Facility construction will be undertaken in accordance with the long-range plan adopted by the Cleveland County Board of Education (the “board”) and the facility design approved by the board. Any repairs or renovations of school facilities should be undertaken in such a way as to minimize disruption of instructional time and the educational environment. A.

QUALITY OF CONSTRUCTION Buildings should be constructed with durable materials that, when possible, permit space to be adapted to various purposes and to be adjusted to changes in technology or the educational program. The board will not accept substandard construction. In the event of insufficient funding for a project, the board will defer implementing parts of the long-range plan.

B.

CHANGE ORDERS FOR CONSTRUCTION OR REPAIR WORK CONTRACTS 1.

All Contracts for Construction or Repair Work a.

Use of Change Orders After a contract for construction or repair work has been awarded, the need may arise to amend the terms, conditions, or specifications of the contract by a change order. Change orders may not be used or divided to evade bidding requirements or the requirements of this policy.

b.

Change Orders That Must be Reported to the Board Unless otherwise prohibited by statute or regulation, the superintendent or designee is authorized to approve change orders involving additive or deductive sums up to $100,000 so long as funding for the change order is available within the established project budget. The superintendent shall report to the board all change orders that were approved by the superintendent, including those that do not impact the contract amount. The report will be provided to board members in writing on a monthly basis or at the next board meeting and will include the following information: (1) the contractor’s name; (2) the project name; (3) a brief description of the change; (4) the contract amount, including amount(s) of any prior changes; and (5) the change order amount. The superintendent is not required to report any proposed change order that was denied by the superintendent or designee.

c.

Change Orders Requiring Board Approval

CLEVELAND COUNTY BOARD OF EDUCATION POLICY MANUAL

Page 1 of 2

Policy Code:

9030

Change orders that (1) involve amounts over $100,000, (2) are in excess of the remaining funds in the project budget, or (3) cause the total cost of a contract that has not been previously approved by the board to exceed $100,000, require board approval. The superintendent shall present all such proposed change orders that are recommended for approval to the board at a board meeting. The superintendent is not required to present to the board any change order not recommended for approval. If, in the superintendent’s opinion, a change order requires expedited review, the superintendent shall notify the board chair, who will decide whether a special meeting must be called to address the proposed change order before the next board meeting. 2.

Additional Requirements for Contracts in Excess of $300,000 When amendments to a contract in excess of $300,000 are necessary, the contractor shall submit a proposed change order in writing to the project architect/engineer for review. If the project does not have an architect/engineer, the change order must be submitted to the superintendent or designee. Any request for expedited review must also be in writing and accompany the proposed change order. The contract for construction projects in excess of $300,000 must specify the manner in which change orders will be submitted on those projects.

Legal References: G.S. 115C-521, -524 Cross References: Contracts with the Board (policy 6420), Planning to Address Facility Needs (policy 9000), Facility Design (policy 9020), Bidding for Construction Work (policy 9120) Adopted: September 26, 2016

CLEVELAND COUNTY BOARD OF EDUCATION POLICY MANUAL

Page 2 of 2

facility construction

Cleveland County Board of Education (the “board”) and the facility design ... to be adapted to various purposes and to be adjusted to changes in technology or ...

13KB Sizes 1 Downloads 242 Views

Recommend Documents

Facility Capacities.pdf
CHULA VISTA HIGH SCHOOL. Dance Room 86. Game/Meeting Room 86. Gymnasium 400. DISTRICT OFFICE. 1130 FIFTH AVE. Board Conference Room (by ...

Facility Location with Hierarchical Facility Costs∗ 1 ...
server locations, etc. ... We then focus on a subclass of submodular cost functions which we call .... Then facilities are the file servers, and clients are the users (or ...

Facility Planning.pdf
Page 1 of 30. Teater. Consulting. FACILITY MASTER PLANNING. Lake Pend Oreille School District. Sandpoint, Idaho. t. tM. aha. pix. M, Jan. T 5\. x1. M.

Facility Committee Meeting
Jan 6, 2015 - Administration asked that an ADA push pad be added at door 16. ... the associated systems meet current electrical code requirements. This was ...

Director - Facility Operations.pdf
Page 1 of 2. Job Description. Raytown Quality Schools. Director - Facility Operations. Purpose Statement. The job of Director - Facility Operations is done for the purpose/s of directing construction, maintenance. and grounds services; providing info

Facility Use Agreement.pdf
otherwise a permit to use district facilities does not give permission for the group to use district equipment such as. interactive whiteboards, computers, electronic ...

Facility Supervisors8.25.16.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Facility Supervisors8.25.16.pdf. Facility Supervisors8.25.16.pdf. Open. Extract. Open with. Sign In. Main me

Facility and Services.pdf
Y no sabes rectificar. Si puedes definir. el odio o el amor. Amigo que desilusión. No todo es blanco,. O negro: es gris. Todo depende del matiz,. Busca y aprende a distinguir. La luna puede calentar. Whoops! There was a problem loading this page. Re

Emergency facility video-conferencing system
Oct 24, 2008 - tors Telehealth Network, Inc.'s Preliminary Invalidity Contentions. Under P.R. 3-3 and Document ... Care Costs, An Evaluation of a Prison Telemedicine Network,. Research Report, Abt Associates, Inc., ..... with a camera mount enabling

- Facility Use Application.pdf
Program (TULIP), effective April 1, 2012. The public school is not required to extend its own liability insurance to the tenant user. If the tenant user elects to.

Facility Use Form.pdf
Akhir September, Skema Pajak Toko Online Selesai. Page 2 of 2. Facility Use Form.pdf. Facility Use Form.pdf. Open. Extract. Open with. Sign In. Main menu.

Facility Age Guidelines.pdf
Facility Age Guidelines. July 14, 2016. Page 1 of 1. Facility Age Guidelines.pdf. Facility Age Guidelines.pdf. Open. Extract. Open with. Sign In. Main menu.

national facility survey
Email: [email protected] ... Field Identification (List your ballfields 1-20) Use additional forms if more than 20 fields. 1. 2 ... Is telephone service available?

Chehalis Generation Facility
Houston, Texas 77056 ○ Phone: 713.636.0000 ○ Fax: 713.636.1345. Chehalis Power Generating, LLC. Chehalis ... Tel: 360.748.1300. Fax: 360.740.1891.

Emergency facility video-conferencing system
Oct 24, 2008 - Based on Wireless Communication Technology Ambulance, IEEE. Transactions On ..... Tandberg Features, Tandberg Advantage.' Security ...

- Facility Use Application.pdf
Facility Use Application.pdf. - Facility Use Application.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying - Facility Use Application.pdf. Page 1 of 9.

Facility and Services.pdf
Whoops! There was a problem loading more pages. Retrying... Facility and Services.pdf. Facility and Services.pdf. Open. Extract. Open with. Sign In. Main menu.

Older Facility Recommendations.pdf
Page 1. Whoops! There was a problem loading this page. Retrying... Whoops! There was a problem loading this page. Retrying... Older Facility Recommendations.pdf. Older Facility Recommendations.pdf. Open. Extract. Open with. Sign In. Main menu. Displa

Facility Committee Meeting
architectural firm. Mr. Trimberger contacted references for the firms that had extensive high school experience. From the 13 submitted, the Administration brought ...

Emergency facility video-conferencing system
Oct 24, 2008 - Health Service Based at a Teaching Hospital, 2 J. of Telemed. &. Telecare .... BBI Newsletter, Welcome to the ROC (Remote Obstetrical Care),. BBI Newsl., vol. ...... (IR) beam transmission for sending control signals to the.

Automation of Facility Management Processes ... - Semantic Scholar
device connectivity), ZigBee (built on top of IEEE 802.15.4 for low-power mon- itoring, sensing, and ... by utilizing the latest wireless and Internet technologies, M2M is ultimately more flexible, .... administer the machines hosting the M2M modules