Administrative Procedure 545

BUILDING AND GROUNDS MAINTENANCE Background The district has a responsibility to protect the community's capital investment in school facilities by ensuring school buildings and grounds are adequately maintained. Procedures 1. School buildings and grounds will be maintained at a level consistent with provincial code requirements and district standards. 2. The district will periodically evaluate the physical condition of its facilities and grounds and identify both deficiencies and desired enhancements. 3. Each year, as part of the operational planning and budgeting process, the district will prioritize facility and grounds maintenance projects and reflect these priorities in the recommended allocation of resources for budgeting purposes. 4. The school building and group maintenance program will include: 4.1

Minor maintenance and repairs that are conducted on an ongoing basis by maintenance and/or custodial staff; 4.1.1

Maintenance and repair work orders initiated and/or approved by an employee authorized to do so by the Director, Facilities will serve as the required authority to effect routine maintenance and repair either by contract or the district’s own forces.

4.2

Scheduled maintenance including such items as servicing air handling systems and furnaces, playground lawn cutting, etc.;

4.3

Major scheduled maintenance activities such as painting, playground development, renovations not funded under IMR, etc.; 4.3.1

4.4

Major maintenance and repair projects will be undertaken in accordance with the annual estimate of revenue and expenditure approved by the district.

Building modernization projects funded under IMR such as roof replacements and responses to building code requirements.

5. The Director, Facilities is responsible for developing and implementing the district's buildings and grounds maintenance program. Approval Date:

April 12, 2016

Reference:

School Act​ ​ Section 20, 60, 61, 113, 117

Calgary Roman Catholic Separate School District No. 1 Administrative Procedures Manual

April 2016 Page 1 of 1

building and grounds maintenance

Apr 12, 2016 - Minor maintenance and repairs that are conducted on an ongoing basis by ... Major scheduled maintenance activities such as painting, ...

57KB Sizes 0 Downloads 143 Views

Recommend Documents

man-29\building-maintenance-services.pdf
Connect more apps... Try one of the apps below to open or edit this item. man-29\building-maintenance-services.pdf. man-29\building-maintenance-services.pdf.

buildings and grounds inspections
Apr 12, 2016 - be the duty of all school caretakers to keep the boiler rooms free ... In case of defect, the caretaker will notify the Service Desk, and also advise.

Buildings and Grounds employment packet.pdf
Post-secondary training in a trade is desirable. Qualifications: · Meets all mandated health requirements (e.g., a negative tuberculosis test, .... Revised: October 2002. Revised: August 2017. Page 3 of 6. Buildings and Grounds employment packet.pdf

Saccharomyces boulardii: CMDh scientific conclusions and grounds ...
Nov 25, 2017 - Taking into account the PRAC Assessment Report on the PSUR(s) for saccharomyces boulardii, the scientific ... patients is considered changed and an update of the product information is warranted. ... relevant sections of the SmPC (sect

5217-Building Maintenance Mechanic-Veteran's JH.pdf
Page 1 of 1. PLEASE DO NOT REMOVE THIS POSTING FROM BULLETIN BOARD. POSTING # 5217. November 22, 2017. NOTICE OF VACANCY. POSITION: Building and Maintenance Mechanic –Veteran's Junior High School. CLASSIFICATION: 15. SHIFT: Days - (6:00am to 2:00pm

Maintenance and augmentation.PDF
The Ticket Checking Staff have been complaining about their mis-utilisation. ... the staff be deployed judiciously for the Ticket Checking jobs and *t to be utilized ... Maintenance and augmentation.PDF. Maintenance and augmentation.PDF.

INSTALLATION, MAINTENANCE AND TROUBLESHOOTING OF ...
INSTALLATION, MAINTENANCE AND TROUBLESHOOTING OF COMPUTER NETWORKS.pdf. INSTALLATION, MAINTENANCE AND TROUBLESHOOTING ...Missing:

FLEXIBLE PAVEMENT FAILURES, MAINTENANCE AND ...
Connecticut Advanced Pavement Laboratory ... 179 Middle Turnpike, U-202. Storrs ... PAVEMENT FAILURES, MAINTENANCE AND EVALUATION NOTE 1.pdf.

granisetron: CMDh scientific conclusions and grounds for the variation ...
Dec 22, 2016 - Taking into account the PRAC Assessment Report on the PSUR(s) for granisetron ... Annex III. Timetable for the implementation of this position ...

fluvastatin: CMDh scientific conclusions and grounds for the variation ...
The following adverse reaction(s) should be added under the SOC gastrointestinal disorders with a frequency 'not known': Diarrhoea. Package Leaflet.

Permethrin: CMDh scientific conclusions and grounds for the variation ...
Jun 9, 2018 - Based on a comprehensive review of “paraesthesia”, including ... of hypersensitivity reactions to chrysanthemums including literature ...

Felbamate: CMDh scientific conclusions and grounds for the variation ...
Aug 5, 2017 - Taking into account the PRAC Assessment Report on the PSUR(s) for ... for the variation to the terms of the Marketing Authorisation(s) ... Page 3 ...

Quetiapine: CMDh scientific conclusions and grounds for the variation ...
Jun 9, 2018 - peak toxicity and prolonged recovery when compared to immediate-release (IR) quetiapine overdose: a retrospective cohort study. Clinical ...

Maintenance and augmentation.PDF
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Maintenance ...

Maintenance and preparaton.PDF
Page 1 of 2. Stand 02/ 2000 MULTITESTER I Seite 1. RANGE MAX/MIN VoltSensor HOLD. MM 1-3. V. V. OFF. Hz A. A. °C. °F. Hz. A. MAX. 10A. FUSED.

gabapentin: CMDh scientific conclusions and grounds for the variation ...
Nov 26, 2016 - Taking into account the PRAC Assessment Report on the PSUR(s) for gabapentin, ... Annex III. Timetable for the implementation of this position ...

Budesonide: CMDh scientific conclusions and grounds for the ...
Mar 11, 2017 - Taking into account the PRAC Assessment Report on the PSUR(s) ... 3. Grounds for the variation to the terms of the Marketing Authorisation(s).

Thiopental: CMDh scientific conclusions and grounds for the variation ...
Jan 28, 2017 - Therefore, in view of the data presented in the reviewed PSUR(s), the ... The CMDh reaches the position that the marketing authorisation(s) of ...

Oxytocin: CMDh scientific conclusions and grounds for the variation ...
Due to the existing structural homology between oxytocin and latex, latex allergy/intolerance may be an important predisposing risk factor for anaphylaxis.

fluticasone propionate: CMDh scientific conclusions and grounds for ...
23 Dec 2017 - Taking into account the PRAC Assessment Report on the PSUR(s) for fluticasone propionate the scientific conclusions are as follows: Based on the review of data considered during the assessment of this ... 3. Annex II. Amendments to the

glucosamine,: CMDh scientific conclusions and grounds for the ...
27 Jan 2018 - Taking into account the PRAC Assessment Report on the PSUR(s) for glucosamine, the scientific ... insufficient information to conclude on a mechanism for an interaction between glucosamine and coumarin ... the product information of med

diacerein: CMDh scientific conclusions and grounds for the variation ...
28 Oct 2017 - Taking into account the PRAC Assessment Report on the PSUR(s) for diacerein, the scientific ... Based on the information presented in this PSUR, PRAC considered that section 4.8 of the Summary of. Product ... Amendments to be included i