Consultation

Draft Infrastructure Delivery Plan August 2016

Start

30 August 2016 09:00:00 BST

End

24 October 2016 17:00:00 BST

Published on

30 August 2016 11:23:23 BST

Help us to reduce paper waste. This download can be stored on your computer for future reference. Please be mindful of the environment and only print required pages, if at all.

To comment on this document online please: 1. 2. 3. 4. 5.

Select this link to open the document online Browse to the area(s) of the document that you would like to comment on using the table of contents on the left of the screen Select the Add Comment option (note that you may be asked to register / sign in) Complete the question(s) displayed Select the Submit option

Thank you! Making your comments online has the following key benefits: Save time - view and download documents/comments online anytime, anywhere Environmental - electronic systems save paper Keep track of how your comments are processed Set your Areas of Interest for instant updates of new events available for consultation View and Search comments made by other consultees once they have been processed

Draft Infrastructure Delivery Plan August 2016

144

1

- Draft Infrastructure Delivery Plan August 2016

Appendix 1 - Infrastructure Delivery Schedule 1.1

The tables overleaf set out details of the known infrastructure projects required to support the Local Plan over the years 2013- 2032. As further schemes are identified they will be added to the schedule.

Infrastructure Item

A1(M) Junction 6 including Clock Roundabout improvements to the 4 roundabouts comprising this junction

Broadwater Road and Bridge Road signalised crossroads - Road widening and pedestrian crossing improvements

Comet Way roundabout - redesign of roundabout and approaches

Stanborough roundabouts - range of capacity improvements to roundabout and adjoining roads

Infrastructure Category

Transport

Transport

Transport

Transport

Table 15

0.74

0.25

0.55

0.52

Estimated cost of Delivery (£M)

CIL, s106

CIL, s106

CIL, s106

HCC

HCC

HCC

Local Growth Deal, HCC, A1(M) Roads Investment Consortium Strategy, Growth and Transport Plan output

Timescale for Delivery

Herts Highways

Herts Highways

Herts Highways

2023 - 27

2023 - 27

2023 - 27

Highways England, 2023 - 27 Herts Highways

Funding Sources Delivery Partners Delivery Mechanisms (where known)

- Draft Infrastructure Delivery Plan August 2016 145

Appendix 1 - Infrastructure Delivery Schedule 1

Infrastructure Item

Birchall Lane roundabout - enhancement/additional segregated left turns and associated works

Holwell Lane/A414 roundabout widening/lane markings

B197 Wellfield Road/A1001 Comet Way roundabout - traffic signals, markings and new left turn lane

Coopers Green Lane/Green Lane increasing size of roundabout

St Albans Road/Ellenbrook Lane signalised cross roads and other works

Infrastructure Category

Transport

Transport

Transport

Transport

Transport

0.78

1.08

0.60

0.18

1.17

Estimated cost of Delivery (£M)

CIL,s106

CIL, s106

CIL, s106

CIL, s106

CIL, s106

HCC

HCC

HCC

HCC

HCC

Herts Highways

Herts Highways

Herts Highways

Herts Highways

Herts Highways

Funding Sources Delivery Partners Delivery Mechanisms (where known)

2023 -27

2023 - 27

2023 - 27

2023 - 27

2023 - 27

Timescale for Delivery

1

Table 16

146 - Draft Infrastructure Delivery Plan August 2016

Appendix 1 - Infrastructure Delivery Schedule

Infrastructure Item

5 new children's centres or equivalent nursery provision

22fe of primary provision through expansion of existing schools together with new schools as appropriate

22fe of secondary schools through expansion of existing schools together with and 2 or possibly 3 new minimum 6fe schools

Infrastructure Category

Education

Education

Education

Table 17

64.4

84.04

2.40

Estimated cost of Delivery (£M)

S106,CIL

s106, CIL

s106, CIL

Various education providers

Various education providers

Various education providers

Timescale for Delivery

Academy/Free 14fe 2023 27, 8fe School/other (HCC 2028 - 32 as last resort)

Academy/Free 3fe before 2022, School/other (HCC 11fe 2023 – 27, as last resort) 8fe 2028 - 32

Academy/Free 1 before 2022, 3 School/other (HCC 2023 – 27, 1 2028 as last resort) - 32

Funding Sources Delivery Partners Delivery Mechanisms (where known)

- Draft Infrastructure Delivery Plan August 2016 147

Appendix 1 - Infrastructure Delivery Schedule 1

Infrastructure Item

Accommodation (surgeries/clinics) for an additional 14 GPs

Additional premises/facilities for Acute secondary care services

Additional premises/facilities for Mental Health secondary care services

Community secondary care services

Infrastructure Category

Health

Health

Health

Health

2.99

2.22

28.6

6.831

Estimated cost of Delivery (£M)

s106, CIL

s106, CIL

s106, CIL

S106, CIL

Healthcare providers incl community and Foundation NHS Trusts

Healthcare providers incl community and foundation NHS Trusts

Healthcare providers incl community and foundation NHS Trusts

GP practices, reimbursed by NHS England

Healthcare agencies incl community and foundation NHS Trusts

Healthcare agencies incl community and foundation NHS Trusts

Healthcare agencies incl community and foundation NHS Trusts

GPs

Funding Sources Delivery Partners Delivery Mechanisms (where known)

20% of new provision by 2022, 50% in 2023 – 27, 30% in 2028 - 32

20% of new provision by 2022, 50% in 2023 – 27, 30% in 2028 - 32

20% of new provision by 2022, 50% in 2023 – 27, 30% in 2028 - 32

Accommodation for 4 by 2022, 6 in 2023 – 27, 2 in 2028 - 32

Timescale for Delivery

1

Table 18

148 - Draft Infrastructure Delivery Plan August 2016

Appendix 1 - Infrastructure Delivery Schedule

Infrastructure Item

Green Corridor Scheme – new footbridges/underpasses to secure connectivity of corridor

Sports halls: 2 new 4 court sports halls, one in Welwyn Garden City and one in Hatfield, linked These should be linked to the 2 new secondary schools

Infrastructure Category

Green Infrastructure

Social Infrastructure

Table 19

4.43

3.6

Estimated cost of Delivery (£M)

S106,CIL

S106, CIL

WHBC

WHBC,HCC,LNP, others

WHBC

WHBC, HCC, LNO,others

Funding Sources Delivery Partners Delivery Mechanisms (where known)

2 in 2023 - 27

50% in 2023 – 27, 50% 2028 - 32

Timescale for Delivery

- Draft Infrastructure Delivery Plan August 2016 149

Appendix 1 - Infrastructure Delivery Schedule 1

Strategic Sports Facility: A new strategic sports

Social Infrastructure

Swimming Pools: Upgrade of Monks Walk swimming pool

Health and Fitness: A new health and fitness facility should be provided in Welwyn Garden City

Sports pitches: 14 new sports pitches will be required: 7 in Welwyn Garden City and 7 in

Social Infrastructure

Social Infrastructure

Social Infrastructure

facility possibly linked to those within the University of Hertfordshire

Infrastructure Item

Infrastructure Category

1.19

8.425

1.5

17.50

Estimated cost of Delivery (£M)

s106,CIL

S106, CIL

S106, CIL

s106,CIL

WHBC

WHBC

WHBC

WHBC, University of Hertfordshire

Funding Sources Delivery Partners

WHBC

WHBC

WHBC

University of Hertfordshire

Delivery Mechanisms (where known)

50% in 2023 – 27, 50% in 2028 - 32

2023 - 27

2023 - 27

2023 - 27

Timescale for Delivery

1

Table 20

150 - Draft Infrastructure Delivery Plan August 2016

Appendix 1 - Infrastructure Delivery Schedule

- Draft Infrastructure Delivery Plan August 2016

151

Hatfield, linked to the provision of 2 new secondary schools

Appendix 1 - Infrastructure Delivery Schedule

1

1.2

Social Infrastructure Outdoor Tennis: Upgrade of existing outdoor tennis facilities in the borough

Social Infrastructure Athletics Track: Upgrade 1.0 of the athletics track at Gosling Sports Park

0.5

Social Infrastructure MUGAs: Upgrade of existing MUGAs in the borough

Estimated cost of Delivery (£M) 1.76

Infrastructure Item

Social Infrastructure Flood Lit AGPs: 2 floodlit AGPs are required: one in each town. These again should be linked to the provision of the 2 new secondary schools in the borough

Infrastructure Category

S106, CIL

S106, CIL

S106, CIL

s106, CIL

WHBC

WHBC

WHBC

WHBC

WHBC

WHBC

WHBC

WHBC

Funding Sources Delivery Partners Delivery Mechanisms (where known)

2023 – 27

30% by 2022, 40% 2023- 27, 30% 2028 -32

30% by 2022, 40% 2023- 27, 30% 2028 -32

1 in 2023 – 27, 1 in 2028 - 32

Timescale for Delivery

1

Table 21

152 - Draft Infrastructure Delivery Plan August 2016

Appendix 1 - Infrastructure Delivery Schedule

Community Police facility 1.2 in Welwyn Garden City

Emergency Services

TBC

Provision of a 700 sq.m. household waste recycling facility to replace that at Cole Green

Waste and Recycling

Estimated cost of Delivery (£M)

Infrastructure Item

Infrastructure Category

Table 22

S106,CIL

S106,CIL

Herts Constabulary, Police and Crime Commissioner

HCC

Herts Constabulary, Police and Crime Commissioner

HCC

Funding Sources Delivery Partners Delivery Mechanisms (where known)

2028 -32

2023 - 27

Timescale for Delivery

- Draft Infrastructure Delivery Plan August 2016 153

Appendix 1 - Infrastructure Delivery Schedule 1

of 12

There was a problem loading this page. Retrying... Main menu. Displaying Draft_Infrastructure_Delivery_Plan_August_2016_4006808863881840090.pdf.

303KB Sizes 3 Downloads 183 Views

Recommend Documents

of 12
adoption of assistive technology and accessibility, to the visually impaired. community. We also want to identify ... indicate that the exchange of information and the accessible learning. environment filled with communication strategies have potenti

of 12
Oral User Reviews for Vardenafil HCL powder and Avanafil powder. ... Vardenafil HCL powder, comes in two forms - a tablet or a disintegrating tablet ... .pdf.

of 12
Registre du Commerce de Luxembourg sous le numéro B-. 93815, dont le siège social est situé 5 Rue Plaetis. L-2338 au Luxembourg. 2) Société AMAZON EU ...

of 12
Sign in. Page. 1. /. 12. Loading… Page 1 of 12. Page 1 of 12. Page 2 of 12. Page 2 of 12. Page 3 of 12. Page 3 of 12. 20151217_ActaReunionTribunalBolsaTrabajoManteniAlbañilElectricista.pdf.pdf. 20151217_ActaReunionTribunalBolsaTrabajoManteniAlbañ

of 12
INVERSION_DE_GIRO_TEMPORIZADA_D_MOTOR_CON_PLC_TWIDO.pdf. INVERSION_DE_GIRO_TEMPORIZADA_D_MOTOR_CON_PLC_TWIDO.pdf.

of 12 - Drive
CertBus-SUN-310-220-Study-Materials-Braindumps-With-Real-Exam.pdf. CertBus-SUN-310-220-Study-Materials-Braindumps-With-Real-Exam.pdf. Open.

of 12
Page 1 of 12. Shri Vaishnav Vidyapeeth Vishwavidyalaya, Indore. Name of Program: DPLOMA (Garment and Fashion Technology). SUBJECT. CODE CATEGORY SUBJECT NAME. TEACHING & EVALUATION SCHEME. THEORY PRACTICAL. L T P. CREDITS. END SEM. University Exam. T

of 12
... modificar y. transformar el propio conocimiento. Page 3 of 12. Guia_para_la_evaluacion_de_la_practica_docente_en_la_ensenanza_de_la_Lectura.pdf.

of 12 - Drive
_multimedia_clasificaciones_ClasificacionIIICarreraPopularCerroMarmota-0.pdf. _multimedia_clasificaciones_ClasificacionIIICarreraPopularCerroMarmota-0.

of 12
Subject Teaching & Examination Scheme. Page 4 of 12. Subject_Teaching_&_Examination_Scheme_B_ARTS_ARTS_B_ARTS_BLA_English_2016_17.pdf.

Board Briefly, 12-08-12 and 12-10-12.pdf
PO Box 200 • Battle Ground, WA 98604-0200 • Office Location: 11104 NE 149th Street • Brush Prairie, Washington. District Switchboard: (360) 885-5300. Dec.

12. Wilson_Future population of NT.pdf
Page 1 of 12. The future population of the Northern Territory. Northern Population Matters symposium. 4th August 2016. Tom Wilson. Page 1 of 12 ... Summary components of population change, 1971-2015. Source: calculated from ABS data. Page 4 of 12. Ma

ACT-12 - Rajarajeswari College of Engineering
Jul 10, 2012 - Communication, Civil, Computer Science,. Information Science, Mechanical, Electronics & ... college is located at a distance of 18kms from.

ACT-12 - Rajarajeswari College of Engineering
Jul 10, 2012 - Master of Computer Applications, also 4 R&D centers. All the Departments have well equipped laboratories, library, digital library computing and ... REGISTRATION FORM ... Seal and Signature of the Sponsoring Authority.

Page 4 of 12
... MN Grumpys/LGR 233842 1:23:13. Page 4 of 12. https://web.archive.org/web/20080708143828/http://mcf.net/downloads/2008/results/kwmrr08.pdf.

12 pillars of success pdf
Page 1 of 1. File: 12 pillars of success pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. 12 pillars of success pdf. 12 pillars of success pdf. Open. Extract. Open with. Sign In. Main menu. Displaying 12 pillar

36-12 Order of Dismissal.pdf
Page 1 of 1. IN THE DISTRICT COURT OF. COUNTY,. STATE OF UTAH. IN THE MATTER OF: ORDER OF DISMISSAL. Case No. The above-entitled matter having come before the Court on the ____ day of. , 20_____, and the Court having found that the statutory. require

12 Principles of Animation.pdf
The basic principles of drawing form, weight, volume solidity and the illusion of three dimensions apply to. animation as it does to academic drawing. The way ...

Conservation of Momentum Physics 12
Procedure: Trial 1: 1. Obtain two Pasco Carts and measure the mass of the carts using a triple beam balance. Record this mass on your data table. Then add ...

Agenda 12-12-16.pdf
Lincoln High School (84 students), Medieval Times, Lawrenceville, GA, Dec. 2, 2016. (1 school day). b. Childersburg High School (53 students), Tour Military Post & U.S. President's Home,. Fort Benning, GA, January 27, 2017 (1 school day). c. Fayettev

Online RP 12-12-11
Page 1. Online RP 12-12-11. Campus-Only RP 12-12-11.

2008-12-12-Foreign-Intelligence-Surveillance_Court-Supplemental ...
Page 4. Page 4 of 5. 2008-12-12-Foreign-Intelligence-Surveillance_Court-S ... -FISC-allowing-content-authorization-Dec-12-2008.pdf.

12 / 12 / 2013 1
Dec 12, 2013 - 10. ABC. ∆. D. AC. E. BC α β. 9. 10. AC. BD. O. AB || CD. BO = OD. AOB. DOC. ☒. 1. AO = CO. 1. ☐. 2. ☐. 2. ∢B = ∢D. 1. ☐. 2. ☐. 3. AC = BD. 1. ☐.

12 Pillars of Polyamory.pdf
May 15, 2008 - In observing the Poly community over the past 10 years. it has become apparent to me that there are some basic principles, I call them Pillars, ...