Older Facility Recommendations and the 2015-25 CIP
Key Elements of Older Facility Recommendations (included in the 2015-25 CIP Recommendation) •
The recommendations are for a comprehensive program that focuses on the district’s ten oldest schools that accommodate almost 50% of district students.
•
Facility recommendations include: Correction of building code violations; Improved safety by consolidating operations and controlling entry; Indoor air quality deficiencies and health concerns addressed; Replacement of malfunctioning mechanical equipment; Relief of traffic congestion problems; Deconstruction of some inefficient buildings; Extending the life of the schools.
•
Implementation of the recommendations eliminate mobile classrooms (also in need of renovations) while providing additional student capacity. Elementary school capacity increase = 555. High school capacity increase = 230 +/-
•
Increased student capacity would result in deferment of new elementary school and high school additions well beyond the ten-year CIP window. Board requesting the redirection of $57.6 million in projected capital expenditures for new schools towards “Phase 2” older facility recommendations. Delays significant operational increases with opening a new school.
•
Bond funds and future capital funds directed to the ten oldest schools will make available CIP (Paygo) revenue for needed maintenance at district’s other “newer” schools that are 20-30 years of age.
Chapel Hill-Carrboro City Schools 750 S. Merritt Mill Road – Chapel Hill, NC 27516 ~ 919-976-8211 ~ http://www.chccs.k12.nc.us 750 S. Merritt Mill Road – Chapel Hill, NC 27516 | 919-967-8211 x28227 | http://www.chccs.k12.nc.us
CHAPEL HILL ‐ CARRBORO CITY SCHOOLS Facilities Assessment of Oldest Schools School Name Scope of Work
Est. Cost
Phasing Plan and Funding Source
‐ Eliminates dead‐end corridors in 100 wing by deconstruction and building new academic wing CARRBORO ‐ Provide a new administration suite & main entrance ELEMENTARY ‐ Moves queuing off of the road ‐ Increase capacity by 52 seats
$13.55M
Phase 3 Unfunded Future Capital
$52.41M
Phase 1 Potential 2016 BOND Referendum
$5.80M
Phase 3 Unfunded Future Capital
$15.54M
Phase 2 Request Access to Planned New Schools Funds
$16.73M
Phase 2 Request Access to Planned New Schools Funds
$5.48M
Phase 3 Unfunded Future Capital
$0.82M
Phase 1 Potential 2016 BOND Referendum
$22.62M
Phase 1 Potential 2016 BOND Referendum
‐ Deconstruct all of Building "A" ‐ Creates a new entry/ admin suite that is accessible and secure CHAPEL HILL ‐ Addresses oldest building and major mechanical issues HIGH SCHOOL ‐ Connects more of the campus ‐ Increases capacity by 105 seats CULBRETH MIDDLE
‐ Renovate existing building
‐ Renovate & reorganize the layout of the main building ‐ Relocated the administration suite to the street front & provide a EPHESUS new main entry ELEMENTARY ‐ Provide additional program space to eliminate mobiles & bring school up to space standards ‐ Increase capacity by 137 ‐ Provide an administration addition at front to provide necessary staff space as well as a secure main entry ‐ Classroom wing deconstruction and addition at rear of the school ESTES HILLS ‐ Enclose breezeways to connect all classrooms with interior ELEMENTARY corridors ‐ Provide new queuing configuration ‐ Increase capacity by 58 seats ‐ Renovate admin area and main building lobby FRANK PORTER ‐ Add new lobby entry for security and additional admin space GRAHAM ‐ Provide more prominent front door and secure main entrance ELEMENTARY ‐ Renovate existing buildings ‐ Maintain existing buildings GLENWOOD ‐ Provide small administrative addition to Provide secure main ELEMENTARY entrance and necessary staff space
LINCOLN CENTER
‐ Deconstruct the existing Lincoln Center ‐ Construct a building to house both Pre‐K program & new central office ‐ Increase elementary capacity by 189 ‐ Increase high school capacity by 50 ‐ 100
PHILLIPS MIDDLE
‐ Renovate existing building ‐ Provide additional program space to meet space standards including increasing the admin suite to provide a secure main entry
‐ Deconstruct the five classroom pod ‐ Renovate the existing buildings SEAWELL ‐ Provide additional program space to meet space standards &replace ELEMENTARY deconstructed classrooms ‐ Incrase capacity by 119 Preliminary Construction Phasing & Temp. Facilities Cost: Total Estimated Cost:
$9.40M
$15.74M
$2.98M $161.08M
Phase 2 Request Access to Planned New Schools Funds Phase 2 Request Access to Planned New Schools Funds
Page 1. Whoops! There was a problem loading this page. Retrying... Whoops! There was a problem loading this page. Retrying... Older Facility Recommendations.pdf. Older Facility Recommendations.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Older Facility Recommendations.pdf. Page 1 of 8.
server locations, etc. ... We then focus on a subclass of submodular cost functions which we call .... Then facilities are the file servers, and clients are the users (or ...
Cleveland County Board of Education (the âboardâ) and the facility design ... to be adapted to various purposes and to be adjusted to changes in technology or ...
Jan 6, 2015 - Administration asked that an ADA push pad be added at door 16. ... the associated systems meet current electrical code requirements. This was ...
Page 1 of 2. Job Description. Raytown Quality Schools. Director - Facility Operations. Purpose Statement. The job of Director - Facility Operations is done for the purpose/s of directing construction, maintenance. and grounds services; providing info
otherwise a permit to use district facilities does not give permission for the group to use district equipment such as. interactive whiteboards, computers, electronic ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Facility Supervisors8.25.16.pdf. Facility Supervisors8.25.16.pdf. Open. Extract. Open with. Sign In. Main me
Y no sabes rectificar. Si puedes definir. el odio o el amor. Amigo que desilusión. No todo es blanco,. O negro: es gris. Todo depende del matiz,. Busca y aprende a distinguir. La luna puede calentar. Whoops! There was a problem loading this page. Re
Oct 24, 2008 - tors Telehealth Network, Inc.'s Preliminary Invalidity Contentions. Under P.R. 3-3 and Document ... Care Costs, An Evaluation of a Prison Telemedicine Network,. Research Report, Abt Associates, Inc., ..... with a camera mount enabling
Program (TULIP), effective April 1, 2012. The public school is not required to extend its own liability insurance to the tenant user. If the tenant user elects to.
Akhir September, Skema Pajak Toko Online Selesai. Page 2 of 2. Facility Use Form.pdf. Facility Use Form.pdf. Open. Extract. Open with. Sign In. Main menu.
Facility Age Guidelines. July 14, 2016. Page 1 of 1. Facility Age Guidelines.pdf. Facility Age Guidelines.pdf. Open. Extract. Open with. Sign In. Main menu.
Email: [email protected] ... Field Identification (List your ballfields 1-20) Use additional forms if more than 20 fields. 1. 2 ... Is telephone service available?
consumer.ftc.gov. Dietary Supplements: Health ... Displaying Dietary Supplements_ Health Information for Older People _ Consumer Information.pdf. Page 1 of 2.
Facility Use Application.pdf. - Facility Use Application.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying - Facility Use Application.pdf. Page 1 of 9.
Whoops! There was a problem loading more pages. Retrying... Facility and Services.pdf. Facility and Services.pdf. Open. Extract. Open with. Sign In. Main menu.