Kalamazoo Area Transportation Study FY 2014 - 2017 Transportation Improvement Program 6/26/2013 (10/22/2014) Required Fields

Fiscal Year 2015

2015

County Kalamazoo

Kalamazoo

Responsible Agency KCRC

Project Name Limits Texas Drive Al Sabo Preserve to 12th Trail Street

KCRC

8th Street at U 8th Street at U Avenue Avenue

Length

Primary Work Type

2.50

Roadside facility

0.000

Traffic ops/safety

Project Description Construct a 10-ft wide non motorized pathway Construct CLTL on U Ave, Improve Sight Distance, Curb Radii, Modifications of OH Flashing Beacon and Relocation of Utility Poles

Phase

350

TA

CON

170

4 to 3 ane conversion from Wallace Ave to Craft Ave, install CLTL from E. Michigan Ave CON to Wallace Ave. Upgrade 3 signals.

Kalamazoo

KCRC

East Main Street

East Main Street from East Michigan Ave to Sprinkle Road

2.038

Traffic ops/safety

2015

Kalamazoo

MDOT

I-94

East of Kilgore Road to Sprinkle Road

1.280

Preparation of I-94 Contract 5 design build New Route/Structure documents for reconstructing and widening PE (Capacity Increase) I-94 from 4 lanes to 6 lanes

MDOT

Trukline Traffic Operations and Regionwide Safety GPA

2015

Kalamazoo

Kalamazoo

MDOT

I-94

Lovers Lande to east of Kilgore Road

1.88

GPA

Trunkline Traffic Operations and Safety

New route/structure (capacity increase)

Preparation of I-94 Contract 4 design build documents for reconstructing and widening PE I-94 from 4 lanes to 6 lanes

Kalamazoo

KCRC

42nd St

Y Ave to W Ave

2.01

Reconstruct

2015

Kalamazoo

MDOT

I-94

at E Michigan Ave (40th Street)

1.03

Restore & rehabilitate Interchange reconfiguration

PE

2016

Kalamazoo

Public Transit

Vehicle Replacement

Demand Response

Transit vehicle additions/replacemen Up to 6 Demand response ts

T-Cap

M-43

M-43 from US-131 to Stadium Drive (I-94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street

M-43

M-43 from US-131 to Stadium Drive (I-94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street

2015

2016

Kalamazoo

Kalamazoo

Kalamazoo

MDOT

MDOT

MDOT

I-94 BL

East of Seneca Rd to Rambling Rd

4.634

4.634

2.76

Resurface

Resurface

Reconstruct

CON

2016

2015

Federal Fund Source

CON

2015

2015

Advance Construct

Federal Cost ($1000s)

CON

Cold Milling and HMA resurfacing with ADA PE sidewalk ramps

Cold Milling and HMA resurfacing with ADA ROW sidewalk ramps

CON

State Cost ($1000s)

Total Phase Cost ($1000s)

MDOT Job No.

Local ID No.

MPO/ Rural Action Date

Amendment Type

Air Quality

Comments Addition of project, state cost provided by DNR grant;

Total Project Cost ($1000s)

TWP

701

122222

Add

E

STH

43

CNTY

213

120524

Add

E

Addition of project

213

600

STH

70

CNTY

670

120523

Add

E

Addition of project

670

246

NH

54

M

300

126002

Add

NE

Addition of project

300

5

ST

1

M

5

Add

E

Addition of project

5

246

NH

54

M

300

Add

NE

Addition of project

300

920

82

33

1,842

M

Local Cost ($1000s)

Local Fund Source

105

713

246

State Fund Source

STL

NH

NH

Resurface

Resurface and repair roadway

NH

4.634

Resurface

Cold Milling and HMA resurfacing with ADA CON sidewalk ramps

2,043

NH

593

STH

207

CNTY

18

357

2016

Kalamazoo

MDOT

M-43

M-43 from US-131 to Stadium Drive (I-94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street

2015

Kalamazoo

KCRC

Sprinkle Rd

E Michigan Ave to E Main St

1.00

Traffic ops/safety

Concrete shoulders and median, superelevation modifications, centerline and CON shoulder rumble strips; mill and overlay

2015

Kalamazoo

MDOT

I-94

east of Portage Road to west of Sprinkle Road in the City of Kalamazoo, Kalamazoo County

1.20

Widen - major (capacity increase)

Road reconstruction and widening and reconstruction and widening of 2 railroad bridges and a large culvert

ROW

41

HPSL

8

2015

Kalamazoo

MDOT

I-94

east of Portage Road to west of Sprinkle Road in the City of Kalamazoo, Kalamazoo County

1.20

Widen - major (capacity increase)

Road reconstruction and widening and reconstruction and widening of 2 railroad bridges and a large culvert

SUB

82

HPSL

16

453

920

120244

06/26/13

Cost

E

Kalamazoo County Road Commission; Additional funding from RTF, ST change from $650,000 to $712,805, Local Cost from $280,000 to $207,195;

0

112614

03/18/14

Delete

E

Move to FY 2014 (Administrative Adjustment) 3/18/14; Deletion of project, duplicate obligated in FY2014 10/28/14;

120238

06/26/13

Delete

E

$62,805 Federal STP; $10,577 EDD; $4,523.13 CTF; $675.87 TRAL; Deletion of project, funded through RTF Set aside,

234

E

Addition of project 7/30/14; Scope change from US-131 to Stadium Drive (I-94BL) to M-43 from US-131 to Stadium Drive (I94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street, admin change to total project cost 10/28/14;

2,636

E

Addition of project 7/30/14; Scope change from US-131 to Stadium Drive (I-94BL) to M-43 from US-131 to Stadium Drive (I94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street, admin change to total project cost 10/28/14;

2,636

E

Change in Primary Work Type from Reconstruct to Resurface, Change Fed cost from $4526420 to $1,841,625, Change State Cost from $1,003,720 to $408,375 7/30/14; Limit change, reduction in state share from $408,375 and addition of City share 9-24-14; Correction in length of project to 2.762 10/28/14;

2,781

2,636

100

7

40

M

51

CITY

M

125999

701

2,250

123262

123262

113129

07/30/14

07/30/14

09/24/14

Scope

Scope

Scope

11,100

2,496

123262

07/30/14

Scope

E

Addition of project 7/30/14; Scope change from US-131 to Stadium Drive (I-94BL) to M-43 from US-131 to Stadium Drive (I94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street, admin change to total project cost 10/28/14; Kalamazoo County Road Commission; Admin FY Change to 2015 from 2014 10/28/14;

659

66

CNTY

659

119575

06/26/13

Year

E

M

1

CITY

50

105886

12/04/13

Year

NE

Addition of Project 12/4/13, Change in FY to 2015

500

M

2

CITY

100

105886

12/04/13

Year

NE

Addition of Project 12/4/13, Change in FY to 2015

500

Kalamazoo Area Transportation Study FY 2014 - 2017 Transportation Improvement Program 6/26/2013 (10/22/2014) Required Fields

Fiscal Year

County

Responsible Agency

2015

Kalamazoo

MDOT

2015

Kalamazoo

MDOT

2015

2015

Kalamazoo

Van Buren

Project Name

Limits east of Lovers Lane to east of Portage Road in Kilgore / W I-94 the cities of Kalamazoo Ramp and Portage, Kalamazoo County east of Lovers Lane to east of Portage Road in Kilgore / W I-94 the cities of Kalamazoo Ramp and Portage, Kalamazoo County

Length

Primary Work Type

Project Description

Phase

Advance Construct

Federal Cost ($1000s)

Federal Fund Source

State Cost ($1000s)

State Fund Source

Air Quality

Comments

Total Project Cost ($1000s)

ROW

41

HPSL

8

M

1

CITY

50

105885

12/04/13

Year

NE

Addition of Project 12/4/13; Change in FY to 2015

500

1.16

Widen - major (capacity increase)

Roadway reconstruction and widening and interchange reconstruction

SUB

82

HPSL

16

M

2

CITY

100

105885

12/04/13

Year

NE

Addition of Project 12/4/13, Change in FY to 2015

500

2,781

MDOT

I-94 BL

east of Seneca to Michigan Avenue

2.76

Resurface

Resurface and repair roadway

ROW

MDOT

M-40

at the intersection of 62nd St, 32nd St and CR 653

0.500

Reconstruct

Construct Roundabout

PE

8

NH

2

119

CM

26

M

I-94

Westbound I-94 from ML Ave E to Michigan Ave E

7.32

Resurface

Cold Milling & Bituminous Overlay

CON

2,287

IM

254

M

2015

Kalamazoo

MDOT

US-131

I-94 to Shaver Road

6.575

Restore and Rehabilitate

Multi course HMA overlay

CON

9,560

NH

1,920

M

MDOT

M-40

at the intersection of 62nd St, 32nd St and CR 653

0.500

Reconstruct

Construct Roundabout

ROW

82

CM

18

MDOT

I-94

Westbound I-94 from Miller to 40th Street

7.47

Resurface

Widen Shoulder

CON

HSIP

157

Kalamazoo

Local ID No.

Amendment Type

Roadway reconstruction and widening and interchange reconstruction

MDOT

2016

MDOT Job No.

MPO/ Rural Action Date

Widen - major (capacity increase)

Kalamazoo

Van Buren

Total Phase Cost ($1000s)

1.16

2015

2016

Local Cost ($1000s)

Local Fund Source

1,415

M

0

200

0

CITY

CITY

10

113129

09/24/14

Year

E

Addition of project; Advance Construct Conversion in 2014 ($8,185 NH Funds); Construct in 2016 6/29/11; Moved from FY 2013 11/28/12; Change in Primary Work Type from Reconstruct to Resurface 7/30/14; Limit change and addition of City share 9-24-14; Admin correction in total project cost to $2,781,271 and FY change to 2015 10/28/14;

145

124079

07/30/14

Year

E

Addition of project 7/30/14; Admin JN change to 124079 from 120479 9-17-14; Admin FY Change to 2015 10/28/14;

1,355

2,541

122066

03/26/14

Year

E

Addition of Project 3/26/14, Admin change in FY from 2016 to 2015 10/28/14;

2,600

11,680

116399

09/24/14

Year

E

Addition of project 7/30/14; Change in Scope to I-94 to Shaver Road 9-24-14; Admin change to FY and total project cost to $12,780,000 10/28/14;

12,780

100

124079

07/30/14

Year

E

Addition of project 7/30/14; Admin JN change to 124079 from 120479 9-17-14; Admin FY Change to 2016 10/28/14;

1,355

1,572

116718

06/26/13

Year

E

Admin FY change from 2017 to 2016 10/28/14;

1,660

KATS-November TIP Amendments.pdf

Page 1 of 2. Required Fields. Fiscal. Year County. Respon- sible. Agency Project Name Limits Length. Primary Work. Type Project Description Phase. Advance. Construct. Federal. Cost. ($1000s). Federal. Fund. Source. State Cost. ($1000s). State. Fund. Source. Local Cost. ($1000s). Local. Fund. Source. Total. Phase Cost.

51KB Sizes 1 Downloads 187 Views

Recommend Documents

Vocabulary Tip Sheet - USCIS
to act like, to call yourself. Long words administratively ... objects with the one in the center highlighted. Staying with the ... Center at www.uscis.gov/citizenship.

TIP Model™ Overview - Transition to Independence Process (TIP)
and responsibilities, future career and educational goals, self-management of behavior and substance use, and development and ... See how many of the TIP guidelines you can identify being applied in this work with Kendra. ... community college progra

Tip #5 - Yoshikai Elementary School
explanation. Tip #5: Think analytically. Find more information ... For example, the reading test may ask students to answer questions like these about a text/topic:.

Tip #5 - Yoshikai Elementary School
explanation. Tip #5: Think analytically. Find more information ... For example, the reading test may ask students to answer questions like these about a text/topic:.

Commenting Tip Sheet.pdf
Can. you rewrite this sentence? Can you provide specific details to show what you. mean here? o Instead of confusing, try: I'm not sure I know what your ...

EMS SCALER TIP C.pdf
Page 3 of 3. EMS SCALER TIP C.pdf. EMS SCALER TIP C.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying EMS SCALER TIP C.pdf. Page 1 of 3.

Kurzweil Tip Sheet.pdf
Whoops! There was a problem loading more pages. Retrying... Kurzweil Tip Sheet.pdf. Kurzweil Tip Sheet.pdf. Open. Extract. Open with. Sign In. Main menu.

Typical restaurant tip
Page 1. 4. 3. 75% 0.75. 3. 20. 15% 0.15. Typical restaurant tip. Page 2. 1. 4. 25% 0.25. 1. 3. 33.3% 0.3. Page 3. 2. 3. 66.7% 0.6. 1. 8. 12.5% 0.125. Page 4. 3. 50.

AT & EC Tip Sheet_July2014.pdf
This solution is ... Dr. Leslie J. Couse, EC-SEAT Project Director- [email protected]; 603-862-0638. Website: ... AT & EC Tip Sheet_July2014.pdf. AT & EC ...

FOUR SUTURE TECHNIQUE FOR EVALUATION OF TIP ...
FOUR SUTURE TECHNIQUE FOR EVALUATION OF TIP DYNAMICS IN RHINOPLASTY.pdf. FOUR SUTURE TECHNIQUE FOR EVALUATION OF TIP ...

Reporting Procedure Styles Tip Sheet - SAS Support
product names are trademarks of their respective companies. Copyright © 2008, SAS Institute Inc. SAS Institute Inc. World Headquarters. +1 919 677 8000.

FR Application Tip Sheet_Final.pdf
affordable internet service through your local internet provider, such as. Comcast's Internet Essentials Program (apply.internetessentials.com/). WHO CAN I ...

Application Tip Sheet and Checklist.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Application Tip ...Missing:

Anonymous Tip Line Flyer.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Anonymous Tip ...

tip-wage-pres-2.pdf
Minimum Wage for Tipped Employees. Data, Theory, and Calibrations. Oz Shy. 1/30. Page 1 of 30 ... level: Wage-related rules for tipped employees are governed by. the Fair labor Standard Act (FLSA). ... she/he gets a higher-quality service? Yes/No? Ly

2016_ Storytime Tip Sheet_for parents.pdf
this age vary widely in their development and all ages and stages are welcome. Use the suggested age ranges as. a guideline, but choose a program that fits ...

Embedded Instruction Tip Sheet_July2014.pdf
which includes the family. Five Steps to Implement Embedded Instruction. 1. Identify the target behavior. 2. Decide where and when to embed instruction (e.g., meal. time, transitions, small group, free choice, outside). 3. Develop an Intervention Pla

Test Taking Tip Sprinkles.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Test Taking Tip ...

Cyber-Security-Tip-Sheet-Malware.pdf
Cyber-Security-Tip-Sheet-Malware.pdf. Cyber-Security-Tip-Sheet-Malware.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying ...

Application Tip Sheet and Checklist.pdf
office as a resource! We are here to help you select the best school and navigate. through the admission and financial aid process. Fill out transcript request form ...

Travis Text A Tip POSTER.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Travis Text A Tip ...

CUBEX Print Tip Replacement Manual -
three print tips should be touching the bed without putting any pressure on it. 6. Turn the CubeX printer off and unplug it from the mains power supply. 7. Using the 2.5mm hex driver, tighten the print tip holding bolt (pictured) to lock the print ti

CUBEX Print Tip Replacement Manual -
Unfasten the print tip holding bolt. The print tip and print jet are assembled by sliding the print tip into the print jet and twisting it (as pictured). To remove the print jet you will need to twist it and pull down, eventually you will find the co

Tip PF Wiz11.pdf
Perception. Sleight of Hand w. Appraise. Diplomacy. Handle Animal. Perform. Spellcraft. Bluff. Disable Device w. Heal. Profession: Stealth w. Climb w. Disguise.