SINILOAN WATER DISTRICT Bibiana Bldg., E. Castro St, Siniloan, Laguna TeleFax No. (049) 501-6656

April 20,2017

REQUEST FOR QUOTATION OF PRICES

The Siniloan Water District (SIWADI), through its Bids and Awards Committee (BAC). Is inviting all eligible suppliers to submit a Quotation for the supply and delivery of: Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Item Description G.I. Elbow 1/2" HD G.I. Elbow 3/4" HD G.I. St. Elbow 1/2" HD Teflon 1/2" G.I. Union Patente 1/2"HD G.I. Plug 3/4" HD G.I. Plug 1/2" HD C.I. Saddle Clamp 6" x 3/4" PVC C.I. Saddle Clamp 3" x 3/4" PVC C.I. Saddle Clamp 2" x 3/4" PVC Brass Corpo Stop 3/4" HD Brass Corpo Stop 1" HD Brass Replacement Piece 1/2" HD Brass Replacement Piece 3/4" HD Brass Replacement Piece 1" HD HDPE Pipe 1/2" x 300 mtrs. HDPE Pipe 1" x 100 mtrs. G.I. Coupling 1/2" HD

Quantity 750 50 200 1500 70 20 50 10 50 50 10 5 300 25 5 5 1 200

Unit Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Rolls Rolls Pcs.

Subject to the submission of the following requirements: 1. 2. 3. 4. 5. 6.

Copy of DTI or SEC registration Certificate Copy of Latest Mayors Permit PhilGEPS Registration Certificate Supplier’s latest Income Tax Letter of Intent Statement of the Bidder that is not BLACK LISTED or barred from bidding by the government or any of its agencies, offices, corporation of LGU’s 7. Sworn Affidavit of the bidder that is not related to the HOPE , BAC Chairman, Member, BAC Secretariat and Technical Working Group (TWG) by consanguinity of affinity up to the third civil degree. 8. Audited Financial Statement supported by an independent CPA’s certificate, stamped ”receive” by the BIR or its duly accredited an authorized institutions, for preceding calendar year, which should no be earlier that two(2) years from the date of bid submission shall be attached upon submission of the quotation 9. Authority of the representative/signatory signing the price quotation. The duly accomplished Price Quotation Form (Annex “A”) together with the documentary requirements, shall be submitted in a sealed envelope to the BAC on or beforeApril 27,2017, 1:00 P.M.and will be opened on the same day at 1:30 P.M. at the Siniloan Water District Office Bibiana Bldg. E. Castro Street Siniloan, Laguna.

SINILOAN WATER DISTRICT Bibiana Bldg., E. Castro St, Siniloan, Laguna TeleFax No. (049) 501-6656

The Approved Budget for the Contract is PHILIPPINE PESOS: One Hundred Sixty Thousand Pesos Only (Php 160,000.00)

IMPORTANT TERMS AND CONDITIONS 1. All quotations submitted to Siniloan Water District are considered as offer. In the event that the quotation is accepted, a Purchase Order shall be placed with the Company offering the most advantageous terms to the Agencies; 2. The sealed quotation and the offer contract terms and conditions shall be signed by the prospective bidder’s duly authorized representative/signatory. Unsigned quotation and/or offer of contract terms and conditions and offer submitted that are not in the prescribed sealed quotation form shall be rejected outright; 3. Price quotation should be valid for sixty(60) days’; 4. Delivery Period Shall be fifteen(15) days upon issuance of the Purchase Order; 5. No Partial Delivery 6. Payment shall be in accordance with the usual budgeting, accounting and auditing requirements; 7. Administrative penalties pursuant to Section 69 of the Revised IRR-RA 9184 shall be imposed for non-delivery without valid reason; 8. All required Philippine Taxes must be included in the quotation; 9. Incomplete submission of the required documents is a ground for rejection of supplier’s quotation; 10. The awarding of this RFQ will be on a lump sum basis. Prospective Suppliers must quote for all items. Otherwise they will be subjected for disqualification; 11. Request For Quotation forms can be downloaded free of charge from the website of the Philippines Government Electronic Procurement System (PhilGEPS), www.philgeps.net. Only interested suppliers who purchased Request For Quotation is/are allowed to submit their quotation. Interested bidders shall pay the non-refundable fee for the Request for Quotation form amounting to Php 500.00 starting the office hours and days of April 21,2017 and not later than of 5:00 p.m. of April 27,2017. Payment shall be made at the office of Siniloan Water District ( address mentioned above). 12. The SINILOAN WATER DISTRICT Bids and Awards Committee (BAC) reserved the right to accept or reject any bid, to annul the bidding process, and to reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders.

RECOMMENDING APPROVAL:

(SGD) ALFREDO D. DELOS SANTOS BAC Chairman

(SGD) Engr. ISIDORO V. REALEZA General Manager (SIWADI

SINILOAN WATER DISTRICT Bibiana Bldg., E. Castro St, Siniloan, Laguna TeleFax No. (049) 501-6656

PRICE QUOTATION FORM

Date:__________________

ALFREDO D. DELOS SANTOS Chairman, Bids and Awards Committee Siniloan Water District Bibiana Bldg. E. Castro Street Siniloan, Laguna

Sir:

After having carefully read and accepted the terms and conditions in the Request for Quotation (RFQ) for the “Supply and Delivery of Service Connection Materials” posted by Your office, we hereby submit our proposal corresponding to your requirements.

Item No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Item Description

G.I. Elbow 1/2" HD G.I. Elbow 3/4" HD G.I. St. Elbow 1/2" HD Teflon 1/2" G.I. Union Patente 1/2"HD G.I. Plug 3/4" HD G.I. Plug 1/2" HD C.I. Saddle Clamp 6" x 3/4" PVC C.I. Saddle Clamp 3" x 3/4" PVC C.I. Saddle Clamp 2" x 3/4" PVC Brass Corpo Stop 3/4" HD Brass Corpo Stop 1" HD Brass Replacement Piece 1/2" HD Brass Replacement Piece 3/4" HD Brass Replacement Piece 1" HD HDPE Pipe 1/2" x 300 mtrs. HDPE Pipe 1" x 100 mtrs. G.I. Coupling 1/2" HD

Quantity

Unit

750 50 200 1500 70 20 50 10 50 50 10 5 300 25 5 5 1 200

Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Pcs. Rolls. Rolls.

Pcs. Total

Unit Cost ( in Pesos)

Amount ( in Pesos)

SINILOAN WATER DISTRICT Bibiana Bldg., E. Castro St, Siniloan, Laguna TeleFax No. (049) 501-6656

The above quoted prices are inclusive of all cost and applicable taxes. The aforementioned requirements shall be delivered to Siniloan Water District within seven (7) days upon issuance of the Purchase Order.

Very truly yours,

_______________________________ Name/Position/Signature of Representative

_______________________________ Name of Company

_______________________________ Company Address

_______________________________ Contact Number/s

service connection materials RFQ 04202017.pdf

REQUEST FOR QUOTATION OF PRICES. The Siniloan Water District (SIWADI), through its Bids and Awards Committee (BAC). Is. inviting all eligible suppliers ...

336KB Sizes 4 Downloads 163 Views

Recommend Documents

RFQ Invitation.pdf
Page 1 of 2. Invitation. City of Turner, Oregon. Request for Qualifications. CLOSING DATE:January 16, 2018. CLOSING TIME: 4:00P.M. (Pacific Time). To Provide: CONSULTANT SERVICES FOR DATA COLLECTION AND MODELING. DEVELOPMENT FOR THE MILL CREEK DRAINA

Tubular connection
Apr 23, 1975 - the pin member to be pulled radially outward. There. 0. 5. 35. 40. 45. 55. 65. 2 fore, the ..... produce forces tending to urge the members radi~.

(RFQ) IRG/PDP/LM/2014/136 For the Supply of Service ...
May 21, 2014 - 1) Payment to the successful bidder will be made as per following schedule. Payments Service Drop, Hardware and Conductors will be made in two stages i.e.. A. In case of FOB Port of Loading based contract/purchase order: I. Supplier wi

RFQ for Geotechnical Engineering Services_12629A.pdf
Page 3 of 5. RFQ for Geotechnical Engineering Services_12629A.pdf. RFQ for Geotechnical Engineering Services_12629A.pdf. Open. Extract. Open with.

RFQ: Server High Availability Project.pdf
RFQ: Server High Availability Project.pdf. RFQ: Server High Availability Project.pdf. Open. Extract. Open with. Sign In. Main menu.

RFQ Courthouse Construction Management.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

RFQ - Economic and Housing Development - Request for ...
Page 1 of 9. City of Newark EHD - RFQ for Contractors/Developers. 1 of 9. Department of Economic and Housing Development. Division of Property Management. 920 Broad Street, Room 421. Newark, New Jersey 07102. REQUEST FOR QUALIFICATIONS (RFQ). For Co

Q17-004 RFQ Packet.pdf
Page 1 of 31. Request for Qualifications. Q17-004. Consulting Services for. IT Infrastructure Standards and Specifications. Date Event. June 28, 2016 ...

request for qualifications (rfq) - City of Mobile
May 11, 2015 - 1. Environmental Review and Analysis. 2. Development of Design Scopes of Work Support. 3. Architect/Engineer Selection Support ...

pdf-83\connection-parenting-parenting-through-connection-instead ...
Connection Parenting is utterly transformational. -- Christiane Northrup, MD, author of Mother- Daughter Wisdom. Empowering, simple and undeniably true. -- Kali Wendorf, editor byronchild magazine. Pam Leo's "minimum daily requirements" of connection

Connection methodology for two ubiquitous robot spaces-connection ...
Intelligent Systems Research Institute ... lem of designing software module and middleware. ... International Conference on Advanced Intelligent Mechatronics.

RFQ Cal Perf MP final.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. RFQ Cal Perf ...

RFQ TDPS MP .pdf
University of California, Berkeley Page 1 of 7. Theater ... In 2012, Backstage Magazine ranked UC Berkeley as one of the top five dance .... RFQ TDPS MP .pdf.

request for qualifications (rfq) - City of Mobile
May 11, 2015 - a 3 Year Capital Budget for the City's public facilities, including roads, ..... subconsultants' key personnel who would perform work for on-call program ... Management Ordinance, Building Codes, Right of Way Ordinance and.

2.) RFQ-SEQUEST 1st Qrtr.pdf
Note: Amount stated is for posting requirement only, please give us your best price quotation. Item. No. Quantity Unit Price Total Price. 1 18 Universal Drinking Water Treatment Additive. Chemical Family: Blend of Inorganic Phosphate. Quantity: 25kg/

Ruggedized fiber optic connection
Oct 31, 2007 - a degree of resistance to tension from cable 12 which may be acting to pull a .... able for use, a ?eld technician might remove plug assembly.

TICON Industrial Connection PCL
Jan 15, 2018 - Hong Kong. 41/F CentralPlaza, 18 Harbour Road, Wanchai, Hong Kong ... KGI policy and/or applicable law regulations preclude certain ...

OpenBMS connection with CAN - GitHub
Arduino with BMS- and CAN-bus shield as BMS a master. - LTC6802-2 or LTC6803-2 based boards as cell-level boards. - CAN controlled Eltek Valere as a ...

kensington creek connection
Kensington Creek. Updates, Info, & NEW · Facebook Group Link—4 ... All Ages, Kids, Strollers, and Dogs Welcome ○. If interested, please send an email to the ...

8. Physical Connection
The transfer rate comparison is relative to serial versus parallel. Serial data ..... systems that were only practical for those areas without cell phone coverage.