26 February 2018 EMA/49414/2018 Human Medicines Research and Development Support Division

EMA/EC multi-stakeholder workshop to further improve the implementation of the paediatric regulation 20 March 2018

30 Churchill Place ● Canary Wharf ● London E14 5EU ● United Kingdom Telephone +44 (0)20 3660 6000 Facsimile +44 (0)20 3660 5510 Send a question via our website www.ema.europa.eu/contact

An agency of the European Union

© European Medicines Agency, 2018. Reproduction is authorised provided the source is acknowledged.

Background and objectives Background The European Commission (EC) highlighted in its report on 10 years of the EU Paediatric Regulation certain areas for specific actions to better foster the development and availability of medicines for children in Europe. This workshop is a crucial step for the development of a concrete plan to address the challenges identified.

Main objectives of the workshop: •

To learn from experiences and ideas regarding criteria and methodologies that could be used to identify diseases/conditions of unmet paediatric medical needs



To exchange ideas on measures to proactively address obstacles to timely completion of paediatric investigation plans (PIPs)



To identify operational challenges in relation to paediatric procedures and exchange ideas for process improvements



To inform stakeholders about ongoing and future initiatives of international collaboration of regulators for paediatric medicine development



To inform stakeholders about planned transparency measures regarding clinical research and new medicines for children

EMA/EC multi-stakeholder workshop to further improve the implementation of the paediatric regulation EMA/49414/2018

Page 2/8

Draft Programme1 Item

Topic

08:00

Arrival and registration

09:00

Introduction Welcome address Video message from the Commissioner Video message from Member of EU Parliament Workshop objectives

09:30

Topic 1 Identification of paediatric medical needs – Methodology 1. Unmet medical needs – the bigger picture (tbc) 2. Stakeholders’ perspective on development of methodology: •

Which ongoing initiatives to identify paediatric medical needs are you working on or aware of?



Which criteria and methodology would you suggest to prioritise diseases/conditions of unmet paediatric needs?

2.1.

Patients

2.2.

Academia / health care professionals

2.3.

Industry

3. Discussion 4. Summary 11:45

Topic 2 International cooperation of regulators for paediatric medicines 1. Better together – international regulatory cooperation 2. Discussion

12:15

Lunch

13:00

Topic 3 Timely completion of paediatric investigation plans (PIPs) 1. Stakeholders’ perspective on measures to improve timely PIP completion: •

Which elements have been experienced as obstacles to a timely completion of the studies of an agreed paediatric development plan?

• 1

Which measures could be taken to proactively address these obstacles hence

Updates to this draft programme will be published in the coming weeks.

EMA/EC multi-stakeholder workshop to further improve the implementation of the paediatric regulation EMA/49414/2018

Page 3/8

Item

Topic leading to an increased compliance with the agreed plan? 1.1.

Academia / health care professionals

1.2.

Patients

1.3.

Industry

1.4.

Clinical Trials Facilitation Group (tbc)

2. Discussion 3. Summary 14:30

Coffee break

14:50

Topic 4 Improving the handling of PIP applications 1. Stakeholders’ perspective (10’ each) on overcoming operational challenges in relation to paediatric procedures: •

Which procedural and operational challenges in relation to paediatric processes as described in the PIP guideline (PIP, modification, waiver, compliance check) should be addressed?



What are constructive solutions that could facilitate efficient and robust operational framework (e.g. submission requirements, timelines, outputs and technical/administrative aspects)?

15:50

1.1.

Industry

1.2.

Academia

2.

Discussion

3.

Summary of main points

Topic 5 Transparency measures 1. Transparency measures regarding paediatric medicine development as planned by European Commission 2. Transparency improvements through Clinical Trials Regulation 3. Discussion

16:20

Conclusions and next steps

16:45

End of workshop

EMA/EC multi-stakeholder workshop to further improve the implementation of the paediatric regulation EMA/49414/2018

Page 4/8

Practical information Note to attendees

Practical information EMA/49414/2018

Page 5/8

Arrival at the Agency On arriving for your meeting at 30 Churchill Place, please report to reception where you will be issued with an access pass. This pass will allow you to access our industry lounge, which you are welcome to utilise during your visit. The industry lounge is located through the sliding doors to the right of the reception desk past the security turnstiles. Your EMA contact point will meet you here. The Agency requires all visitors to provide a valid photo ID on arrival, such as a passport, an identity card or driving licence.

Physical disability Let us know if you would like any specific help or information that would make your stay more comfortable. We will be very happy to help.

Registration We strongly advise you to arrive up to 45 to 30 minutes before the start of the workshop, to allow you time for registration and settling down.

Meeting room The plenary meeting will take place in the room 03-A. A seating plan will be provided.

Wi-Fi access & Laptop computers Wi-Fi is available throughout the EMA. Login details can be found on the back of your EMA access pass.

Recording and Photography The Agency records or broadcasts a number of its meetings, including some virtual meetings. This is part of the Agency's commitment to the principle of transparency as enshrined in the Treaty on the European Union. This workshop will be broadcast live and recorded. By attending this event you consent to any photographing, recording, broadcast and publication of presentations on the EMA website. For more information about processing of personal data by EMA, please visit the website: http://www.ema.europa.eu/ema/index.jsp?curl=pages/home/general/general_content_000516.jsp&mi d or contact [email protected]

Travel and Accommodation Participants must possess valid travel documents and, where relevant, a visa for entry into the United Kingdom. Should you require an official letter of invitation, please contact [email protected].

Conference venue European Medicines Agency 30 Churchill Place, Canary Wharf London E14 5EU, United Kingdom Telephone +44 (0)20 3660 6936 | Facsimile +44 (0)20 3660 5550 Practical information EMA/49414/2018

Page 6/8

Directions to European Medicines Agency and map of the area



By Underground

The nearest stop for Churchill Place is Canary Wharf station on the Jubilee Line. From East exit (NB. This is the closest exit to 30 Churchill Place): exit the station and turn left into Upper Bank Street, turn right at Canada Square and continue straight into Churchill Place. •

By Docklands Light Railway (DLR)

The Agency is a short walk from Canary Wharf station on the DLR. Services run from Bank, Tower Gateway, Lewisham, Stratford, King George V and Beckton. Exit into The South Colonnade, turn left towards Canada Square continuing straight into Churchill Place. •

By car

There are no parking facilities at 30 Churchill Place and it is recommended that you take public transport. However, four nearby public car parks are operated by Canary Wharf. Rates and further information can be found on the Canary Wharf website: http://www.canarywharf.com/aboutus/TheEstate/Travel-/Roads--Parking/ •

By Bus

Canary Wharf is serviced by local bus numbers D3, D7, D8, 135 and 277. •

River services

River services run between Embankment, London Bridge and Canary Wharf throughout the day. Canary Wharf pier is roughly a 15-minute walk from the European Medicines Agency. •

From London City Airport

Practical information EMA/49414/2018

Page 7/8

Take DLR City Airport to Canary Wharf (journey time is around 20 minutes). •

From Gatwick Airport

Take a mainline train to London Bridge, then the Jubilee Line to Canary Wharf (journey time around 50 minutes). •

From Heathrow Airport

Take the London underground Piccadilly Line to Green Park, change to the Jubilee Line to Canary Wharf (journey time around 1hr 20 minutes). Alternatively, take the Heathrow Express train to Paddington. From Paddington you can take the Circle or Bakerloo line to Baker Street, then the Jubilee Line to Canary Wharf (journey time around 1hr 20 minutes). Alternatively, you can take the Heathrow Express train to Paddington, then the District or Circle Line to Tower Hill then the Docklands Light Railway (DLR) to Canary Wharf (journey time around 1hr 30 minutes). •

From Stansted Airport

Take the Stansted Express to London Liverpool Street then the Circle Line to Tower Hill and change onto the DLR to Canary Wharf (journey time around 70 minutes). •

From Luton Airport

Take a first Capital Connect train to London Bridge then the Jubilee Line to Canary Wharf (journey time around 60 minutes). •

From St Pancras International train station

Take the Northern Line to London Bridge then the Jubilee Line to Canary Wharf (journey time around 45 minutes).

Contact Should you have any questions, please contact [email protected]

Practical information EMA/49414/2018

Page 8/8

Draft programme - EMA-EC multi-stakeholder workshop to further ...

Feb 26, 2018 - reception desk past the security turnstiles. Your EMA contact point will meet you here. The Agency requires all visitors to ... information can be found on the Canary Wharf website: http://www.canarywharf.com/aboutus/The-. Estate/Travel-/Roads--Parking/. •. By Bus. Canary Wharf is serviced by local bus ...

948KB Sizes 1 Downloads 140 Views

Recommend Documents

Programme Draft-8publicable.pdf
California Literary Anti-myth in Television's The OC”. Luis F. Díaz (UPV/EHU): “Damn it, Jack! They still Need You!: Jack Bauer as the Hero of a Never Ending ...

Draft Programme SOBEK 3_1 workshops.pdf
Draft Programme SOBEK 3_1 workshops.pdf. Draft Programme SOBEK 3_1 workshops.pdf. Open. Extract. Open with. Sign In. Main menu. There was a problem ...

Workshop programme June 2017 SV.pdf
Page 1 of 4. Research Workshop. EXTRATERRITORIALITY OF EU LAW & HUMAN RIGHTS AFTER. LISBON: SCOPE AND BOUNDARIES. Sussex European Institute – Freeman Building. University of Sussex - 13 & 14 July 2017. Draft programme. Day 1: 13 July 2017. 1-2pm. Reg

UKLVC draft programme 14 may v2.pdf
12.30 lunch posters 3 & business meeting. Contact and geographical variation. 14.00 23 Jonathan Morris. Phonetic variation in a long-term contact situation: /l/ ...

Programme 2017 EU GCP Inspectors Working Group Workshop
Sep 21, 2017 - EU Portal and Database: developments. Laura Pioppo. (EMA) ... Biosimilars – Assessor's perspective: Clinical key points. Krisztian Fodor.

Programme for Graduates_mail to
Our ever expanding business provides near limitless ... Maintain high performance standards during the entire tenure with XLD and of course, perform well in ...

Workshop Programme - Low inflation and its implications for ...
... Banca d'Italia, Via Nazionale 91, Rome – Italy. Page 2 of 2. Workshop Programme - Low inflation and its implications for Monetary Policy - 5 October 2015.pdf.

Programme for Graduates_mail to
degree from ITM. Irrespective of the option that you choose, the process for reimbursement remains the same: • Apply for Graduate Programme in the prescribed ...

4.1 MS Workshop Report- draft 3 - European Medicines Agency
Oct 9, 2017 - The MS registry landscape in Europe comprises regional and national registries that are broadly affiliated with one of ..... external systems. - Communication to patients to encourage enrolment. Recommendations. •. Raise awareness of

SAMWU to Seek Further Mandate -
Apr 18, 2018 - and final round of negotiations with the employer representative - The South ... All benefits linked to conditions of service to increase by the percentile ... 082 899 2169. Papikie Mohale, National Media Officer, 073 710 0356.

MANAGEMENT PROGRAMME
Define the concept of strategy. Explain the Boston. Consulting Group (BCG) model, General Electric. (GE) planning model and highlight their usefulness.

CONFERENCE PROGRAMME
Mar 21, 2016 - Faculty of Economics and Business. Working ... The Online Dispute Resolution as Contribution ... „Cloud computing" opportunities and.

CONFERENCE PROGRAMME
Mar 21, 2016 - Faculty of Economics and Business. Working language – ... the Role of the. Sharing Economy ... „Cloud computing" opportunities and obstacles.

CONFERENCE PROGRAMME
Mar 21, 2016 - ... Market – the Role of the. Sharing Economy ... sharing economy. 12,10 – 12,30 ... University of Zagreb. „Cloud computing" opportunities and.

Familiarisation programme to independent directors.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Familiarisation ...

MANAGEMENT PROGRAMME
The unrecognised union claimed that they have a following of 30-40 percent and almost all white collar staff are their followers. The ' Mill Workers Union ' served a notice on the. Administration with the following demands : (a) Foreman should be tra

Opposition to Petitioner's Motion to Compel Further Responses.pdf ...
Page 1 of 17. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. KAMALA D. HARRIS. Attorney General of California.

Draft 4.5.2: Complete Draft
community, guidelines to help data modellers and database designers, and part ...... C. J. Date, explores data modelling: the design of the fundamental sets qua ...... as a directed graph using open source software and automatically examined.

Listing of further issues
Nov 13, 2017 - C/1, G-Block, Bandra-Kurla Complex, Bandra (E), Mumbai 400 051, India. CIN: U67120MH1992PLC069769 Tel: +91 22 26598235/36 ...

Draft Agenda of the 2018 annual workshop of the European network of ...
Update on Enpr-EMA activities. 09:35. Report from the coordinating group (CG). Update on Enpr-EMA activities, achievements and challenges. For information.

Introduction to Psychotherapy Workshop SPEAKERS -
Limited parking spaces are available at the open car park. Prof Dr Azhar Md Zain. Dean & Senior Consultant Psychiatrist and. President of Malaysia Society ... 11.45 am Cognitive Intervention II: Modifying Automatic Thoughts & Beliefs. 12.30 pm Lunch

management programme
Note : Attempt any four questions. All questions carry equal marks. 1. (a) Material flow and information flow are equally important in the materials flow process. Why ? (b) Discuss the role of TQM in material management. Highlight the benefits. 2. (a