FMOTS Project Tracking Spreadsheet 2017-2018 FY

PROJECT DESCRIPTION

ESTIMATED COST

ESTIMATED COMPLETION START DATE DATE

NOTES

Actual Total Cost

Approval Required By Department of State Architect (DSA) Lighting (w/ Battery Back-up

$450,000.00

FMS Cafeteria Equipment & Remodel HVAC LGE, FMS, HS Pending Legal (LGE: 1-16 & Cafeteria; FMS: 7-17 & Cafeteria; GHS: Review of Contract 20,30,50 music,60 AG & Cafeteria, Gym AC) FMS Shaded Eating Area $55,000.00

09/22/2017

7/31/2018

09/01/2017

4/1/2018

09/22/2017

Summer 2018

11/6/2017

Bleachers Additional Seats

11/7/2017

Stadium ADA Ramp

11/7/2017

All Weather Track

11/7/2017

FMS Admin Building: Upgrade Restroom ADA Compliant

7/1/2016

First Read for contract with IES - lGS and FMS 1,167,000

06/30/2018

Drilling Delayed, Solar Project is under way, with heavy equipment work pending PG&E tenatively scheduled for Spring Break 2018 Review of their systems.

NON-DSA PROJECTS Painting add building #s; repaint lines on all courts and playgrounds Softball Dugouts Fencing Prob 39 LED Retrofit- Interior

$5,000

$ 449,878.52

Need to meet with Nutrition Services Dept. Fact-finding; meeting with the City: MED spoke with Jeff Fact-finding; meeting with the City: MED spoke with Jeff Fact-finding; meeting with the City: MED spoke with Jeff Speaking to the administrator about what needs to happen in order to make the restroom ADA compliant. Discuss at at the October 2, 2017

Follow up needed

Solar

Estimated completion date July, 2018. Equipment purchased - remodel in progress: Construction Costs $24,760

06/30/2018

Summer 2018

10/31/2017 12/15/2017

In Progress 1

Preparing the plan to get bids - Trini & Mary meet 1/31/2018 to discuss plan and timelines Vendor discussion under way

FUNDING SOURCE

Farm: Security Cameras Marque FMS

Researching need wireless access $15,000.00

Stadium Scoreboard

Remodel - Boy Locker Rooms GHS

Remodel - Girls Locker Room GHS

GHS Bldg 24 & 25 New Windows Boiler Replacement Girls Locker Room GHS A.C. in MDF Room @ FMS Electronic Gate at the Stadium

FMOTS Project Tracking Spreadsheet 2017-2018 FY

9/25/2017

In Progress

9/25/2017

Quote $15,000 $10,000 + Installation. Pending review of upgrade to stadium

9/25/2017 Investigating - deep cleaning and replacement of shower heads and lockers Investigating - deep cleaning and replacement of shower heads and lockers $12,054.57 $8,000.00

GHS Farm (roof, drainage)

11/3/2017

In Progress

Vendor scheduled for walk-thru 2nd week of February

11/3/2017

In Progress

Vendor scheduled for walk-thru 2nd week of February

1/2/2018 9/1/2017 1/1/2018

In Progress In progress In Progress

Windows installed, but need correction Calls being made to get pricing as of 1/31/2018

9/1/2017

Window coverings for all rooms

Purchased 2016

Water Filtration Systems: Installation at GHS, Joint Use Gym, FMS, LGE & Somavia

$5,000.00

Charge to Tech budget.

06/01/2018 06/30/2018

10/1/2017

06/30/2018

Replace PE Lockers GHS Boys & Girls Locker rooms

12/1/2017

07/31/2017

Increase # of Security Cameras - all sites

10/27/2017

Discovery phase, considering best option Draining complete - Roof will be completed when animals are not present Some coverings are in, need all and then installation will take place during the summer to not disrupt class Grant awarded for 4 sites, 5th site payment will come from general fund Vendor scheduled for walk-thru 2nd week of February Completed a facilities walk with Director of MOT and Site Principals @ GHS & FMS Magnets received Need installation

Replace magnets on all doors all sites Curtains for LGES stage Cafeteria Sound system LGE

COMPLETED PROJECTS Stadium: Press Box Lighting for Stairs

9/25/2017

09/30/2017 2

Complete

$

12,054.57

FMOTS Project Tracking Spreadsheet 2017-2018 FY

GHS Quad Bathroom Stalls Raised in Boys Bathroom

$7,300.00

10/20/2017

10/28/2017

Complete

$7,300

Air curtains-All cafeterias Pre-school Concrete Addition Building Removal/ Replacement Portable #75 GHS LGES-Rm 14B. Window LGES-Rm 14A. Window

$11,000.78 $1,680.00 $66,140.00 $4,200.00 $6,385.00

09/08/2017 09/01/2017 11/20/2017 9/22/2017 9/22/2017

Complete Complete On DSA list for approval Completed Completed

$11,001 $1,680 $66,140 $4,200 $6,385

Tree Removal

$7,600.00

10/1/2017

$35,179.00 $21,470.00 $35,000.00 $55,597.00 $7,800.00 $809,406.35

11/20/2017 09/01/2017 9/1/2017 10/15/2017 9/1/2017

09/21/2017 11/23/2017 11/23/2017 9/30/2017 10/15/2017 1/20/2018 1/27/2018 12/30/2017 3/30/2018 1/3/2018 12/31/2017 09/28/2017

Replace FMS Gutters FMS Cafeteria Flooring & Grease Trap Remodel FMS Portable Farm Road GHS Farm Lights Total Cost Completed Pending direction Fact-Finding

3

Completed Completed Completed On DSA list for approval Completed Completed

$

7,600.00

$ 35,179.00 $ 18,768.00 $ 50,000.00 $ 55,597.00 $ 7,800.00 $ 733,582.87

Facility Project Spreadsheet - February 2018.pdf

Page 1 of 3. FMOTS Project Tracking Spreadsheet. 2017-2018 FY. PROJECT DESCRIPTION ESTIMATED. COST. ESTIMATED. START DATE. COMPLETION. DATE NOTES Actual Total. Cost. FUNDING. SOURCE. Approval Required By Department of State Architect (DSA). Lighting (w/ Battery Back-up $450,000.00 ...

16KB Sizes 0 Downloads 117 Views

Recommend Documents

spreadsheet
Jul 20, 2015 - Open a new excel worksheet. 2. Enter labels for column ...... Eg. In a cell that is used to enter bank account number we can invoke a message ...

Spreadsheet - Latihan.pdf
... и 3-НДФЛ их нужно составлять в 2-х экземплярах- один отдавать в. Как. получить налоговый вычетза обучение?. подготовить декларацию 3-НДФЛ

Facility Capacities.pdf
CHULA VISTA HIGH SCHOOL. Dance Room 86. Game/Meeting Room 86. Gymnasium 400. DISTRICT OFFICE. 1130 FIFTH AVE. Board Conference Room (by ...

Facility Location with Hierarchical Facility Costs∗ 1 ...
server locations, etc. ... We then focus on a subclass of submodular cost functions which we call .... Then facilities are the file servers, and clients are the users (or ...

facility construction
Cleveland County Board of Education (the “board”) and the facility design ... to be adapted to various purposes and to be adjusted to changes in technology or ...

Facility Planning.pdf
Page 1 of 30. Teater. Consulting. FACILITY MASTER PLANNING. Lake Pend Oreille School District. Sandpoint, Idaho. t. tM. aha. pix. M, Jan. T 5\. x1. M.

Facility Committee Meeting
Jan 6, 2015 - Administration asked that an ADA push pad be added at door 16. ... the associated systems meet current electrical code requirements. This was ...

Director - Facility Operations.pdf
Page 1 of 2. Job Description. Raytown Quality Schools. Director - Facility Operations. Purpose Statement. The job of Director - Facility Operations is done for the purpose/s of directing construction, maintenance. and grounds services; providing info

Facility Use Agreement.pdf
otherwise a permit to use district facilities does not give permission for the group to use district equipment such as. interactive whiteboards, computers, electronic ...

Facility Supervisors8.25.16.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Facility Supervisors8.25.16.pdf. Facility Supervisors8.25.16.pdf. Open. Extract. Open with. Sign In. Main me

Facility and Services.pdf
Y no sabes rectificar. Si puedes definir. el odio o el amor. Amigo que desilusión. No todo es blanco,. O negro: es gris. Todo depende del matiz,. Busca y aprende a distinguir. La luna puede calentar. Whoops! There was a problem loading this page. Re

Emergency facility video-conferencing system
Oct 24, 2008 - tors Telehealth Network, Inc.'s Preliminary Invalidity Contentions. Under P.R. 3-3 and Document ... Care Costs, An Evaluation of a Prison Telemedicine Network,. Research Report, Abt Associates, Inc., ..... with a camera mount enabling

- Facility Use Application.pdf
Program (TULIP), effective April 1, 2012. The public school is not required to extend its own liability insurance to the tenant user. If the tenant user elects to.

Facility Use Form.pdf
Akhir September, Skema Pajak Toko Online Selesai. Page 2 of 2. Facility Use Form.pdf. Facility Use Form.pdf. Open. Extract. Open with. Sign In. Main menu.

Facility Age Guidelines.pdf
Facility Age Guidelines. July 14, 2016. Page 1 of 1. Facility Age Guidelines.pdf. Facility Age Guidelines.pdf. Open. Extract. Open with. Sign In. Main menu.

national facility survey
Email: [email protected] ... Field Identification (List your ballfields 1-20) Use additional forms if more than 20 fields. 1. 2 ... Is telephone service available?

Chehalis Generation Facility
Houston, Texas 77056 ○ Phone: 713.636.0000 ○ Fax: 713.636.1345. Chehalis Power Generating, LLC. Chehalis ... Tel: 360.748.1300. Fax: 360.740.1891.

Emergency facility video-conferencing system
Oct 24, 2008 - Based on Wireless Communication Technology Ambulance, IEEE. Transactions On ..... Tandberg Features, Tandberg Advantage.' Security ...

- Facility Use Application.pdf
Facility Use Application.pdf. - Facility Use Application.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying - Facility Use Application.pdf. Page 1 of 9.

Facility and Services.pdf
Whoops! There was a problem loading more pages. Retrying... Facility and Services.pdf. Facility and Services.pdf. Open. Extract. Open with. Sign In. Main menu.