest Land Use Planning 2.a Preparation of FLUP

2.b Finalization and Adoption of Plan (2nd year)

Ligao and Oas

1

Lagonoy, Del Gallego Presentacion

3

Page 15 of 20

Code

Program/Project/Activity

Performance Indicator

Forest Data Management 1. Operation/Maintenance of Forestry Information System

2. Relocation and re-measurement of Forest Resources Assessment (FRA) Tracks 3. Forest Products Utilization and Price Monitoring - Price monitoring of forest products

Province

Total

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

18

18

18

18

18

100%

100%

forest tenure record assessed and validated and integrated (no.)

Region

1

1

1

1

1

100%

100%

forest tenure record assessed and validated (no.)

Total

6

6

6

6

6

100%

100%

Albay Cam. Norte Cam. Sur Catanduanes Masbate Sorsogon

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100%

forest tenure record created/updated (no.) (1 tenure = 1 record)

Total

11

11

11

11

11

100%

100%

1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

FRA tracks relocated and re-measured (no.)

Region

6

1

3

3

0%

50%

132

11

66

11

66

17%

50%

24 12 12

2 1 1

12 6 6

2 1 1

12 6 6

17% 17% 17%

50% 50% 50%

Legazpi Guinobatan Daet Sipocot Naga Goa Iriga Virac San Jacinto Mobo Sorsogon

Total price data gathered processed and summarized (no.)

Albay Legazpi City Guinobatan

Page 16 of 20

Code

Program/Project/Activity

- Statistical Report

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

Cam. Norte Daet

12

1

6

1

6

17%

50%

Cam. Sur Sipocot Naga Goa Iriga

48 12 12 12 12

4 1 1 1 1

24 6 6 6 6

4 1 1 1 1

24 6 6 6 6

17% 17% 17% 17% 17%

50% 50% 50% 50% 50%

Catanduanes Virac

12

1

6

1

6

17%

50%

Masbate San Jacinto Mobo

24 12 12

2 1 1

12 6 6

2 1 1

12 6 6

17% 17% 17%

50% 50% 50%

Sorsogon Sorsogon

12

1

6

1

6

17%

50%

4

1

2

2

2

100%

50%

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%

50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%

statistical report prepared Region Albay Legazpi City Guinobatan Cam. Norte Daet Cam. Sur Sipocot Naga Goa Iriga Catanduanes Virac Masbate San Jacinto Mobo Sorsogon Sorsogon

Page 17 of 20

Code

Program/Project/Activity Establishing Partnership and Collaboration with Stakeholders (e.g MFPC, NCI, POs, etc.) (consultation to CSO, RDC, NGOs

Performance Indicator

groups created/ strengthened (no.)

MOA/resolution signed (no.)

Revenue Generation

Revenue generated (Php)

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

Total Albay

1

1

1

1

1

100%

100%

Cam. Norte

1

1

1

1

1

100%

100%

Cam. Sur Sipocot Iriga

1 1 1

1 1 1

1 1 1

1 1 1

1 1 1

100% 100% 100%

100% 100% 100%

Catanduanes

1

1

1

2

0%

200%

Masbate San Jacinto

1 1

1 1

1 1

100%

100% 100%

Sorsogon Sorsogon

1 1

1 1

1 3

0% 0%

100% 300%

Total

12

Albay Cam. Norte Daet

1 1 1

Cam. Sur Sipocot Iriga Catanduanes Virac Masbate San Jacinto Sorsogon Sorsogon

1 1 1 1 1 1 1 1 1

Total

1 1

1,749,000

1 1

1 1

1 1

1 1

100% 100%

100% 100%

148,600

856,600

304,925

1,170,395

36%

67%

Page 18 of 20

Code

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

To Date

This Month

PERCENTAGE

To Date

This Month

Remarks

To Date

Albay Legazpi Guinobatan

108,000 93,000 15,000

9,000 7,750 1,250

54,000 46,500 7,500

5,278 2,834 2,444

84,941 66,062 18,879

10% 6% 33%

79% 71% 126%

Cam. Norte

160,000

13,334

80,000

11,588

93,448

14%

58%

Cam. Sur Sipocot Naga Goa Iriga Catanduanes Masbate Sorsogon

330,000 90,000 70,000 130,000 40,000 115,000 836,000 200,000

30,000 8,333 5,000 13,333 3,333 9,600 70,000 16,666

145,000 40,000 25,000 60,000 20,000 57,600 420,000 100,000

27,287 21,466 3,036

19% 54% 12%

2,785 24,192 233,726 2,854

249,467 115,286 24,106 89,452 20,623 87,554 577,660 77,326

14% 42% 56% 3%

76% 128% 34% 69% 52% 76% 69% 39%

1

1

1

1

100%

100%

PAWCZMS Protected Area Establishment draft proclamation prepared (no.)

Region Libmanan Caves National Park, Libmanan, Cam. Sur Capalonga WFR Capalonga, Cam. Norte Island of Basot, Quinalasa, Cam. Sur Island of Guinauayan and Pobre, Asid Gulf, Masbate

4 1

1 1 1

public hearing/consultation conducted (no.)

Region

Capalonga WFR Capalonga, Cam. Norte

1

SRPAO 100% completed

Region

Lagonoy WFR Lagonoy, Cam Sur

1

regional review conducted (no.)

Region Libmanan Caves National Park, Libmanan, Cam. Sur

4 1

Page 19 of 20

Code

Program/Project/Activity

Certified Correct By:

ELIZABETH ROSE G. PADILLA Chief, Planning & Mgt. Division

Performance Indicator

Province

Location (Municipality/ District)

PHYSICAL ACCOMPLISHMENT

TARGET Annual

This Month

Capalonga WFR Capalonga, Cam. Norte

1

Island of Basot, Quinalasa, Cam. Sur

1

Island of Guinauayan and Pobre, Asid Gulf, Masbate

1

To Date

This Month

To Date

Recommending Approval:

ATTY. ARNEL P. RODRIGUEZ OIC Assistant Regional Director for Management Services

Page 20 of 20

AL. O. OROLFO OIC Assistant Regional Director for Technical Services

PERCENTAGE This Month

To Date

Remarks

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Physical and Financial Accomplishment Monitoring Report

FORM 2

As of the Quarter Ending June 30, 20145

REGIONAL OFFICE NO. V PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET To Date Annual

This Month

This Month Jan-Jun

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

Remarks

MFO 1 Ecosystems Policy Services A.03.a

Formulation and Monitoring of ENR Sector, Policies, Plans, and Projects on-going data gathering

IWMP prepared & approved (no.)

Reg

Pili River Watershed Castilla, Sorsogon Manito Albay

1

Watershed characterized/ vulnerability assessed (no)

Reg

Pili River Watershed Castilla, Sorsogon Manito Albay

1

on-going data gathering

FLUP finalized and adopted by

Reg

Lagonoy, De Gallego Presentacion

3

on-going data gathering

4 1

on-going data gathering

the Sanguniang Bayan (no) Draft proclamation/bills with maps reviewed & endorsed to OSEC thru BMB (no)

Reg Libmanan Caves Natural Park Libmanan, Cam, Sur Capalonga WFR Capalonga Cam Norte Island of Basot Quinalasa, Cam Sur Island of Guinauayan and Pobre Asid Gulf, Masbate

1

1

1

Page 1 of 6

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET To Date Annual

This Month

This Month Jan-Jun

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

PAs delineated with final maps endorsed to the Secretary PAs demarcation with final map endorsed to the Secretary MFO 2 Ecosystem Management Service A.03.b

Forest Development, Rehabilitation and Protection National Greening Program

*

Area maintained and protected (ha) - 2015 plantation

Total

18,956

Area maintained and protected (ha) - 2014 plantation

Yr. 2

21,812

21,812

21,812

21,812

21,812

100%

100%

Total

20,499

20,499

20,499

20,499

20,499

100%

100%

Area maintained and protected (ha) - 2013 plantation

Yr. 3

25,284

25,284

25,284

25,284

25,284

100%

100%

Total

22,096

22,096

22,096

22,096

22,096

100%

100%

Seedlings produced (no)

Total

6,080,200

2,026,733

6,080,200

2,847,063

5,404,041

47%

89%

Area planted (ha)

Total

18,956

Forest extension officers hired (no)

Total

165

165

165

165

165

100%

100%

26 15 23 34 18 23 26

26 15 23 34 18 23 26

26 15 23 34 18 23 26

26 15 23 40 18 23 26

26 15 23 40 18 23 26

100% 100% 100% 118% 100% 100% 100%

100% 100% 100% 118% 100% 100% 100%

Reg Albay Cam. Norte Cam Sur Catanduanes Masbate Sorsogon

SPAs maintained (no) A.03.c

Land Surveys, Disposition and Records Management Land Disposition/Distribution Patent Processing and Issuance Page 2 of 6

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET To Date Annual

This Month

This Month Jan-Jun

Residential 10023

Patents issued (no)

Total Albay Provincewide Cam N Daet,Talisay,Sta. Elena Cam S Provincewide Cat Provincewide Masbate Provincewide Sorsogon Provincewide

Lots surveyed verified and approved (no) Commercial & Industrial use

Patents issued (no)

Reg

Regionwide

Reg Albay Cam Sur Cat'nes Masbate Sorsogon

Titling of sites for public and quasipublic use

CSW with special patents prepared and endorsed to LMB (no)

Reg

Validation of encoded data

Survey records validated (no)

Reg

A.03.d

Management of Protected Areas, Wildlife, Coastal and Marine Resources

A.03.d.1

Protected Areas Development and Management

LMD

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

4,150

413

1,653

600

1,747

36%

42%

750 450 1475 375 700 400

77 33 142 35 75 50

282 150 536 135 350 200

130 40 135 37 116 142

282 82 675 150 354 204

46% 27% 25% 27% 33% 71%

38% 18% 46% 40% 51% 51%

4,500

500

2,500

989

3,490

40%

78%

13 2 5 1 3 2

1

4

5

7

125%

54%

1

3

3

5

100%

100%

1

1 1

1 1

100%

33% 50%

28

3

20

12

22

60%

79%

458,427

50,000

150,000

600

323,738

Ecotourism Mgt. Plan approved by PAMB (no)

Reg

MVNP

1

Report on the highlights of implementation status of cave management plans submitted to BMB

Reg

Cabulacao Cave Bacacay, Albay Mimaroso Cave Rapu-Rapu, Albay Nagtikwil Cave Bacacay, Albay Dalangin Cave

1

1

1 1 1

Ragay, Cam Sur

Page 3 of 6

71%

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET To Date Annual

This Month

This Month Jan-Jun

Pantil Cace San Andres, Catanduanes Karilagan Cave Virac, Catanduanes Puting Bato Cave San Fernando, Masbate Loakan Cave Monreal, Masbate Pio Cave Pilar, Sorsogon Kulalamnit Cave Gubat, Sorsogon

Inland wetlands assessed with reports reviewed and endorsed to BMB (no)

Reg Lake Bato Bato, Cam. Sur Lake Buhi Buhi, Cam. Sur Prieto Diaz, Sor.

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

1

1

1

100%

1

1

1

100%

1

1

1

100%

1

1

1

100%

1

1

1

100%

1

1

1

100%

3 1

3 1

3 1

100% 100%

1

1

1

100%

1

1

1

100%

5

125%

CSW with draft DAO recommending critical habitatssubmitted to the Sec thru BMB (no) A.03.d.2

Protection and Conservation of Wildlife Reports on conservation activities reviewed and endorsed to BMB (no)

A.03.d.3

Reg

4

1

3

4,510 1700

703

4,510 1700

Management of Coastal and Marine Resources Sustainable Management of Coral Reefs and Associated Habitats

Area of habitat and resources mapped and assessed with report submitted to BMB (no)

Reg Banocboc Calaguas Is. and Fish Sanctuary Vinzons, Cam Norte Macabari Fish

700

700

Sanctuary Marine

Page 4 of 6

2,550 1700

4,510 1700

700

57% 100%

100% 100%

100%

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET To Date Annual

This Month

This Month Jan-Jun

Reserve Barcelona, Sorsogon Tres Marias Fish Sanctuary Libmanan Pungco-Uson Fish Sanctuary Bacacay

Provision of TA in ICM

Establishment of Marine Protected Areas/Critical Habitats

LGUs provided TA in MCEP preparation (no)

Reg

LGUs provided TA in ICM Plan preparation (no)

Reg

850

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

850

283

850

850

1260

420

1260

5 1 1 1 1 1

1

3 1 1 1

1

3 1 1 1

33%

60%

Panganiban, Cat'nes Viga, Catanduanes Bagamanoc, Cat'nes Caramoran, Cat'nes Presentacion, Cam Sur

5 1 1 1 1 1

1

3 1 1 1

1

3 1 1 1

33%

60%

Panganiban, Catnes Viga, Catanduanes Bagamanoc, Catnes Caramoran, Catanduanes Presentacion, Cam. Sur

53

5

16

15

26

94%

49%

100%

1260

100%

100%

LGUs provided TA in MPA establishment (no)

MFO 3 Ecosystem Regulation Services A.03.g

Enforcement of Laws, Rules and Regulations

A.03.g.1

Permit issuance & Monitoring of Forest and Forest Use Area patrolled and protected (ha)

A.03.g.2

Management of Foreshore Areas/Patrimonial Friar Lands Issuance of permits/lease of contracts

Permits/lease contracts/ deeds issued (no)

Reg

LMD

Page 5 of 6

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET To Date Annual

This Month

This Month Jan-Jun

A.03.g.3

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

Issuance of PACBRMA and Monitoring of PAs, Wildlife, Coastal and Marine Resources Areas Biodiversity related cases reported and acted upon (no) Apprehension/surveillance conducted with reports submitted to BMB (no)

A.03.g.4

Reg

3

-

Operations Against Illegal Environment and Natural Resources Apprehended forest products (no) Apprehended forest products (cu.m.)

Page 6 of 6

2

2

0%

67%

Remarks

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Physical and Financial Accomplishment Monitoring Report As of the Quarter Ending June 30, 20145 REGIONAL OFFICE NO. V

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Jan-June

Remarks

PERCENTAGE

To Date This Month

To Date

This Month

To Date

MFO 2: Ecosystem Management Services

A.03.b

Forest Development, Rehabilitation and Protection

8,281,450.00

2,760,483

8,281,450.00

6,080,200

2,026,733

6,080,200

2,847,063.00

5,404,041

47%

89%

Region 5

6,080,200

2,026,733

6,080,200

2,847,063

5,404,041

47%

89%

Region

819,700 943,400 1,124,900 1,294,200 571,800 289,000 1,037,200

273,233 314,467 374,967 431,400 190,600 96,333 345,733

819,700 943,400 1,124,900 1,294,200 571,800 289,000 1,037,200

79,499 421,320 1,124,900 600,096 362,451 109,237 149,560

571,319 943,400 1,124,900 1,110,425 571,800 213,337 868,860

10% 45% 100% 46% 63% 38% 14%

70% 100% 100% 86% 100% 74% 84%

480,500

160,167

480,500

480,500

480,500

100%

100% *

102,500

34,167

102,500

102,500.00

102,500

100%

100%

378,000

126,000

378,000

108,115.00

378,000

29%

100%

129,500

43,167

129,500

129,500

129,500

100%

100%

90,500

30,167

90,500

90,500

90,500

100%

100%

158,000

52,667

158,000

158,000

158,000

100%

100%

900,000

300,000

900,000

597,375.00

860,637

66%

96%

1. National Greening Program 1.1 NGP Regular

seedlings produced/ procured (no.)

a. Seedling Production

seedlings produced/ procured (no.)

Albay Cam. Norte Cam. Sur Catanduanes Masbate Sorsogon Timber (500/ha)

Total Region

Libmanan

Cam. Sur Sipocot Panaytanayan & Nuevo, Ragay Dalupaon, Tilnac & San Antonio, Pasacao Tinalmud Nuevo, Cambalido & Cawayan, Libmanan Fuelwood (1000/ha)

MFO 2

Total

Page 1 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Jan-June

Remarks

PERCENTAGE

To Date This Month

To Date

This Month

To Date

348,000

116,000

348,000

348,000

348,000

100%

100%

Rapu-Rapu

211,000 137,000

70,333 45,667

211,000 137,000

211,000.00 137,000.00

211,000 137,000

100% 100%

100% 100%

Sta. Elena

402,000

134,000

402,000

199,738.00

402,000

50%

100%

50,000

16,667

50,000

30,000.00

30,000

60%

60%

100,000

33,333

100,000

19,637.00

80,637

20%

81%

614,000

204,667

614,000

227,000.00

614,000

37%

100% *

Pioduran

137,000

45,667

137,000

57,000.00

137,000

42%

100%

Bacacay Rapu-Rapu

47,500 29,000

15,833 9,667

47,500 29,000

47,500.00 29,000.00

47,500 29,000

100% 100%

100% 100%

Capalonga

207,000

69,000

207,000

207,000

0%

100%

Panganiban

193,500

64,500

193,500

93,500

193,500

48%

100%

Total

700,000

233,333

700,000

280,925.00

538,225

40%

77%

Albay

124,000

41,333

124,000

124,000

124,000

100%

100%

45,000 79,000

15,000 26,333

45,000 79,000

45,000 79,000

45,000 79,000

100% 100%

100% 100%

503,000 143,500

167,667 47,833

503,000 143,500

156,925.00 143,500.00

341,225 143,500

31% 100%

68% 100%

Albay Legazpi City Bacacay

Cam. Norte Daet

Cam. Sur Iriga Iraya, Ipil & Sta. Cruz, Buhi Masbate Mobo Masbate Coffee (500/ha)

Total

(from seeds) Albay Guinobatan Legazpi City

Cam. Norte Daet Catanduanes

Cacao (500/ha)

Legazpi City Bacacay Rapu-Rapu Cam. Sur Sipocot

MFO 2

Hubo, Pasacao

Page 2 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Location (Municipality/ District)

Province

TARGET

ACCOMPLISHMENT

Annual

This Month

Jan-June

Remarks

PERCENTAGE

To Date This Month

359,500 132,000 227,500

73,000

24,333

73,000

593,000

197,667

593,000

205,000.00

608,000

35%

103% *

Oas

215,500

71,833

215,500

115,000.00

215,500

53%

100%

San Lorenzo Ruiz

100,000 77,500

33,333 25,833

100,000 77,500

177,500

0%

100%

Harubay, Comaguingking & Lungsad, Calabanga 150,000

50,000

150,000

165,000

60%

110%

50,000

16,667

50,000

50,000

0%

100%

2,565,200

855,067

2,565,200

1,162,339.00

2,224,083

45%

717,200 22,600 66,400 100,600 20,000 45,000 64,000 36,600 60,000 180,200 121,800

239,067 7,533 22,133 33,533 6,667 15,000 21,333 12,200 20,000 180,200 121,800

717,200 22,600 66,400 100,600 20,000 45,000 64,000 36,600 60,000 180,200 121,800

617,723 18,080 53,120 80,480 16,000 45,000 53,027 25,600 25,772 126,140

617,723 18,080 53,120 80,480 16,000 45,000 53,027 25,600 25,772 126,140

86% 80% 80% 80% 80% 100% 83% 70% 43% 70%

42,400

14,133

42,400

21,400.00

42,400

50%

100% *

31,000

10,333

31,000

10,000.00

31,000

32%

100%

Sipaco 7 Himanag, North Lagonoy

16%

To Date

119,833 44,000 75,833

Bahi & Ason, Garchitorena

197,725

This Month

359,500 132,000 227,500

Goa

56,565

To Date

55%

Catanduanes Virac Rattan (500/ha)

Panganiban

Total

73,000

100%

Albay Guinobatan Cam Norte Daet Basud Cam Sur Naga

90,000.00

Catanduanes Virac Fruit (200/ha)

Bagamanoc

Total

87% *

(Pili) Region Pioduran Capalonga & Labo Capalonga Mercedes Pasacao Caramoran Garchitorena Presentacion Pilar Libmanan Albay

86% 80% 80% 80% 80% 100% 83% 70% 43% 70%

Guinobatan Pioduran

MFO 2

Page 3 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Jan-June

Remarks

PERCENTAGE

To Date This Month

To Date

This Month

To Date

Legazpi City Rapu-Rapu Cam. Norte

11,400

3,800

11,400

338,400

112,800

110,400 48,000 70,000 40,000 70,000

11,400.00

11,400

100%

100%

338,400

338,400

0%

100%

36,800 16,000 23,333 13,333 23,333

110,400 48,000 70,000 40,000 70,000

110,400 48,000 70,000 40,000 70,000

213,200

71,067

213,200

210,056.00

196,200

99%

92%

40,000 17,000

13,333 5,667

40,000 17,000

48,000.00

57,000

84%

100%

68,200 43,000

22,733 14,333

68,200 43,000

70,056.00

111,200

63%

100%

45,000

15,000

45,000

28,000.00

28,000

62%

62%

27,800

9,267

27,800

27,800

0%

100%

27,800

9,267

27,800

27,800

0%

100%

189,000

63,000

189,000

89,600.00

132,700

47%

70%

40,000 20,000 14,600

13,333 6,667 4,867

40,000 20,000 14,600

10,000.00 2,100.00 3,500.00

30,200 15,800 12,700

25% 11% 24%

76% 79% 87%

79,000 35,400

26,333 11,800

79,000 35,400

74,000.00

74,000

65%

65%

Daet Labo Labo Basud Sta Elena Mercedes Cam. Sur

100% 100% 100% 100% 100%

Sipocot Panaytanayan, Ragay Bagong Silang, Pasacao Goa Sipaco, North, Labonoy Pinitan & Homestead, Siruma Iriga Iraya, Ipil, & Sta. Cruz, Buhi Catanduanes Virac San Miguel Masbate Mobo Igang & Biyong, Mobo Igang & Biyong, Mobo Madao & bonifacio, Uson San Jacinto San Pascual Claveria

MFO 2

Page 4 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Jan-June

This Month

1,037,200

345,733

1,037,200

128,800

42,933

128,800

27,867 11,933 19,333 41,400 16,400 60,800

83,600 35,800 58,000 124,200 49,200 182,400

62,700.00

San Jose/Abas/Mabanate

83,600 35,800 58,000 124,200 49,200 182,400

Dapdap/Pangpang/

108,400

36,133

108,400

43,360.00

197,200

65,733

43,600 26,000

Sorsogon

Remarks

PERCENTAGE

To Date

149,560.00

To Date

This Month

To Date

868,860.00

14%

84%

141,680

0%

110%

83,600 39,380 58,000 62,100 49,200 200,640

75% 0% 75% 0% 0% 0%

100% 110% 100% 50% 100% 110%

108,400

40%

100%

197,200

49,300

0%

25%

14,533 8,667

43,600 26,000

47,960 28,600

0% 0%

110% 110%

227,500

75,833

227,500

227,500

75,833

227,500

Sorsogon Pilar Dapdap/Pangpang/ Palanas Rafael/Pineda/palanas Ginablan Malbog/Palanas/Calpi Malbog/Calpi Inapugan

43,500.00

Palanas/Lungib Ginablan/Inang/Sacnangan Irosin Sta. Magdalena

PA-Terrestrial (500/ha)

Total Catanduanes Virac

b. SOCMOB

area planted (ha.)

Total Region Albay Cam. Norte Cam. Sur Catanduanes Masbate Sorsogon

b.1 Site preparation including

area planted (ha.)

Total

Timber (500/ha)

Total

227,500

18,956 3,791 1,666 2,863 3,178 1,227 1,045 5,186

58.00

58

18,956

hauling, hole digging, etc.

MFO 2

961

Page 5 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Region

Location (Municipality/ District) Libmanan

Panaytanayan & Nuevo, Ragay Dalupaon, Tilnac & San Antonio, Pasacao Tinalmud Nuevo, Cambalido & Cawayan, Libmanan

Fuelwood (1000/ha)

ACCOMPLISHMENT PERCENTAGE

To Date Annual

This Month

Jan-June

This Month

To Date

This Month

Remarks

To Date

205 756

Cam. Sur Sipocot

TARGET

259 181

316

900

Total Albay Legazpi City Rapu-Rapu

211 137

Sta. Elena

402

Bacacay

5 8

5 8

6 6

6 6

Cam. Norte Daet

Cam. Sur Iriga Iraya, Ipil & Sta. Cruz, Buhi

50

Masbate Mobo Masbate

Coffee (500/ha)

100

1,228

Total Albay Guinobatan

Pioduran

274

Bacacay

95 58

Legazpi City Rapu-Rapu Cam. Norte

MFO 2

Page 6 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Location (Municipality/ District)

Province

Daet

TARGET

ACCOMPLISHMENT PERCENTAGE

To Date Annual

This Month

Capalonga

414

Panganiban

387

Jan-June

This Month

To Date

This Month

Remarks

To Date

Catanduanes

Cacao (500/ha)

Total

1,400

Albay

248

Legazpi City Bacacay Rapu-Rapu Cam. Sur Sipocot Goa

Hubo, Pasacao

90 158

8

1,006 287

Sipaco 7 Himanag, North Lagonoy

264 455

Panganiban

146

Bahi & Ason, Garchitorena

8

Catanduanes Virac

Rattan (500/ha)

1,186

Total Albay Guinobatan

Oas

431

San Lorenzo Ruiz

200 155

Cam Norte Daet Basud Cam Sur Naga Harubay, Comaguingking & Lungsad, Calabanga 300 Catanduanes Virac

Fruit (200/ha)

MFO 2

Total

Bagamanoc

100

12,826

Page 7 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

Region Pioduran Capalonga & Labo Capalonga Mercedes Pasacao Caramoran Garchitorena Presentacion Pilar

TARGET

ACCOMPLISHMENT PERCENTAGE

To Date Annual

This Month

Jan-June

This Month

To Date

This Month

Remarks

To Date

3,586 113 332 503 100 225 320 183 300 1,510 212

Albay Guinobatan Pioduran

155

Legazpi City Rapu-Rapu

57

25

25

1,692

Cam. Norte Daet Labo Labo Basud Sta Elena Mercedes

552 240 350 200 350 1,066

Cam. Sur Sipocot Panaytanayan, Ragay Bagong Silang, Pasacao

200 85

Goa Sipaco, North, Labonoy Pinitan & Homestead, Siruma

341 215

Iriga Iraya, Ipil, & Sta. Cruz, Buhi

225 139

Catanduanes Virac San Miguel

MFO 2

139 Page 8 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date Jan-June

This Month

To Date

This Month

To Date

945

Masbate Mobo Igang & Biyong, Mobo Igang & Biyong, Mobo Madao & bonifacio, Uson San Jacinto San Pascual Claveria

200 100 73 395 177

395 177

395 177

395 177

395 177

100% 100%

100% 100%

66,052.00

47,096

47,096

29,111.00

47,096.00

62%

71%

3,791 6,319 9,580 14,042

4,653 6,717 10,864

4,653 6,717 10,864

4,653

4,653 6,717 10,864

100%

74% 70% 77%

5,186

Sorsogon Sorsogon Pilar Dapdap/Pangpang/

644

Palanas Rafael/Pineda/palanas Ginablan Malbog/Palanas/Calpi Malbog/Calpi Inapugan San Jose/Abas/Mabanate Dapdap/Pangpang/

418 179 290 621 246 912 542

Palanas/Lungib Ginablan/Inang/Sacnangan

986

Irosin

218 130

Sta. Magdalena PA-Terrestrial (500/ha)

455

Total Catanduanes Virac

c. Maintenance and Protection of established plantations

area maintained and

Total

455

protected Region Albay Cam. Norte Cam. Sur

MFO 2

San Andres

Page 9 of 45

10,864

100%

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date Jan-June

This Month

25,284

25,284

25,284

25,284

100%

Total

22,096

22,096

22,096

22,095.70

100%

Albay

2,300 1,700 13 59

2,300 1,700 13 59

2,300 1,700 13 59

2,300 1,700 13 59

2,300 1,700 13 59

100% 100% 100% 100%

100% 100% 100% 100%

1,170 158 109 190.70

1,170 158 109 191

1,170 158 109 191

1,170 158 109 191

1,170 158 109 190.70

100% 100% 100% 100%

100% 100% 100% 100%

600 400 200

600 400 200

600 400 200

600 400 200

600 400 200

100% 100% 100%

100% 100% 100%

2,542 1,000 400 104 104 50 450 384 50

2,542 1,000 400 104 104 50 450 384 50

2,542 1,000 400 104 104 50 450 384 50

2,542 1,000 400 104 104 50 450 384 50

2,542 1,000 400 104 104 50 450 384 50

100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100%

5,137 702 300 179 123 100

5,137 702 300 179 123 100

5,137 702 300 179 123 100

5,137 702 300 179 123 100

5,137 702 300 179 123 100

100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100%

Year 3

Legazpi Malinao Tabaco City/

6,352

100%

To Date

7,242 11,268 6,352

Sorsogon

7,242 11,268 6,352

This Month

7,242 11,268 6,352

Masbate

7,242

To Date

8,469 12,313 11,538

Catanduanes

NGP CY 2013

TARGET

100%

86% 92% 55%

Sto. Domingo Rapu-Rapu Daraga Legazpi City Manito Guinobatan Oas Libon

Cam. Norte Capalonga Labo Paracale Jose Panganiban Sta. Elena Basud Mercedes San Lorenzo Ruiz

Cam. Sur Sipocot Ragay Sipocot Pasacao Minalabac

MFO 2

Page 10 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Location (Municipality/ District)

Province

Naga Pili Calabanga Goa Caramoan Garchitorena Siruma Tinambac Lagonoy Presentacion Iriga Balatan Bula Buhi, Nabua, Iriga Bato

Catanduanes

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date Jan-June

This Month

To Date

This Month

To Date

142 50 92

142 50 92

142 50 92

142 50 92

142 50 92

100% 100% 100%

100% 100% 100%

3,643 206 750 200 400 1,387 700

3,643 206 750 200 400 1,387 700

3,643 206 750 200 400 1,387 700

3643 206 750 200 400 1,387 700

3643 206 750 200 400 1,387 700

100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100%

650 109 350 91 100

650 109 350 91 100

650 109 350 91 100

650 109 350 91 100

650 109 350 91 100

100% 100% 100% 100% 100%

100% 100% 100% 100% 100%

3,807

3,807

3,807

3,807

3,807

100%

100%

541 123 68 128 1,018 4 50 1,276 550 50

541 123 68 128 1,018 4 50 1,276 550 50

541 123 68 128 1,018 4 50 1,276 550 50

541 123 68 128 1,018 4 50 1,276 550 50

541 123 68 128 1,018 4 50 1,276 550 50

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 114% 100% 100% 100% 100%

4,981

4,981

4,981

4,981

4,981

100%

100%

1,487 800 687

1,487 800 687

1,487 800 687

1,487 800 687

1,487 800 687

100% 100% 100%

100% 100% 100%

3,494.00 1,600.00 700.00

3,494 1,600 700

3,494 1,600 700

3,494.00 1,600.00 700.00

3,494.00 1,600.00 700.00

100% 100% 100%

100% 100% 100%

Virac Virac San Miguel Viga Baras San Andres Gigmoto Panganiban Pandan Caramoran Bagamanoc Masbate San Jacinto Monreal San Pascual Mobo Aroroy Mobo

MFO 2

Page 11 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

110.76 88.68 500.00 458.15 36.41

110.76 88.68 500 458 36

110.76 88.68 500 458 36

110.76 88.68 500.00 458.15 36.41

110.76 88.68 500.00 458.15 36.41

100% 100% 100% 100% 101%

100% 100% 100% 100% 100%

3,329

3,329

3,329

3,329

3,329

100%

100%

782 51 50 78 246 200 72 60 1,790

782 51 50 78 246 200 72 60 1,790

782 51 50 78 246 200 72 60 1,790

782 51 50 78 246 200 72 60 1,790

782 51 50 78 246 200 72 60 1,790

100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100%

1,035

1,035

1,035

Juban

315

315

315

315

315

100%

100%

Monreal

650 70

650 70

650 70

650 70

650 70

100% 100%

100% 100%

263

263

263

263

263

100%

100%

69 49

69 49

69 49

69 49

69 49

100% 100%

100% 100%

145

145

145

145

145

100%

100%

120

120

120

20

20

20

Masbate City Mandaon Uson Cataingan Placer Sorsogon Sorsogon Castilla Casiguran Sorsogon City Pilar Juban Irosin Bulan Barcelona Matnog

Soil Conservation

Total

100% *

1,035

and Watershed Mgt. Sorsogon

Masbate San Fernando

BUB

Total Sorsogon Pilar Juban Masbate Mandaon

CBFM-Fuelwood

Total Albay

MFO 2

Rapu-Rapu

Page 12 of 45

100% *

120 20

20

100%

100% January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

CSO-PO

Location (Municipality/ District)

Province

Annual

This Month

Remarks

PERCENTAGE This Month

Jan-June

To Date

1650

1,650

1,650

650 50 400 200

650 50 400 200

650 50 400 200

650 50 400 200

650 50 400 200

100% 100% 100% 100%

100% 100% 100% 100%

500 200 50 50 200

500 200 50 50 200

500 200 50 50 200

500 200 50 50 200

500 200 50 50 200

100% 100% 100% 100% 100%

100% 100% 100% 100% 100%

150 10 140

150 10 140

150 10 140

150 10 140

150 10 140

100% 100% 100%

100% 100% 100%

350 250 100

350 250 100

350 250 100

350 250 100

350 250 100

100% 100% 100%

100% 100% 100%

120

120

120

120

120

100%

100%

21,812

21,812

21,812

21,812

100%

Total

20,499

20,499

20,499

20,499

100%

Albay

2,115

2,115

2,115

2,115

2,115

100%

100%

999 228

999 228

999 228

999 228

999 228

100% 100%

100% 100%

Catanduanes

Viga

Masbate

Aroroy

Sorsogon

Bulan

Total

Labo Mercedes Cam. Sur Haguimit, Lupi Sigamot, Libmanan Bagong Silang, Del Gallego Lupi & Cawayan, Tinambac Masbate Esperanza Mandaon Sorsogon Castilla Bulusan

20 20 20 20 20

100% 100% 100% 100% 100%

To Date

20 20 20 20 20

La Victoria, Bula

20 20 20 20 20

This Month

20 20 20 20 20

Labo

Cam. Sur

Capalonga

100% 100% 100% 100% 100% 100% *

1650

Albay Oas

Year 2 NGP CY 2014

ACCOMPLISHMENT To Date

20 20 20 20 20

Cam. Norte

Cam. Norte

SUC. Clonal

TARGET

Guinobatan Ligao Oas

MFO 2

Page 13 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

Legazpi

888

888

888

888

888

100%

100%

3375

3,375

3,375

3375

3375

100%

100%

2,370 219 417 351 18

2,370 219 417 351 18

2,370 219 417 351 18

2,370 219 417 351 18

2,370 219 417 351 18

100% 100% 100% 100% 100%

100% 100% 100% 100% 100%

4,925 1,949 404 300 1,245

4,925 1,949 404 300 1,245

4,925 1,949 404 300 1,245

4925 1,949 404 300 1,245

4925 1,949 404 300 1,245

100% 100% 100% 100% 100%

100% 100% 100% 100% 100%

75

75

75

75

75

100%

100%

Tinambac

2401 126 100 825 750 200 400

2,401 126 100 825 750 200 400

2,401 126 100 825 750 200 400

2401 126 100 825 750 200 400

2401 126 100 825 750 200 400

100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100%

Buhi

500

500

500

500

500

100%

100%

3,385

3,385

3,385

3,385

3,385

100%

100%

1,052 149 2,184

1,052 149 2,184

1,052 149 2,184

1,052 149 2,184

1,052 149 2,184

100% 100% 100%

100% 100% 100%

4,499

4,499

4,499

4,499

4,499

100%

100%

800 302

800 302

800 302

800 302

800 302

100% 100%

100% 100%

Rapu-Rapu Cam. Norte Daet Capalonga/Labo Jose Panganiban Sta. Elena Mercedes Vinzons Cam. Sur Sipocot Ragay Libmanan Pasacao Naga

Ocampo/Pili/Calabanga/ Naga

Goa Goa Caramoan Garchitorena Lagonoy Presentacion

Iriga

Catanduanes Virac Virac San Andres Bagamanoc/Pandan Masbate San Jacinto San Pascual Claveria

MFO 2

Page 14 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Location (Municipality/ District)

Province

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

Mobo

1,472 75 800 1,050

1,472 75 800 1,050

1,472 75 800 1,050

1,472 75 800 1,125

1,472 75 800 1,125

100% 100% 100% 107%

100% 100% 100% 107%

2,200 1,221 979

2,200 1,221 979

2,200 1,221 979

2200 1,221 979

2200 1,221 979

100% 100% 100%

100% 100% 100%

753

753

753

753

753

100%

100%

303 450

303 450

303 450

303 450

303 450

100% 100%

100% 100%

140

140

140

Oas

40

40

40

40

40

100%

100%

Labo

30

30

30

30

30

100%

100%

Caramoan

50

50

50

50

50

100%

100%

Castilla

20

20

20

20

20

100%

100%

Total

120

120

120

Albay

58 30 32

58 30 32

58 30 32

300

300

300

Labo

100

100

100

100

100

100%

100%

Ragay

200

200

200

200

200

100%

100%

Aroroy Mobo Masbate City Uson Sorsogon Pilar Matnog Soil Conservation

Masbate

and Watershed Mgt. (CY 2013 Plantation, CBF)

San Jacinto Monreal

Betel Nut

Total

140

100%

Albay Guinobatan Cam. Norte Daet Cam. Sur Goa Sorsogon Sorsogon BUB

Catanduanes Cam. Sur Support to NGP (CSO)

Cabusao

Total

120 58 30 32

58 30 32

100% 100% 100% 100%

300

100% 100% 100% 100%

Cam. Norte Cam. Sur

MFO 2

Page 15 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Location (Municipality/ District)

Province

TARGET

ACCOMPLISHMENT PERCENTAGE

To Date Annual

This Month

Jan-June

This Month

To Date

This Month

Remarks

To Date

18,956

NGP CY 2015 (1 cycle PMEP) Timber

961

Total Region Libmanan

205 756

Cam. Sur Sipocot Panaytanayan & Nuevo, Ragay Dalupaon, Tilnac & San Antonio, Pasacao Tinalmud Nuevo, Cambalido & Cawayan, Libmanan Fuelwood (1000/ha)

259 181 316 900

Total Albay Legazpi City Rapu-Rapu

211 137

Sta. Elena

402

Malinao

Cam. Norte Daet

Cam. Sur Iriga Buhi

50

Masbate Mobo Masbate Coffee (500/ha)

100 1,228

Total Albay Guinobatan

Pioduran

Legazpi City

Bacacay Rapu-Rapu

MFO 2

274 95 58 Page 16 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Location (Municipality/ District)

Province

TARGET

ACCOMPLISHMENT PERCENTAGE

To Date Annual

This Month

Jan-June

This Month

To Date

This Month

Remarks

To Date

Cam. Norte Daet Capalonga

414

Panganiban

387

Catanduanes

Cacao (500/ha)

Total

1,400

Albay

248

Legazpi City Bacacay Rapu-Rapu Cam. Sur Sipocot Goa

Hubo, Pasacao

90 158 1,006 287

Sipaco 7 Himanag, North Lagonoy

264 455

Panganiban

146

Bahi & Ason, Garchitorena

Catanduanes Virac

Rattan (500/ha)

1,186

Total Albay Guinobatan

Oas

431

San Lorenzo Ruiz

200 155

Cam Norte Daet Basud Cam Sur Naga Harubay, Comaguingking & Lungsad, Calabanga 300 Catanduanes Virac

MFO 2

Bagamanoc

100

Page 17 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Fruit (200/ha)

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT PERCENTAGE

To Date Annual

This Month

Jan-June

This Month

To Date

This Month

Remarks

To Date

12,826

Total Region Pioduran Capalonga & Labo Capalonga Mercedes Pasacao Caramoran Garchitorena Presentacion Pilar

3,586 113 332 503 100 225 320 183 300 1,510 212

Albay Guinobatan Pioduran

155

Legazpi City Rapu-Rapu

57 1,692

9580 Cam. Norte Daet Labo Labo Basud Sta Elena Mercedes

552 240 350 200 350 1,066

Cam. Sur Sipocot Panaytanayan, Ragay Bagong Silang, Pasacao

200 85

Goa Sipaco, North, Labonoy Pinitan & Homestead, Siruma

341 215

Iriga Iraya, Ipil, & Sta. Cruz, Buhi

MFO 2

225

Page 18 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT PERCENTAGE

To Date Annual

This Month

Jan-June

This Month

To Date

This Month

Remarks

To Date

139

Catanduanes Virac San Miguel

139 945

Masbate Mobo Igang & Biyong, Mobo Igang & Biyong, Mobo Madao & bonifacio, Uson

200 100 73

San Jacinto San Pascual Claveria

395 177 5,186

Sorsogon Sorsogon Pilar Dapdap/Pangpang/

644

Palanas Rafael/Pineda/palanas Ginablan Malbog/Palanas/Calpi Malbog/Calpi Inapugan San Jose/Abas/Mabanate Dapdap/Pangpang/

418 179 290 621 246 912 542

Palanas/Lungib Ginablan/Inang/Sacnangan Irosin Sta. Magdalena PA-Terrestrial (500/ha)

986 218 130 455

Total Catanduanes Virac

1.2 NGP - Grassroots Participatory Budgeting (GPB)

MFO 2

area planted seedlings produced

Total

San Andres

455

2689.5 2,201,250.00

733,750

Page 19 of 45

2,201,250.00 January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

Albay Cam. Norte Cam. Sur Catanduanes Masbate Sorsogon

nursery established (no.)

Guinobatan

Pio Duran

seedlings produced (no.) nursery established (no.)

Climate Change Adaptation

area planted (ha) and

Nursery

seedlings produced (no.)

3. Tree Planting along river banks - Riparian Buffer Zone (Disaster Mitigation)

This Month

Remarks

PERCENTAGE This Month

Jan-June

To Date

This Month

To Date

167,333

502,000.00

52,667

158,000.00

33,000

33,000

21%

21%

109,933

329,800.00

182,900

182,900

55%

55%

56,867

170,600.00

48,500

145,500.00

145,000

145,000

100%

100%

138,417

415,250.00

154,033

462,100.00

Legazpi

Sto. Domingo

1 125 125000

1

1

1

100%

100%

1 41,667

125000

1 33 33,000

1,100

33,000

33,000

33,000

100%

100%

42 8,400

2,800

8,400

9,900

9,900

118%

118%

40 100,000

33,333

100,000

20 50,000

20 50,000

50%

50% 50%

50 25,000

8,333

25,000

27,500

27,500

110%

110%

50 10,000

3,333

10,000

11,500

11,500

115%

115%

Cam Norte area developed (ha.)

Daet

Capalonga

seedlings produced (no.)

4. Mangrove Reforestation

Cam Norte

Project (in support of fish

area developed (ha.)

sanctuary)

seedlings produced (no.)

5. Tree Planting Project (Rubber Tree)

Annual

Albay

area planted (ha) and

2. Establishment of Municipal

ACCOMPLISHMENT To Date

208.00 502,000.00 158.00 158,000.00 505.00 329,800.00 714.00 170,600.00 91.00 145,500.00 332.50 415,250.00 681.00 462,100.00

Region

1. National Greening Program

TARGET

Daet

Capalonga

Cam Norte area developed (ha.)

Daet

Capalonga

seedlings produced (no.) 6. Massive Reforestation

Cam Norte

Programs such as hard

area developed (ha.)

trees, fruit bearing trees,

seedlings produced (no.)

Daet

Jose Panganiban

and bamboo

MFO 2

Page 20 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

7. National Greening Program (Agroforestry Project)

Performance Indicator

Province

Location (Municipality/ District)

ACCOMPLISHMENT

Annual

This Month

Jan-June

Remarks

PERCENTAGE

To Date This Month

To Date

This Month

To Date

Cam Norte area developed (ha.)

Daet

Mercedes

seedlings produced (no.) 8. National Greening Program (Agroforestry Project)

TARGET

117 23,400

7,800

23,400

18,000

18,000

77%

77%

84 16,800

5,600

16,800

6,000

6,000

36%

36%

50 25,000

8,333

25,000

28 11,200

3,733

11,200

44 110,000

36,667

110,000

22 60,000

22 60,000

55%

50% 55%

70 35,000

11,667

35,000

36 7,200

2,400

7,200

2,000

6,000

2,533

7,600

3,200

9,600

Cam Norte area developed (ha.)

Daet

Mercedes

seedlings produced (no.) 9. National Greening Program

Cam Norte

(Reforestation of upland

area developed (ha.)

areas program and

seedlings produced (no.)

Daet

San Lorenzo Ruiz

maintenance) 10. National Greening Program

Cam Norte area developed (ha.)

Daet

San Lorenzo Ruiz

seedlings produced (no.)

11. Mangrove Rehabilitation

Cam Norte area developed (ha.)

Daet

Vinzons

seedlings produced (no.) 12. Establishment of Nursery Forest Tree Species Mahogany and Narra

nursery established (no.) area planted (ha) and

13. River bank Stabilization

area developed (ha.)

Cam. Sur

seedlings produced (no.)

Sipocot

roadside tree park established (ha)

Cam. Sur

14. Establishment of Roadside Tree Park (NGP)

Sipocot

Naga

Gainza

Magarao

Cam. Sur

cum City of Trees

area developed (ha.)

Development

seedlings produced (no.)

16. Naga Riverbank

Naga

Naga City

15 6,000 19 7,600

Cam. Sur area developed (ha.) seedlings produced (no.)

MFO 2

Sipocot

seedlings produced (no.)

15. National Greening Program

Rehabilitation Project

Cam Sur

Naga

Naga City

48 9,600

Page 21 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

area developed (ha.)

Iriga

Baao

seedlings produced (no.) 18. National Greening Program (Fruit trees)

19. National Greening Program:

Iriga

Balatan

20. National Greening Program

Iriga

Bula

Virac

Virac

seedlings produced (no.)

22. Watershed within Municipal

Virac

Baras

23. Upland Reforestation Project/

Mobo

Ilaya, Balud

24. Reforestation of Mangrove

Mobo

Libtong, Cataingan

25. National Greening Program

Mobo

Masbate City

San Jacinto

San Pascual

seedlings produced (no.)

20,000

60,000

200 40,000

13,333

40,000

26 5,200

1,733

5,200

41 20,500

6,833

20,500

20,500

20,500

100%

100%

50 125,000

41,667

125,000

125,000

125,000

100%

100%

50 25,000

8,333

25,000

100 50,000

16,667

50,000

58 29,000

9,667

29,000

124.50 311,250

103,750

311,250

58 11,600

3,867

11,600

Sorsogon area developed (ha.) seedlings produced (no.)

MFO 2

300 60,000

Masbate area developed (ha.)

26. Fruit Brearing Tree Plantation Agroforestry

To Date

Masbate area developed (ha.) seedlings produced (no.)

Areas

This Month

Masbate area developed (ha.) seedlings produced (no.)

Rehabilitation of Mangrove

To Date

Masbate area developed (ha.) seedlings produced (no.)

and Watershed Forests

Jan-June

Remarks

PERCENTAGE This Month

Catanduanes area developed (ha.) seedlings produced (no.)

Greening Program

This Month

Catanduanes area developed (ha.)

Water System Source

Annual

Cam. Sur area developed (ha.) seedlings produced (no.)

21. Reforestation (mangrove/nipa/Caragumoy)

ACCOMPLISHMENT To Date

Cam. Sur area developed (ha.) seedlings produced (no.)

Forest Land & Riverbanks

TARGET

Cam. Sur

17. National Greening Program (Agroforestry)

Province

Location (Municipality/ District)

Sorsogon

Pilar

Page 22 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

27. National Greening Program Upland Reforestation

Province

Location (Municipality/ District)

ACCOMPLISHMENT PERCENTAGE

To Date Annual

This Month

Jan-June

This Month

To Date

This Month

Remarks

To Date

Sorsogon area developed (ha.)

Sorsogon

Matnog

seedlings produced (no.) 28. National Greening Program

46 23,000

7,667

23,000

50 25,000

8,333

25,000

90 45,000

15,000

45,000

80 40,000

13,333

40,000

50 10,000

3,333

10,000

40 100,000

33,333

100,000

67 167,500

55,833

167,500

200 40,000

13,333

40,000

48 120,000

40,000

120,000

120 300,000

100,000

300,000

Sorsogon

Upland and Mangrove

area developed (ha.)

Reforestation

seedlings produced (no.)

29. Reforestation Program

Sorsogon

Bulusan

Sorsogon area developed (ha.)

Sorsogon

Donsol

seedlings produced (no.) 30. Upland Reforestation

Sorsogon area developed (ha.)

Sorsogon

Irosin

seedlings produced (no.) 31. National Greening Program Agrofrestry

TARGET

Sorsogon area developed (ha.)

Sorsogon

Magallanes

seedlings produced (no.) 32. Mangrove Reforestation

Sorsogon area developed (ha.)

Sorsogon

Casiguran

seedlings produced (no.) 33. Mangrove Reforestation

Sorsogon area developed (ha.)

Sorsogon

Sorsogon City

seedlings produced (no.) 34. Riverbank Stabilization

Sorsogon area developed (ha.)

Sorsogon

Sorsogon City

seedlings produced (no.) 35. Mangrove Reforestation

Region

Pasacao, Cam. Sur

area developed (ha.) seedlings produced (no.) 36. National Greening Program (Mangrove Planting)

Region area developed (ha.)

Siruma, Cam. Sur

seedlings produced (no.)

MFO 2

Page 23 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

TARGET

ACCOMPLISHMENT

Annual

This Month

This Month

Jan-June

33,333

100,000

76,500 14,500 14,500 14,500

25,500 4,833 4,833 4,833

76,500 14,500 14,500 14,500

83,400

27,800

83,400

85%

165

Region Albay

Pilar, Sorsogon

area developed (ha.)

Remarks

PERCENTAGE

To Date

40 100,000

Region

37. Mangrove Reforestation

Location (Municipality/ District)

To Date

This Month

To Date

seedlings produced (no.) 3. Establishment of Forest

seedlings produced

Nurseries

Total

76,500 14,500 14,500 14,500

76,500 14,500 14,500 14,500

100% 100% 100% 100%

100% 100% 100% 100%

85%

85%

85%

100%

100%

165

165

165

165

100%

100%

26

26

26

26

26

100%

100%

15 6 9

15 6 9

15 6 9

15 6 9

15 6 9

100% 100% 100%

100% 100% 100%

Daet

23

23

23

23

23

100%

100%

Cam. Sur

34 4 9 2 15 4

34 4 9 2 15 4

34 4 9 2 15 4

40 4 9 2 21 4

40 4 9 2 21 4

118% 100% 100% 100% 140% 100%

118% 100% 100% 100% 140% 100%

18

18

18

18

18

100%

100%

Albay

Guinobatan (SUC) Jovellar Polangui Libon

seedlings produced

Masbate Mobo

4. Survival Rate

percent survival

Total Albay Cam. Norte Cam. Sur Catanduanes Masbate Sorsogon

5. Hiring of Extension Officers

EO hired (no.)

Total

Guinobatan Legazpi

Masbate City

85% 85% 85% 85% 85% 85% 85%

Cam. Norte

PENRO Sipocot Naga Goa Iriga Catanduanes Virac

MFO 2

Page 24 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

Masbate Mobo San Jacinto

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

23 15 8

23 15 8

23 15 8

23 15 8

23 15 8

100% 100%

100% 100%

26

26

26

26

26

100%

100%

Sorsogon Sorsogon Quinali "A" Watershed Rehabilitation Project (MVNP) 1. Establishment of vegetative measures (bio-engineering) a. Survey, Mapping and Planning

area surveyed and

Region

mapped (ha.)

Albay Guinobatan Ligao

b. Seedling Production

seedlings produced (no.)

Region

- Fuelwood

Guinobatan Ligao

- Timber

Guinobatan Ligao

= Site Preparation

site prepared (ha.) - Fuelwood

Guinobatan Ligao

- Timber

Guinobatan Ligao

= IEC/transportation/ Mobilization

area planted (ha.) - Fuelwood

Guinobatan Ligao

- Timber

Guinobatan Ligao

= Protection and Maintenance

area protected and maintained (ha.)

Region

Albay Guinobatan Ligao

MFO 2

250 150 100 150,000 30,000 20,000 60,000 40,000

250 150 100 50,000 10,000 6,667 20,000 13,333

150,000 30,000 20,000 60,000 40,000

250 150 100 150,000 30,000 20,000 60,000 40,000

150,000 30,000 20,000 60,000 40,000

100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100%

250 30 20 120 80 250 30 20 120 80

250 150 100 Page 25 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

2. Establishment of Structural Measures

3. Project Monitoring and Evaluation

Performance Indicator

gabion checkdam

Province

Region

Location (Municipality/ District)

Ligao

TARGET

ACCOMPLISHMENT

Annual

This Month

460

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date for awarding

460

constructed

monitoring and evaluation

4

1

2

1

2

4,150

413

1,653

600

1,747

42%

4,150

413

1,653

600

1,747

42%

4,150

413

1,653

600

36%

42%

Provincewide

750

77

282

130

46%

38%

Daet, Talisay, Sta. Elena

450

33

150

40

1,747 354,357 282 63,474 82 15,913 675 70,002 150 27,518 354 204 177,450

27%

18%

25%

46%

27%

40%

33%

51%

71%

51%

Region

50%

50%

conducted

A.03.c Land Survey, Disposition and Records Management 1. Land Disposition/Distribution a. Residential (disposed under

Total

RA 10023 or residential Free Patent

patent issued (no.)

Region

LMD

reviewed monitored and supervised patents issued (no.) (ha.)

Total (no.) Total (ha.) Albay (ha.) Cam. Norte (ha.) Cam. Sur

Provincewide

1,475

142

536

135

(ha.) Catanduanes

Provincewide

375

35

135

37

Provincewide

700

75

350

116

Provincewide

400

50

200

142

4,150

413

1,653

600

1,747

36%

42%

375 375

39 39

141 141

78 52

141 141

55% 37%

38% 38%

(ha.) Masbate (ha.) Sorsogon (ha.)

applications processed

Total

with final action and

MFO 2

endorsed to PENRO

Legazpi City /AlbayProvincewide

(no.) (ha.)

Guinobatan/ Albay Provincewide

Page 26 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Location (Municipality/ District)

Province

Daet/ CamNorte Daet, Talisay, Sta. Elena

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

450

33

150

40

82

27%

18%

350

33

123

42

182

34%

52%

400

42

150

49

150

33%

38%

350

33

123

5

154

4%

44%

375 375 450 250 400

35 35 25 50 50

140 135 250 100 200

39 37 70 46 142

189 150 254 100 204

28% 27% 28% 46% 71%

50% 40% 56% 40% 51%

13

1

4

5

7

125%

54%

13

1

4

5

7

125%

54%

Total

13

1

4

5

7

125%

54%

Albay

2 5 1 3 2

1

3

3

5

100%

100%

1

1 1

1 1

100%

33% 50%

4

5

7

125%

54%

Sipocot/ CamSur

Pasacao, Minalabac, Del Gallego, Lupi, Ragay, Libmanan, San Fernando

Naga City/Csur

Queborac, Naga and Canaman Presentacion, Goa, Goa/ CamSur Caramoan, Lagonoy, Garchitorena, Siruma, Tinambac Iriga City/ CamSur Nabua, Iriga, Baao Virac/ CatanduanesProvincewide Mobo/ Masbate

Provincewide

San Jacinto/ Sorsogon Provincewide Sorsogon City/ Sorsogon Provincewide

b. Other Patents Issuances

TARGET

patent issued (no.)(ha.)

Total

patents with CSW reviewed

Region

(MSA, Sales Applications) = Residential (areas disposed under CA 141) = Commercial/Industrial

LMD

and order of approval prepared (no.) patent issued (no.)(ha.)

Cam. Sur Catanduanes

Provincewide

Masbate Sorsogon

applications processed

Total

13

with final action endorsed to PENRO (no.)(ha.)

Legazpi City/ Albay Guinobatan/ Albay Sipocot/ CamSur Naga City/ CamSur Goa/ CamSur Iriga City/ CamSur Virac/ CatanduanesProvincewide Mobo/ Masbate San Jacinto/ Masbate

MFO 2

1 1 2 1 1 1 1 2 1 Page 27 of 45

1

2

1 1

1

1

2 1 1 1 1

200% 100%

0% 0% 100% 100% 100% 100% 50%

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Location (Municipality/ District)

Province

TARGET

ACCOMPLISHMENT

Annual

This Month 2

Total

28

This Month

Jan-June

To Date

This Month

To Date

1

1

1

100%

50%

3

20

12

22

60%

79%

28

3

20

12

22

60%

79%

Total

28

3

20

12

22

60%

79%

with CSW forwarded

Albay

to Region

Cam. Sur

1 1

4 8 1 6 3

3 3

125% 62%

4 2

5 8 1 6 2

75% 38%

Sorsogon

4 13 2 6 3

67% 67%

100% 67%

Total

28

3

20

12

22

60%

79%

2 2 2 2 2 2 1 4 2 3

1 2 1

2 3 3

100% 150% 75%

1 1

3 2 1 4 2 2

50% 100% 50% 0% 50% 50%

c. Titling of sites for public or

Sorsogon City/ Sorsogon

Remarks

PERCENTAGE

To Date

Quasi-public uses draft special patent/

Region

LMD

proclamation reviewed and forwarded to LMB draft special patent/ proclamation prepared

Catanduanes Masbate

applications processed

1

with CSW action forwarded to PENRO

Legazpi City/ Albay

(no./ha)

Guinobatan/ Albay Sipocot/ CamSur Naga City/ CamSur Goa/ CamSur Iriga City/ CamSur Virac/ Catanduanes Mobo/ Masbate San Jacinto/ Masbate Sorsogon City/ Sorsogon

2 2 4 3 3 3 2 4 2 3

1

3 1 2

75% 50% 67%

100% 67% 50% 100% 100% 67%

3. Land Surveys a. Survey and Mapping of Foreshore Areas

foreshore area surveyed

Region

and mapped (ha.)

Cam. Norte Catanduanes Sorsogon

b. Survey of Residential Land

lots surveyed and

Approval of Surveys (IVAS)

MFO 2

lots verified and

4,000 600 1,000 2,400

0%

Region

Regionwide

1,500 495

167 50

1,000 300

84

1,409

94%

Region

Regionwide

4,500

500

2,500

989

3,490

78%

submitted for IVAS (no.) c. Inspection, Verification and

4,000 600 1,000 2,400

approved (no.)

Page 28 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

d. Hiring of Contractual

Performance Indicator

personnel hired (no.)

Location (Municipality/ District)

Province

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

3 2 1

1 1

3 2 1

3 2 1

3 2 1

100% 100% 100%

100% 100% 100%

21

2

9

2

10

22%

48%

21

2

9

2

10

22%

48%

Total

21

2

9

2

10

22%

48%

Albay

1

3 1

1

2 1

33%

50% 50%

Sorsogon

4 2 5 2 6 2

Total

21

2

Legazpi City/Albay

3 1 2 1 2 1 1 2 5 1 2

Region

Regionwide

Geodetic Engineer Mathematician 4. Resolution of Land Cases cases reviewed and

TARGET

Region

LMD

forwarded to Legal Division cases resolved/settled amicably (no.) Cam. Norte Cam. Sur Catanduanes Masbate

land dispute/cases

1

1 3 1

1

9

1 3 3

100%

50% 50% 150%

50%

67%

8

investigated (no.) Guinobatan/Albay Daet/Camnorte Sipocot/CamSur Naga City/CamSur Goa/CamSur Iriga City/CamSur Virac/Catanduanes Mobo/Masbate San Jacinto/Masbate Sorsogon City/Sorsogon

2 1 1

1

2 1

1 2 1 1

2 1 1

1 5 1 3

50%

100% 100% 100%

50% 100% 100% 150%

4. LAMS Data Buildup a. Quality Assurance a.1 Validation of scanned images a.2 Validation of encoded data Documents

MFO 2

scanned images

Region

2,174,334

166,667

524,334

50

8,123

Region

458,427

50,000

150,000

600

323,738

validated (no. of sheets) encoded documents

71%

validated (no.)

Page 29 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

3. Data Verification and Correction

Performance Indicator

Digital Cadastral

Province

Region

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

5

1

2 2 4 1 2 2

1 2 2 1 1 1

To Date

This Month 2

To Date 40%

database cleansed/ corrected (no. of mun.)

4. Regular Monitoring and Assessment

Region Cam. Sur Masbate Sorsogon

GAD Mainstreamed Activities - GAD Database on NGP, Land

database on MFP

Disposition, Foreshore Mgt.

projects collated/analyzed

Albay

and PA Protection

- seedling production

Cam. Norte

beneficiaries - patent issuance

Cam. Sur Catanduanes

beneficiaries

Masbate

- foreshore lease

Sorsogon

1

1 2 2 1

50%

50% 100% 50% 100%

1

50%

occupants

CADASTRAL SURVEY CONTINUING ACTIVITY Completion of Remaining Cadastral Survey Projects

A.03.d

no. Of municipalities

Category A

12

1

12

100%

Category B

16

2

12

75%

Category C

4

2

4

100%

Management of Protected Areas, Wildlife, Coastal and Marine Resources/Areas

MFO 2

Page 30 of 45

January - June 2015

PHYSICAL CODE

A.03.d.1

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Jan-June

Remarks

PERCENTAGE

To Date This Month

To Date

This Month

To Date

Protected areas Development and Management 1. Management of Protected Areas a. PA Protection - Operationalization/

Total

60 55,579.47

15 55,579.47

30 55,579.47

27

45%

Region

60 55,579.47

15 55,579.47

30 55,579.47

27

45%

60 55,579.47 4.00 810

15 55,579.47 1 810

30 55,579.47 2 810

1 810

2 810

50% 100%

50% 100%

4 5,420

1 5,420

2 5,420

1 5,420

2 5,420

50% 100%

50% 100%

4 5,201

1 5,201

2 5,201

1 5,201

2 5,201

50% 100%

50% 100%

16 12,522

4 12,522

8 12,522

4 12,522

8 12,522

50% 100%

50% 100%

Strengthening of PAMB approved PAMB resolution adopting the recommended action/s endorsed to BMB - no. of resolutions - name of PAs - area coverage/PA (ha.) recommended actions forwarded to PAMB with report submitted to RO

Albay

- name of PAs

MMWFR Guinobatan

- area coverage/PA (ha.) Cam. Norte AMMNBA (Labo,San Lorenzo Ruiz & SanVicente) BNP (Basud and Daet, Cam.Norte; Sipocot & Lupi, CS) Cam. Sur LCNP, Libmanan BNP (CamSur side) MINP (Naga City, Calabanga,tinambac, Goa,Tigaon, Ocampo,Pili) CNP(Caramoan) LNBA Lagonoy

MFO 2

Page 31 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

Catanduanes CWFR(Virac,Bato,

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date Jan-June

This Month

To Date

This Month

To Date

4 26,010

1 26,010

2 26,010

1 26,010

2 26,010

50% 100%

50% 100%

4 244.72 4 1,305 4 7.77 4 107.98 4 247

1 244.72 1 1,305 1 7.77 1 107.98 1 247

2 244.72 2 1,305 2 7.77 2 107.98 2 247

1 244.75 1 1,305 1 7.77 1 107.98 1 247

2 244.75 2 1,305 2 7.77 2 107.98 2 247

50% 100% 50% 100% 50% 100% 50% 100% 50% 100%

50% 100% 50% 100% 50% 100% 50% 100% 50% 100%

4 3,672

1 3,672

2 3,672

1 3,672

2 3,672

50% 100%

50% 100%

4 1,032

1 1,032

2 1,032

1 1,032

2 1,032

50% 100%

50% 100%

44 54,912

11 54,912

22 54,912

4 810

1 810

2 810

1 810

2 810

50% 100%

50% 100%

4 5,420

1 5,420

2 5,420

1 5,420

2 5,420

50% 100%

50% 100%

4 5,201

1 5,201

2 5,201

1 5,201

2 5,201

50% 100%

50% 100%

SanMiguel,Pandan Calolbon,Baras) Masbate BongNP(Batuan) MTWFR (Monreal) CIWS (Cawayan) NIWS (Cawayan) TWFR (Mobo)

Sorsogon BVNP (Casiguran, Barcelona,Irosin and Juban) JMWFR Juban, Magallanes recommended actions

Total

forwarded to PAMB with report submitted to PENRO

Guinobatan

- name of PAs

MMWFR

- area coverage/PA (ha.)

Guinobatan Daet AMMNBA (Labo,San Lorenzo Ruiz & SanVicente) BNP (Basud and Daet, Cam.Norte; Sipocot & Lupi, CS)

MFO 2

Page 32 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date Jan-June

This Month

To Date

This Month

To Date

Sipocot

4 19 2 1,600

1 19 1 1,600

2 19 2 1,600

1 19 1 1,600

2 19 2 1,600

50% 100% 50% 100%

50% 100% 100% 100%

4 10,112

1 10,112

2 10,112

1 10,112

2 10,112

50% 100%

50% 100%

CNP(Caramoan)

4 347

1 347

2 347

1 347

2 347

50% 100%

50% 100%

LNBA

4 444

1 444

2 444

1 444

2 444

50% 100%

100% 100%

4 26,010

1 26,010

2 26,010

1 26,010

2 26,010

50% 100%

50% 100%

4 244.72 4 1,305 4 7.77 4 107.98 4 247

1 244.72 1 1,305 1 7.77 1 107.98 1 247

2 244.72 2 1,305 2 7.77 2 107.98 2 247

1 244.75 1 1,305 1 7.77 1 107.98 2 247

2 244.75 2 1,305 2 7.77 2 107.98 2 247

50% 100% 50% 100% 50% 100% 50% 100% 100% 100%

50% 100% 50% 100% 50% 100% 50% 100% 50% 100%

4 3,672

1 3,672

2 3,672

1 3672

2 3672

50% 100%

50% 100%

4 1,032

1 1,032

2 1,032

1 1032

2 1032

50% 100%

50% 100%

LCNP Libmanan BNP (CamSur side)

Naga

MINP (Naga City, Calabanga,tinambac, Goa,Tigaon, Ocampo,Pili)

Goa

Lagonoy Virac CWFR(Virac,Bato, SanMiguel,Pandan Calolbon,Baras) San Jacinto BongNP(Batuan) MTWFR CIWS NIWS TWFR (Mobo)

Sorsogon BVNP (Casiguran, Barcelona,Irosin and Juban) JMWFR Juban, Magallanes

MFO 2

Page 33 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

statistical report submitted Total Region Legazpi City Guinobatan Daet Sipocot Naga City Goa Iriga City Virac Mobo San Jacinto Sorsogon City - Implementation of Biodiversity

BMS implemented Total

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

48

4

24

10

24

42%

50%

4 4 4 4 4 4 4 4 4 4 4 4

1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 2 2 2 2

50% 50% 50% 50% 50% 50% 50% 50% 0% 50% 50% 0%

50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%

8

3

8

7

8

88%

100%

1 1

1 1

1 1

1 1

1 1

100% 100%

100% 100%

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1

1 1 1 1 1 1

100% 100% 100% 100% 100% 0%

100% 100% 100% 100% 100% 100%

27 4 6 1 12 1 3

27 4 6 1 12 1 3

27 4 6 1 12 1 3

26 4 6 1 12 3

27 4 6 1 12 1 3

96% 100% 100% 100% 100% 0% 100%

100% 100% 100% 100% 100% 100% 100%

89,400 11,000

7,366.67 833.33

45,200.00 6,000.00

3,710 3,110

73,216 4,880

8% 52%

82% 44%

1 1

Monitoring Systems (BMS) Daet BNP AMMNBA Sipocot

- Engaging biodiversity

no. of volunteers

green/blue brigades

Revenue collection

LCNP

Naga

MINP

Goa

LNBA

Virac

CWFR

San Jacinto

BongNP(Batuan)

Sorsogon

BVNP

Total Cam. Norte

BNP

Naga

MINP

Goa

LNBA

Virac

CWFR

San Jacinto

BongNP(Batuan)

Sorsogon

BVNP

Total Cam. Norte

BNP/AMMNBA

Cam Sur

MFO 2

Page 34 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

- Patrolling of Protected Area

Performance Indicator

no. of PA/area

Province

Location (Municipality/ District)

Sipocot

LCNP

Naga

MINP

Goa

CNP

Sorsogon

BVNP

Total

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date Jan-June

2,400 68,000 1,200 6,800

200.00 5,666.67 100.00 566.67

1,200.00 34,000.00 600.00 3,400.00

12 52,803

12 52,803

12 52,803

1 5,420

1 5,420

1 5,201

This Month

To Date

This Month

To Date

600

1,200 26,200 600 40,336

50% 0% 0% 0%

50% 39% 50% 593%

1 5,420

1 5,420

1 5,420

100% 100%

100% 100%

1 5,201

1 5,201

1 5,201

1 5,201

100% 100%

100% 100%

1 10,112

1 10,112

1 10,112

1 10,112

1 10,112

100% 100%

100% 100%

1 444

1 444

1 444

1 444

1 444

100% 100%

100% 100%

1 26,010

1 26,010

1 26,010

1 26,010

1 26,010

100% 100%

100% 100%

1 244.72 1 1305.00 1 7.77 1 107.98 1 247.00

1 244.72 1 1,305 1 7.77 1 108 1 247

1 244.72 1 1,305 1 7.77 1 108 1 247

1 244.72 1 1304 1 7.77 1 107.98 1 246.00

1 244.72 1 1305 1 7.77 1 107.98 1 247.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Daet AMMNBA (Labo,San Lorenzo Ruiz & SanVicente) BNP (Basud and Daet, Cam.Norte; Sipocot & Lupi, CS) Naga

MINP (Naga City, Calabanga,tinambac, Goa,Tigaon, Ocampo,Pili)

Goa

LNBA Lagonoy

Virac

CWFR(Virac,Bato, SanMiguel,Pandan Calolbon,Baras)

San Jacinto BongNP(Batuan) MTWFR CIWS NIWS TWFR (Mobo)

MFO 2

Page 35 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

Sorsogon BVNP (Casiguran, Barcelona,Irosin

1 3,672

1 3,672

1 3,672

1 3,672

1 3,672

100% 100%

100% 100%

1 1,032

1 1,032

1 1,032

1 1,032

1 1,032

100% 100%

100% 100%

1 1 1/400 1 4 4 4

1 1 1/100 1 1 1 1

1 1 1/100 1 2 2 2

1 1 1/150 1

1 1 1/250 1 1 2 2

100% 100% 150% 100% 0% 0% 50%

100% 100% 63% 100% 25% 50% 50%

23

2

11

7

1 1 2 1 3 2 2

1 1 2 1 4 2 2

0% 0% 50% 0% 0% 50% 0%

50% 50% 50% 100% 50% 50% 100%

and Juban) JMWFR Juban, Magallanes - Conduct of IEC and advocacy campaigns

Radio programs/

Total

flyers/posters

Cam.Norte

(GAD Mainstreamed Activity)

BNP AMMNBA

- Putting up signages

IEC materias prepared/ produced trainings conducted

Virac

CWFR

Sorsogon

BVNP

no. of IEC conducted

San Jacinto

Bo. NP

no. of IEC conducted

Naga

MINP

no. of IEC conducted

Goa

LNBA

no.

Total

1

within PAs Daet

BNP AMMNBA

Naga

c. Ecotourism Development

ecotourism mgt. Plan

MINP

Goa

LNBA

Virac

CWFR

San Jacinto

BongNP(Batuan)

Sorsogon

BVNP

2 2 4 1 8 4 2

1

1

1

Total

approved by PAMB (no./name of PAs) 1. Site assessment

sites assessed (ha.)

Region

5,776

5,776

1

1

5,776

100%

MVNP 2. Ecotourism Planning

ecotourism mgt. plan

Region

approved by PAMB

MVNP

ecotourism mgt. plan

Cam. Sur

CNP, Goa

1

1

1

Workshop scheduled on July 7-8, 2015 1

1

100%

100%

reviewed and endorsed to PAMB

MFO 2

Page 36 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

ecotourism mgt. plan

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

Cam. Sur

CNP, Goa

1

Cam. Sur

CNP, Goa

1

1

1

Cam. Sur

CNP, Goa

1

1

1

Region

MVNP

3

1

3

5

2

5

To Date

1

This Month

To Date

1

0%

100%

1

1

100%

100%

1

1

100%

100%

reviewed and endorsed to PENRO infrastructure maintained with report endorsed to Regional Office infrastructure maintained with report endorsed to PENRO 3. Site Development

Infrastructure constructed based on DAO 2009-09 with report submitted to BMB (no./identify infra) machineries equipment

Region

MVNP

purchased Transportation/Equipment

Failed bidding Region

MVNP

5

2

5

purchased Interpretative signs

Region

MVNP

Region

MVNP

1

installed (no.) 4. Ecotourism Business/ Investment Planning a. Identification of business/ enterprise b. Partnership building

ecotourism business

1

planning/investment

1

business enterprise identified with partners

1

partnership forged in the implementation of business enterprise with signed MOA submitted to BMB (no. of MOA)

5. Promotions

video/photo documentation/

Region

MVNP

2

production (no.)

MFO 2

Page 37 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

6. Capacity Building

Performance Indicator

Pos/LGUs/provided

* DENR staff

technical assistance on

* Pos/local communities

ecotourism enterprise

(GAD Mainstreamed Activity)

with report submitted

Province

Region

Location (Municipality/ District) MVNP

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

6

to BMB (no.) capacity building on

1

Region

ecotourism projects for POs and local communities in MVNP Monitoring and Evaluation a. Program Impact Monitoring

monitoring and evaluation

Region

conducted (no.)

Cam. Sur

CNP

Sorsogon

BVNP

4 4 4

2 2 2

1

2 2 2

50%

50% 50% 50%

7. Management of Caves and Cave Resources = Cave Assessment and Classification

report on the highlights of implementation status

Region

Cabulacao Cave

1

Bacacay, Albay

of cave management plans submitted to BMB

Mimaroso Cave

1

Rapu-Rapu, albay Nagtikwil Cave

1

Bacacay, Albay Dalangin Cave

1

Ragay, Cam. Sur Panti Cave, San

1

1

1

1

1

1

1

1

1

Andres, Catanduanes Karilagan Cave Virac, Catanduanes Puting Bato Cave San Fernando, Masbate

MFO 2

Page 38 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

Loakan Cave

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

1

1

1

1

1

1

1

1

1

1

1

1

3

3

3

1

1

1

1

1

1

1

To Date

Monreal, Masbate Pio Cave, Pilar, Sorsogon Kulalamnit Cave Gubat, Sorsogon 8. Conservation of Inland Wetlands = Assessment of inland wetlands

= Management of inland wetlands

inland wetlands

Region

100%

assessed with reports reviewed and endorsed

Lake Bato

to BMB

Bato, Cam. Sur

- number

Lake Buhi,

- name of wetland

Buhi, Cam. Sur

- area (ha.)

Prieto Diaz, Sor.

inland wetland mgt.

1

1 4

Region

1

1

1

1

1

100%

25%

100%

100%

plans approved by the stakeholders & endorsed

Lake Bato

to the OSEC thru BMB

Bato, Cam. Sur

1

1

1

- number - name of wetland

Lake Buhi,

- area (ha.)

Buhi, Cam. Sur Baao-Bula Lake

1

1

Baao & Bula, Cam. Sur

= Implementation of wetlands mgt. plan

Prieto Diaz, Sor.

1

of inland wetlands mgt.

Cabusao Wetland Area

1

1

1

plans submitted to BMB

Cabusao, Cam. Sur

1

1

1

report on the highlights

Region

of implementation status

(no.) Bulusan Lake,

1

1

Bulusan, Sorsogon

MFO 2

Page 39 of 45

January - June 2015

PHYSICAL CODE

A.03.d.2

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

Protection and Conservation of Wildlife 1 Conservation and Protection of Wildlife

4 2 2

1 1 1

2 1 1

Daet

2

1

1

Cam. Sur

8 2 2 2 2

4 1 1 1 1

4 1 1 1 1

Virac

2

1

1

Masbate

4 2 2

1 1

1 1

Sorsogon

2

1

Region

4

Total Albay

threatened species

Albay

protected and conserved

Legazpi

(marine turtles)

Guinobatan

55 1 54

55 1 54

2750% 100% 5400%

1375% 50% 2700%

1

0%

100%

5 2 1 1 1

75% 0% 100% 100% 100%

63% 100% 50% 50% 50%

7

0%

350%

1 1

100% 100%

50% 50%

1

5

0%

250%

1

3

5

13

4

13

10

13

77%

100%

2 2 4 2 2 1

1 1 1 1 1

2 2 4 2 2 1

2 1 4

2 2 4 2 2 1

100% 50% 100% 0% 100% 100%

100% 100% 100% 100% 100% 100%

CamNorte

Sipocot Naga Goa Iriga

3 1 1 1

Catanduanes

San Jacinto Mobo

1 1

Sorsogon

reports on conservation

125%

activities reviewed and endorsed to BMB (no.) reports on conservation activities reviewed and endorsed to RO (no.)

Cam. Norte Cam. Sur Catanduanes Masbate Sorsogon

MFO 2

Page 40 of 45

2 1

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

reports on conservation

Province

Total

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

13

4

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

13

10

13

77%

100%

1 1 2 1 1 1 1 2 1 1 1

1 1 1 1 1 1 1 1 1 1

1 1 2 1 1 1 1 2 1 1 1

100% 100% 50% 100% 100% 100% 100% 0% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

14 2 2 2 2 2 2 2

6

14

43%

100%

1 1 1 2 1

2 2 2 4 2 2

50% 50% 50% 100% 0% 50%

100% 100% 100% 200% 100% 100%

1

2

50%

50%

activities undertaken submitted to PENRO (no.)

Legazpi City Guinobatan Daet Sipocot Naga City Goa Iriga City Virac San Jacinto Mobo Sorsogon City

GAD Mainstreamed Activity

Region

4

1

2

WTMUs operationalized

Region

40

3

20

15

RWMC operationalized

Region

2

monitoring reports

Sorsogon

4

2

2

0%

50%

Sorsogon City

4

2

2

0%

50%

Sorsogon

4

2

2

0%

50%

Region

Cam. Sur Catanduanes Masbate Sorsogon

= Operations/mobilization of

1

2

Total

to CEPA

Cam. Norte

statistical activities

1

14 2 2 2 2 2 2 2

reports on attendance

Albay

= Coordination/linkages/

1 1 2 1 1 1 1 2 1 1 1

statistical activities conducted/coordinated

38%

Wildlife Traffic Monitoring Units (WTMUs and RWMC)

submitted to RO monitoring reports submitted to PENRO no. of WEOs deputized mobilized

MFO 2

Page 41 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT PERCENTAGE

To Date Annual

This Month

Jan-June

This Month

To Date

This Month

Remarks

To Date

2. Management of Caves and Cave Resources = Cave Assessment and Classification

report on the highlights

Region

of implementation status

Cabulacao Cave Bacacay, Albay

of cave management

Mimaroso Cave

plans submitted to BMB

Rapu-Rapu, albay Nagtikwil Cave Bacacay, Albay Dalangin Cave Ragay, Cam. Sur Panti Cave, San Andres, Catanduanes Karilagan Cave

Targetted under A.03.d.1

Virac, Catanduanes Putting Bato Cave San Fernando, Masbate Loakan Cave Monreal, Masbate Pio Cave, Pilar, Sorsogon Kulalamnit Cave Gubat, Sorsogon

3. Conservation of Inland Wetlands = Assessment of inland wetlands

MFO 2

inland wetlands

Region

assessed with reports reviewed and endorsed

Lake Bato,

to BMB

Bato, Cam. Sur

- number

Lake Buhi,

- name of wetland

Buhi, Cam. Sur

Page 42 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

- area (ha.) = Management of inland wetlands

inland wetland mgt.

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date Jan-June

This Month

To Date

This Month

To Date

Prieto Diaz, Sor. Region

plans approved by the stakeholders & endorsed

Lake Bato

to the OSEC thru BMB

Bato, Cam. Sur

Targetted under A.03.d.1

- number - name of wetland

Lake Buhi,

- area (ha.)

Buhi, Cam. Sur Baao-Bula Lake Baao & Bula, Cam. Sur Prieto Diaz Wetland Prieto Diaz, Sor.

= Implementation of wetlands mgt. plan

report on the highlights

Region

of implementation status of inland wetlands mgt.

Cabusao Wetland Area

plans submitted to BMB

Cabusao, Cam. Sur

(no.) Bulusan Lake, Bulusan, Sorsogon

A.03.d.3

Management of Coastal and Marine Resources/Areas 1. Sustainable Management of Coral Reefs Ecosystem a. Habitat vulnerability and assessment for NIPAS MPAs

area of habitat and

4,510

Region

703

4,510

2,550

4,510

57%

100%

resources mapped and assessed with report

Banocboc Calaguas Is.

submitted to BMB

and Fish Sanctuary

- name of MPA

Vinzons, Cam.Norte

1,700

1,700

1,700

700

700

700

- area covered by assessment (ha.)

Macabari Fish Sanctuary

100%

Marine Reserve Barcelona, Sor

MFO 2

Page 43 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District) Tres Marias Sanctuary

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date Jan-June

This Month

To Date

This Month

To Date

850

283

850

850

100%

1,260

420

1,260

1,260

100%

4,510

4,510

1,700

800 567

1,700

1,700

100%

700

233

700

700

100%

850

850

850

100%

1,260

1,260

1,260

100%

Libmanan, Cam. Sur Pungco-Uson Fish Sanctuary, Bacacay b. Coral Reef Ecosystems Management and Protection

report on the status of

Region

coral reef protected and managed

Banocboc Calaguas Is.

- name of PA

and Fish Sanctuary

- area (ha)

Vinzons, Cam.Norte Macabari Fish Sanctuary

2,550

4,510

57%

100%

Marine Reserve Barcelona, Sor Tres Marias Sanctuary Libmanan, Cam. Sur Pungco-Uson Fish Sanctuary, Bacacay Sanctuary, Bacacay c. Social Mobilization

local communities/

Region

POs mobilized with

Vinzons, Cam.Norte

report submitted to BMB

Barcelona, Sor

- no. of PO members

Bulusan, Sor.

or local communities

Bacacay

17 5 4 4 4

- name of MPA d. Marine Protected Area Strengthening and Networking

e. Sustainable Livelihood Interventions

MFO 2

MOA on MPA networking

Region

signed and copy provided

Vinzons, Cam.Norte

to BMB

Barcelona, Sor

- name of PA

Bulusan, Sor.

- area (ha)

Bacacay

sustainable livelihood

Region

enterprise with report

Vinzons, Cam.Norte

submitted to BMB

Barcelona, Sor

- number

Bulusan, Sor.

- name of MPA

Bacacay

4./4,510 1./1,700 1./700 1./850 1./1,260

############

17 5 4 4 4 Page 44 of 45

January - June 2015

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

TARGET

ACCOMPLISHMENT

Annual

This Month

Remarks

PERCENTAGE

To Date This Month

Jan-June

To Date

This Month

To Date

2. Provision of Technical Assistance in Integrated Coastal Management a. Participatory Coastal Resource Assessment for LGUs without ICM Plans

b. Formulation of ICM Plan

LGUs provided with

Region

technical assistance in

Panganiban, Catnes

the preparation of

Viga, Catanduanes

Municipal Coastal

Bagamanoc, Catnes

Environment Profile

Caramoran, Catanduanes

(MCEP)

Presentacion, Cam. Sur

LGUs provided with

Region

technical assistance in

Panganiban, Catnes

the preparation of

Viga, Catanduanes

Integrated Coastal Mgt.

Bagamanoc, Catnes

(ICM) Plan (no.)

Caramoran, Catanduanes Presentacion, Cam. Sur

MFO 2

5 1 1 1 1 1

1

3 1 1 1

1

3 1 1 1

33%

60%

5 1 1 1 1 1

1

3 1 1 1

1

3 1 1 1

33%

60%

Page 45 of 45

January - June 2015

Department of Environment and Natural Resources PHYSICAL ACCOMPLISHMENT REPORT As of the Quarter Ending June 30, 20145 OFFICE: DENR, Regional Office No. V PHYSICAL CODE

Program/Project/Activity

MFO 3

Ecosystem Regulatory Services

A.03.g

Enforcement of Laws,

Performance Indicator

Province

Location (Municipality/ District)

TARGET Annual

This Month

To Date

This Month

ACCOMPLISHMENT PERCENTAGE To Date To Date This Month

Rules and Regulations

A.03.g.1

Permit and Monitoring of Forest and Forest Resources Use 1. Forest Products Utilization and Land Use Regulation 1.a Issuance of tenurial Instrument application reviewed and

Total

43

-

18

Albay

-

-

Sorsogon

1 125 10 12 10 5 5

Region

150

25

75

43

-

19

1 125 10 4 4

-

1 125 4 2 2

3

22

17%

51%

2 6 10 1 3

0% 50% 0% 0% 0%

20% 50% 100% 20% 60%

80

8%

53%

11

0%

26%

1 125 7 2 2

100% 100% 0% 50% 50%

100% 100% 70% 50% 50%

forwarded to the RO (no./ha.)

Cam. Norte Cam. Sur Catanduanes Masbate

application reviewed/

4 6 4 1 3

3

6

forwarded to CO (ha) open areas identified

Total

and evaluated and mapped for appropriate

Guinobatan

tenure instrument (ha./no.) Daet Sipocot Goa

Cagmanaba, Oas

Page 1 of 6

1 125 1 1

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

TARGET Annual

This Month

To Date

This Month

Sorsogon City

4 10 3 2 5

-

Total

39

-

19

Region

9

-

4

Total

30

-

15

5 3 2

-

2 1 1

3 3

-

2 2

6 2 1 2 1

-

2 1

3 3

-

2 2

8 4 4

-

4 2 2

5 5

-

3 3

Iriga City Virac Mobo San Jacinto

1.b Review, assessment and

Location (Municipality/ District)

2 4 1

1

ACCOMPLISHMENT PERCENTAGE To Date To Date This Month

Remarks

2 5 1

50% 0% 0%

50% 50% 33%

3

0%

60%

0%

0%

4

0%

44%

11

0%

37%

3 1 2

100% 100% 100%

60% 33% 100%

2 2

0% 0%

67% 67%

4 2 1 1

100% 0%

67% 100% 100% 50% 0%

3 2

0% 0%

100% 67%

4 2 2

50% 50% 50%

50% 50% 50%

3 3

0% 0%

60% 60%

3

monitoring of compliance to existing agreements,

tenurial instrument

permit

holders monitored (no.) - TLA - IFMA - SIFMA - CBFMA - FLGMA - Flag - FlagT tenurial instrument holders assessed/evaluated with categorical recommendation

Albay Legazpi Guinobatan Cam. Norte Daet Cam. Sur Sipocot Naga Goa Iriga Catanduanes Virac Masbate San Jacinto Mobo Sorsogon Sorsogon

Page 2 of 6

1

2 1 1

2 1 1

100%

-

2 1 1

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

2. Forest Protection Program Menu 1: Full logistic material essential in forestry law

Province

Location (Municipality/ District)

TARGET Annual

This Month

This Month

-

Total surveillance/ground

To Date

ACCOMPLISHMENT PERCENTAGE To Date To Date This Month

Region

1

-

1

1

0%

100%

Region

1

1

1

1

1

100%

100%

53

10

16

15

26

94%

49%

Total

53

-

16

15

26

94%

49%

Albay

-

2 2 4 2 4 2

2

2

Sorsogon

8 7 12 7 12 7

4 3

7 2 6 9

100% 0% 150% 0% 100% 150%

25% 0% 58% 29% 50% 129%

Total

53

-

15

15

26

100%

49%

4 4 7 4

-

1 1 2 1

1 1

1 1

4

4

100% 100% 0% 400%

25% 25% 0% 100%

operations conducted

enforcement Menu 4: Sustained a well planned information, education and

paralegal training for deputation

communications campaign region-wide down to CENRO level A.03.g.2

Permit issuance and monitoring of land and land resources use 1. Management of Foreshore Area a. Issuance of lease contracts and permits draft permits/lease

Region

LMD

contracts reviewed and endorsed to LMB (no./ha.) applications reviewed and endorsed to region (no./ha.)

Cam. Norte Cam. Sur Catanduanes Masbate

applications processed

6

and endorsed to PENRO (no./ha.)

Legazpi City Guinobatan Daet Sipocot

Page 3 of 6

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Province

Location (Municipality/ District)

2 2 3

0% 100% 0% 100% 200% 150%

25% 50% 29% 57% 40% 129%

66

-

31

12

36

39%

55%

66

-

31

12

36

39%

55%

Total

66

31

12

36

39%

55%

4 2 9 2 12 2

2

6

7

Sorsogon

9 4 20 4 25 4

-

Albay

11 2 14 3

50% 0% 78% 0% 25% 0%

67% 0% 55% 50% 56% 75%

Total

66

-

31

12

37

39%

56%

Legazpi City

5 4 4 8 7 5 4 16 9 4

-

2 2 2 4 3 2 2 8 4 2

1 1

4 2 1 6 3 2 2 9 5 3

50% 50% 0% 100% 67% 50% 0% 25% 25% 0%

80% 50% 25% 75% 43% 40% 50% 56% 56% 75%

San Jacinto Sorsogon City

patrimonial lands and other

and other government

government assets and

assets and properties

properties including the

re-appraised

This Month

ACCOMPLISHMENT PERCENTAGE To Date To Date This Month 1 2 2 4 2 9

Mobo

lands, patrimonial lands

To Date 1 2 2 2 1 2

Virac

foreshore lands, friar

This Month -

Iriga City

foreshore leases, friar lands,

Annual 4 4 7 7 5 7

Goa

b. Valuation/re-appraisal of

TARGET

Total

2

establishment & maintenance of corresponding database

appraisal report/

e.g. fees and other charges.

reviewed and endorsed

Region

LMD

to LMB (no.) appraisal reviewed and endorsed to region (no.) Cam. Norte Cam. Sur Catanduanes Masbate

appraisal/re-appraisal

3

conducted (no.) Guinobatan Daet Sipocot

Pasacao & Ragay

Goa

Caramoran & Sangay

Iriga City

Balatan & Bato

Virac Mobo San Jacinto Sorsogon City

Survey of Residential Land

Region

Targetted under MFO 2

Page 4 of 6

4 2 1 2 1

Targetted under MFO 2

Remarks

PHYSICAL CODE

Program/Project/Activity

3. Collection of Revenues

Performance Indicator

revenues collected

Province

Location (Municipality/ District)

TARGET Annual

This Month

To Date

This Month

ACCOMPLISHMENT PERCENTAGE To Date To Date This Month

Total

2,910,000.00

251,333.33

1,455,000.00

891,077.52

2,181,426.95

61.24%

74.96%

Region

300,000.00 1,480,000.00 20,000.00 100,000.00 90,000.00 40,000.00 30,000.00 90,000.00 120,000.00 300,000.00 40,000.00 300,000.00

25,000.00 123,333.33 1,666.67 8,333.33 7,666.67 3,333.33 2,666.67 7,666.67 10,000.00 25,000.00 3,333.33 33,333.33

150,000.00 740,000.00 10,000.00 50,000.00 45,000.00 20,000.00 15,000.00 45,000.00 60,000.00 150,000.00 20,000.00 150,000.00

63,998.60 436,956.82 7,175.00 3,721.00 2,475.65 5,558.00

179,848.65 932,872.33 20,307.70 23,817.26 54,948.53 29,644.58 21,866.00 49,560.45 70,759.00 626,571.03 69,987.66 101,243.76

42.67% 59.05% 71.75% 7.44% 5.50% 27.79% 0.00% 0.00% 41.55% 207.70% 50.64% 16.39%

59.95% 63.03% 101.54% 23.82% 61.05% 74.11% 72.89% 55.07% 58.97% 208.86% 174.97% 33.75%

Legazpi Guinobatan Cam. Norte Sipocot Naga City Goa Iriga City Catanduanes Mobo San Jacinto Sorsogon

24,930.00 311,550.30 10,127.00 24,585.15

GAD Mainstreamed Activitiy a. IEC on Rights and Benefits

IEC conducted

Region

1

-

1

Albay

Sorsogon

4 4 4 4 4 4

-

2 2 2 2 2 2

Region

2

-

1

100%

of Foreshore Mgt. b. Gender data anaylsis

Cam. Norte Cam. Sur Catanduanes Masbate

A.03.g.3

1

1 2

1

2 2

0% 50% 0% 50% 0% 0%

25% 50% 0% 50% 0% 50%

Issuance of Protected Areas Community-Based Resource Management Agreement and Monitoring of Protected Areas, Wildlife, Coastal and Marine Resources

1. Enforcement of PA, wildlife and cave laws, rules and regulations = Issuance of wildlife permits

wildlife permits issued (no.)

Page 5 of 6

-

20

20

1000%

Remarks

PHYSICAL CODE

Program/Project/Activity

Performance Indicator

revenue based on what

Province

Location (Municipality/ District)

TARGET Annual

This Month

To Date

Region

8,000

-

-

Region

2

-

-

Region

3

-

This Month 14,265.00

ACCOMPLISHMENT PERCENTAGE To Date To Date This Month 14,265.00

Remarks

178%

is legally due collected (Peso) = Conduct monitoring

wildlife permit holders

0%

monitored with compliance monitoring report submitted to BMB - no. of permits/type = Strengthening of Coastal Law

apprehensions/

Enforcemnt Alliance with

surveillance conducted

partners (NGAs, NGOs,LGUs)

with report submitted

2

to BMB (no.) = Operationalization/mobilization

WTMUs operationalized

Region

-

RWMC operationalized

Region

-

of Wildlife Traffic Monitoring (WTMUs) and RWMC

Page 6 of 6

2

0%

67%

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Physical and Financial Accomplishment Monitoring Report As of the Quarter Ending June 30, 20145

REGIONAL OFFICE NO. V PHYSICAL CODE

Program/Project/Activity

Performance Indicator

Location (Municipality/ District)

TARGET Annual

This Month

To Date

This Month

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

Youth Desk 1. Attendance/Participation to National environment youth camp

No. of National environmental youth camp attended/ participated

1

1

1

2. Conduct/facilitate Regional environmental youth camps

No. of Regional environmental youth camps conducted/facilitated

4

2

2

3. Youth Desk Annual Assessment

No. Of Annual Youth Desk assessment attended

1

1

1

4. Attendance/participation to trainings/workshops/seminars

No. of trainings/workshops/seminars attended

4

2

2

5. Conduct of IEC (lecture, fora, symposia)

No. of IEC (lecture, fora, symposia) conducted

12

6

6

1

4

17%

33%

6. Attendance to meetings/coordination No. of meetings/coordinations attended with other agencies re:youth re: youth programs/projects/activities programs/projects/activities

12

6

6

3

8

50%

67%

7. Monitoring/validation of mandated environmental youth projects implemented

12

6

6

2

2

33%

17%

No. of mandated environmental youth projects monitored/validated

1

25%

0%

1

25%

Senior Citizens Orientation of DENR personnel on RA 9994

no. Of report on orientation conducted Region

1 Page 1 of 3

1

1

100%

Remarks

PHYSICAL CODE

Program/Project/Activity

Conduct of lectures on Environment for Senior Citizens

Performance Indicator

no. of lectures conducted

Location (Municipality/ District)

TARGET Annual

This Month

To Date

This Month

Region

1

1

1

Albay Cam Norte Cam Sur Catanduanes Masbate Sorsogon

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

no. of monitoring reports prepared

Region

7

2

5

no. of seedlings provided

Region

1000

333

1000

Albay Cam Norte Cam Sur Catanduanes Masbate Sorsogon

1000 1000 1000 1000 1000 1000

333 333 333 333 333 333

1000 1000 1000 1000 1000 1000

1

1

1

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

`

Monitoring of DENR/field office compliance to RA 9994

Provision and Assistance to SC during their clean and green program

1

1

100%

100%

1

1 1

100%

100% 100%

3

60%

1,000

1,000

100%

100%

450 1,500

950 1,500

45% 150%

95% 150%

PWD Orientation of DENR personnel on RA 7277

no. report on orientation conducted

Region

Page 2 of 3

1

100%

Remarks

PHYSICAL CODE

Program/Project/Activity

Conduct of lectures on Environment for PWD

Performance Indicator

no. of lectures conducted

Location (Municipality/ District)

TARGET Annual

This Month

To Date

This Month

ACCOMPLISHMENT PERCENTAGE To Date This Month To Date

Region

1

1

1

Albay Cam Norte Cam Sur Catanduanes Masbate Sorsogon

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

no. of monitoring reports prepared

Region

7

2

4

3

75%

Educational tour to different projects of DENR such as coastal/mangrove plantations

no.

Region

2

1

2

1

50%

Maintenance and provision of express lane or area for PWD

no.

Region

1

1

2

1

50%

`

Monitoring of DENR/field office compliance to RA 7277

Page 3 of 3

1

1

100%

100%

1

1

100%

100%

Remarks

Region 5 2nd Qtr 2015 Accomp.pdf

1,200 122 507 153.35 528.6020 30% 44%. Sorsogon 420 36 170 88 201 48%. (ha.) 420 36 170 300.2000 71%. applications processed. and forwarded to PENRO. (no./has) Total 3,600 333 1,440 455 1,560 32% 43%. 4,100 387.0000 1,634.0000 411.2653 2,002.3810 25% 49%. Albay. Legazpi 200 16 66 24 66 36% 33%.

2MB Sizes 0 Downloads 152 Views

Recommend Documents

2nd qtr 2015 BAR No1.pdf
P- Occ. Mindoro 1 1 1 1. updating of existing plans P- Or. ... Oriental Mdo. 1 1 1 3 1 1. Marinduque 1 1 2 1 .... C-Calapan 3 3 3 3 3 3 3 3. C-Socorro 3 3 3 3 3 3 3 3.

04 2nd qtr profit loss.pdf
Page 1 of 1. Account Programs Administrative Fundraising Total YTD. Income (includes FY2011 receivables). A1 Contributions 124300 5820 0 130120. A3 Program Services - Earned Income 92189 3075 0 95264. Interest Income 0 0 0 0. 22 Cash Assets (carry-ov

2015 3rd Qtr. (income).pdf
1 2 3 4 5 6 7 8=(4+5+6+7) 9 10 11=(9+10) 12=(8-3) 13=(12/3) 14 ... Remarks. VARIANCE. Remittance to. BTR. Deposited with. AGDB. Total Amount %.

1 to 5 June 2015 1 to 5 June 2015 1 to 5 June 2015
This programme gives participants a comprehensive understanding of planning and conducting scientific experiments for collecting data and analysing the data ...

1 to 5 June 2015 1 to 5 June 2015 1 to 5 June 2015
approved by All India Council for Technical Education (AICTE) and Mechanical department is permanently affiliated to. Savitribai Phule Pune University, Pune.

Region 8 2015-16 Calendar of Events.pdf
2. Loading… Page 1 of 2. Page 2 of 2. Region 8 2015-16 Calendar of Events.pdf. Region 8 2015-16 Calendar of Events.pdf. Open. Extract. Open with. Sign In.

2015 Metro Region Reciprocity Agreement Direct Care Training.pdf ...
For either option, a minimum score of 80% is required for passing. If. the individual does not pass the competency exam with a minimum score of 80%, additional training will. be required. It is understood that a separate reciprocity agreement is in p

Colorado and Wyoming Region Summit 2015.pdf
http://www.mtbproject.com/trail/5465582/red-mountain-jeanne-golay-trail. Sunday, August 30th. Buffalo Valley Restaurant Parking Lot, 3637 CO-82, Glenwood ...

SRA Northwest Region Summary 2015-16.pdf
NORTHWEST. OUSD SRA 2015-16: NORTHWEST 3. Page 3 of 76. SRA Northwest Region Summary 2015-16.pdf. SRA Northwest Region Summary 2015-16.

Region Activity Event Policy E1 Nov 2015.pdf
Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Region Activity Event Policy E1 Nov 2015

2015 Metro Region Reciprocity Agreement Direct Care Training.pdf ...
2015 Metro Region Reciprocity Agreement Direct Care Training.pdf. 2015 Metro Region Reciprocity Agreement Direct Care Training.pdf. Open. Extract.

[CVMA USE ONLY] 2015 Region 6, CVMA Events ... -
MO 4-11 Commander: Tony “Giff” Gifford [email protected]. MO 4-12 Commander: Jerry “Tet Vet” England [email protected]. Nebraska State Rep:.

Kathryn Eurich Named 2015 ACF Northeast Region Student Chef of ...
Jan 27, 2015 - accompanied by buttery potato, winter mushroom and vegetable medley, carrot-apple puree, apple cider-calvados sauce and black truffle.

South east Region Annual Report 2015.pdf
Michael Cooper South Kent 07775 – 119451. Diane Steele West Sussex, East Sussex 07775 – 119452. Page 3 of 10. South east Region Annual Report 2015.

Kathryn Eurich Named 2015 ACF Northeast Region Student Chef of ...
Jan 27, 2015 - ... Student Chef of the Year Award, sponsored by Custom Culinary, Inc., ... winter mushroom and vegetable medley, carrot-apple puree, apple ...

2017 3rd Qtr RES.pdf
Page 1 of 14. CAR Regional Economic Situationer | 1. Third Quarter 2017. Cordillera Administrative Region. ASSESSMENT OF LEADING ECONOMIC. INDICATORS. Leading economic indicators showed a mix picture of. the regional economy for the quarter. Compared

Rly Qtr Aplication.pdf
Camotes Sea, on the west by the Bohol Strait, and on the. south by the Mindanao Sea. Capital Tagbilaran City. Land Area ... Cost of Doing Business. LABOR RATES: Tagbilaran City Municipalities. Non-Agri ... MESSENGERIAL (DHL) US Japan Middle East Fran

Serai qtr EBook.pdf
NED University of Engineering and Technology. A Research Project Sponsored by the Ministry of Culture, Government of Sindh. © Department of Architecture ...

11ARTS Gr10 TG - Qtr 4 (10 Apr 2015).pdf
Loading… Page 1. Whoops! There was a problem loading more pages. Retrying... 11ARTS Gr10 TG - Qtr 4 (10 Apr 2015).pdf. 11ARTS Gr10 TG - Qtr 4 (10 Apr 2015).pdf. Open. Extract. Open with. Sign In. Main menu. Displaying 11ARTS Gr10 TG - Qtr 4 (10 Apr

NTP - Procurement of Office Supplies 1st Qtr 2015.pdf
There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. NTP - Procurement of Office Supplies 1st Qtr 201

4MUSIC Gr10 TG - Qtr 1 (10 April 2015).pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... 4MUSIC Gr10 ... il 2015).pdf. 4MUSIC Gr10 T ... ril 2015).pdf. Open.

Invitation to Bid - Procurement of Cleaning Materials 1st Qtr 2015.pdf ...
Page 3 of 3. Invitation to Bid - Procurement of Cleaning Materials 1st Qtr 2015.pdf. Invitation to Bid - Procurement of Cleaning Materials 1st Qtr 2015.pdf. Open.

Report 2015-2nd edition.pdf
Sign in. Page. 1. /. 60. Loading… Page 1 of 60. Annual Report. Page 1 of 60. Page 2 of 60. 03. Introduction. Contents. 40. Special. Events. 18. Medical. Missions. 48. Huda Al Masri. Pediatric Cancer. Dept. 10. Treatment Abroad. Cases. 44. Budget fo