Kalamazoo Area Transportation Study FY 2014 - 2017 Transportation Improvement Program 6/26/2013 (10/22/2014) Required Fields
Fiscal Year 2015
2015
County Kalamazoo
Kalamazoo
Responsible Agency KCRC
Project Name Limits Texas Drive Al Sabo Preserve to 12th Trail Street
KCRC
8th Street at U 8th Street at U Avenue Avenue
Length
Primary Work Type
2.50
Roadside facility
0.000
Traffic ops/safety
Project Description Construct a 10-ft wide non motorized pathway Construct CLTL on U Ave, Improve Sight Distance, Curb Radii, Modifications of OH Flashing Beacon and Relocation of Utility Poles
Phase
350
TA
CON
170
4 to 3 ane conversion from Wallace Ave to Craft Ave, install CLTL from E. Michigan Ave CON to Wallace Ave. Upgrade 3 signals.
Kalamazoo
KCRC
East Main Street
East Main Street from East Michigan Ave to Sprinkle Road
2.038
Traffic ops/safety
2015
Kalamazoo
MDOT
I-94
East of Kilgore Road to Sprinkle Road
1.280
Preparation of I-94 Contract 5 design build New Route/Structure documents for reconstructing and widening PE (Capacity Increase) I-94 from 4 lanes to 6 lanes
MDOT
Trukline Traffic Operations and Regionwide Safety GPA
2015
Kalamazoo
Kalamazoo
MDOT
I-94
Lovers Lande to east of Kilgore Road
1.88
GPA
Trunkline Traffic Operations and Safety
New route/structure (capacity increase)
Preparation of I-94 Contract 4 design build documents for reconstructing and widening PE I-94 from 4 lanes to 6 lanes
Kalamazoo
KCRC
42nd St
Y Ave to W Ave
2.01
Reconstruct
2015
Kalamazoo
MDOT
I-94
at E Michigan Ave (40th Street)
1.03
Restore & rehabilitate Interchange reconfiguration
PE
2016
Kalamazoo
Public Transit
Vehicle Replacement
Demand Response
Transit vehicle additions/replacemen Up to 6 Demand response ts
T-Cap
M-43
M-43 from US-131 to Stadium Drive (I-94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street
M-43
M-43 from US-131 to Stadium Drive (I-94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street
2015
2016
Kalamazoo
Kalamazoo
Kalamazoo
MDOT
MDOT
MDOT
I-94 BL
East of Seneca Rd to Rambling Rd
4.634
4.634
2.76
Resurface
Resurface
Reconstruct
CON
2016
2015
Federal Fund Source
CON
2015
2015
Advance Construct
Federal Cost ($1000s)
CON
Cold Milling and HMA resurfacing with ADA PE sidewalk ramps
Cold Milling and HMA resurfacing with ADA ROW sidewalk ramps
CON
State Cost ($1000s)
Total Phase Cost ($1000s)
MDOT Job No.
Local ID No.
MPO/ Rural Action Date
Amendment Type
Air Quality
Comments Addition of project, state cost provided by DNR grant;
Total Project Cost ($1000s)
TWP
701
122222
Add
E
STH
43
CNTY
213
120524
Add
E
Addition of project
213
600
STH
70
CNTY
670
120523
Add
E
Addition of project
670
246
NH
54
M
300
126002
Add
NE
Addition of project
300
5
ST
1
M
5
Add
E
Addition of project
5
246
NH
54
M
300
Add
NE
Addition of project
300
920
82
33
1,842
M
Local Cost ($1000s)
Local Fund Source
105
713
246
State Fund Source
STL
NH
NH
Resurface
Resurface and repair roadway
NH
4.634
Resurface
Cold Milling and HMA resurfacing with ADA CON sidewalk ramps
2,043
NH
593
STH
207
CNTY
18
357
2016
Kalamazoo
MDOT
M-43
M-43 from US-131 to Stadium Drive (I-94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street
2015
Kalamazoo
KCRC
Sprinkle Rd
E Michigan Ave to E Main St
1.00
Traffic ops/safety
Concrete shoulders and median, superelevation modifications, centerline and CON shoulder rumble strips; mill and overlay
2015
Kalamazoo
MDOT
I-94
east of Portage Road to west of Sprinkle Road in the City of Kalamazoo, Kalamazoo County
1.20
Widen - major (capacity increase)
Road reconstruction and widening and reconstruction and widening of 2 railroad bridges and a large culvert
ROW
41
HPSL
8
2015
Kalamazoo
MDOT
I-94
east of Portage Road to west of Sprinkle Road in the City of Kalamazoo, Kalamazoo County
1.20
Widen - major (capacity increase)
Road reconstruction and widening and reconstruction and widening of 2 railroad bridges and a large culvert
SUB
82
HPSL
16
453
920
120244
06/26/13
Cost
E
Kalamazoo County Road Commission; Additional funding from RTF, ST change from $650,000 to $712,805, Local Cost from $280,000 to $207,195;
0
112614
03/18/14
Delete
E
Move to FY 2014 (Administrative Adjustment) 3/18/14; Deletion of project, duplicate obligated in FY2014 10/28/14;
120238
06/26/13
Delete
E
$62,805 Federal STP; $10,577 EDD; $4,523.13 CTF; $675.87 TRAL; Deletion of project, funded through RTF Set aside,
234
E
Addition of project 7/30/14; Scope change from US-131 to Stadium Drive (I-94BL) to M-43 from US-131 to Stadium Drive (I94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street, admin change to total project cost 10/28/14;
2,636
E
Addition of project 7/30/14; Scope change from US-131 to Stadium Drive (I-94BL) to M-43 from US-131 to Stadium Drive (I94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street, admin change to total project cost 10/28/14;
2,636
E
Change in Primary Work Type from Reconstruct to Resurface, Change Fed cost from $4526420 to $1,841,625, Change State Cost from $1,003,720 to $408,375 7/30/14; Limit change, reduction in state share from $408,375 and addition of City share 9-24-14; Correction in length of project to 2.762 10/28/14;
2,781
2,636
100
7
40
M
51
CITY
M
125999
701
2,250
123262
123262
113129
07/30/14
07/30/14
09/24/14
Scope
Scope
Scope
11,100
2,496
123262
07/30/14
Scope
E
Addition of project 7/30/14; Scope change from US-131 to Stadium Drive (I-94BL) to M-43 from US-131 to Stadium Drive (I94BL) and on Kalamazoo Ave (M-43) from Pitcher Street to West Main Street, admin change to total project cost 10/28/14; Kalamazoo County Road Commission; Admin FY Change to 2015 from 2014 10/28/14;
659
66
CNTY
659
119575
06/26/13
Year
E
M
1
CITY
50
105886
12/04/13
Year
NE
Addition of Project 12/4/13, Change in FY to 2015
500
M
2
CITY
100
105886
12/04/13
Year
NE
Addition of Project 12/4/13, Change in FY to 2015
500
Kalamazoo Area Transportation Study FY 2014 - 2017 Transportation Improvement Program 6/26/2013 (10/22/2014) Required Fields
Fiscal Year
County
Responsible Agency
2015
Kalamazoo
MDOT
2015
Kalamazoo
MDOT
2015
2015
Kalamazoo
Van Buren
Project Name
Limits east of Lovers Lane to east of Portage Road in Kilgore / W I-94 the cities of Kalamazoo Ramp and Portage, Kalamazoo County east of Lovers Lane to east of Portage Road in Kilgore / W I-94 the cities of Kalamazoo Ramp and Portage, Kalamazoo County
Length
Primary Work Type
Project Description
Phase
Advance Construct
Federal Cost ($1000s)
Federal Fund Source
State Cost ($1000s)
State Fund Source
Air Quality
Comments
Total Project Cost ($1000s)
ROW
41
HPSL
8
M
1
CITY
50
105885
12/04/13
Year
NE
Addition of Project 12/4/13; Change in FY to 2015
500
1.16
Widen - major (capacity increase)
Roadway reconstruction and widening and interchange reconstruction
SUB
82
HPSL
16
M
2
CITY
100
105885
12/04/13
Year
NE
Addition of Project 12/4/13, Change in FY to 2015
500
2,781
MDOT
I-94 BL
east of Seneca to Michigan Avenue
2.76
Resurface
Resurface and repair roadway
ROW
MDOT
M-40
at the intersection of 62nd St, 32nd St and CR 653
0.500
Reconstruct
Construct Roundabout
PE
8
NH
2
119
CM
26
M
I-94
Westbound I-94 from ML Ave E to Michigan Ave E
7.32
Resurface
Cold Milling & Bituminous Overlay
CON
2,287
IM
254
M
2015
Kalamazoo
MDOT
US-131
I-94 to Shaver Road
6.575
Restore and Rehabilitate
Multi course HMA overlay
CON
9,560
NH
1,920
M
MDOT
M-40
at the intersection of 62nd St, 32nd St and CR 653
0.500
Reconstruct
Construct Roundabout
ROW
82
CM
18
MDOT
I-94
Westbound I-94 from Miller to 40th Street
7.47
Resurface
Widen Shoulder
CON
HSIP
157
Kalamazoo
Local ID No.
Amendment Type
Roadway reconstruction and widening and interchange reconstruction
MDOT
2016
MDOT Job No.
MPO/ Rural Action Date
Widen - major (capacity increase)
Kalamazoo
Van Buren
Total Phase Cost ($1000s)
1.16
2015
2016
Local Cost ($1000s)
Local Fund Source
1,415
M
0
200
0
CITY
CITY
10
113129
09/24/14
Year
E
Addition of project; Advance Construct Conversion in 2014 ($8,185 NH Funds); Construct in 2016 6/29/11; Moved from FY 2013 11/28/12; Change in Primary Work Type from Reconstruct to Resurface 7/30/14; Limit change and addition of City share 9-24-14; Admin correction in total project cost to $2,781,271 and FY change to 2015 10/28/14;
145
124079
07/30/14
Year
E
Addition of project 7/30/14; Admin JN change to 124079 from 120479 9-17-14; Admin FY Change to 2015 10/28/14;
1,355
2,541
122066
03/26/14
Year
E
Addition of Project 3/26/14, Admin change in FY from 2016 to 2015 10/28/14;
2,600
11,680
116399
09/24/14
Year
E
Addition of project 7/30/14; Change in Scope to I-94 to Shaver Road 9-24-14; Admin change to FY and total project cost to $12,780,000 10/28/14;
12,780
100
124079
07/30/14
Year
E
Addition of project 7/30/14; Admin JN change to 124079 from 120479 9-17-14; Admin FY Change to 2016 10/28/14;
1,355
1,572
116718
06/26/13
Year
E
Admin FY change from 2017 to 2016 10/28/14;
1,660