Innovative Solar Inc.’s Rapid Shutdown with Cap Discharge product differentiators. 1. Innovative Solar Inc. offers Capacitor Discharge on every 600v string, while most 3rd party manufacturers do not offer the function. At the same time, most string inverters sold today do not discharge their bulk capacitors fast enough to meet the new NEC690.12 code. In order for systems to be code compliant, equipment in addition to a roof mounted SOB (Shut Off Box) is likely to be needed. 2. Operation is Automatic. No separate action is required because the system is immediately triggered when the fire department cuts grid power. Innovative Solar Inc. does offer an optional E-stop, however, in case the local jurisdiction requires it. 3. Innovative Solar Inc.’s Rapid Shutdown system uses a Fail-safe hardwired design. Isolation is virtually guaranteed without the need for redundancy, maintenance, or periodic testing. Systems using shut trip technology or digital communication require positive feedback in order for the fire department to verify that the PV panels were isolated, because operation is not guaranteed. 4. No maintenance is required with the system from Innovative Solar Inc. There are no batteries to be maintained or replaced, and no PV wires to torque. 5. The Innovative Solar Inc. system allows for operation on nearly any low voltage AC or DC source, providing Flexibility in implementation. The simplest low cost method is to simply power it from a Class 2 bell transformer installed in a convenient location. The presence of grid power controls operation. 6. The Innovative Solar Inc. system allows for a Ground level reset. Shut trip systems can normally be reset only by going on the roof. 7. The system from Innovative Solar Inc. is rated for Extreme temperatures: -40°C to 70°C (-40°F to 158°F). Most Rapid Shutdown systems are limited to -25C or higher. 8. Innovative Solar Inc. offers a Full range of product, including 1000v and up to 8 channels per box. Many manufacturers have more limited offerings. 9. The Rapid Shutdown system from Innovative Solar Inc. provides all Screw less PV connections in order to maximize reliability and ease of installation and no torquing is required. 10. No special tools or cabling is required to install the Rapid Shutdown system from Innovative Solar Inc. Control power can be routed with standard THHN wire through the PV conduit. 11. Innovative Solar Inc.is the only Rapid Shutdown system available today in the popular SolaDeck enclosure.

12. No roof mounted fuses. PV fuses are required on all installations where the number of strings exceeds 2 per MPPT. Unlike combiner type solutions, the Rapid Shutdown system from Innovative Solar Inc. will support any number of isolated strings allowing fuses to be mounted at ground level.

SOLADECK PV Roof-Mount Flashed 2014 NEC690.12 Rapid ...

Page 1 of 1. SOLADECK PV Roof-Mount Flashed 2014 NEC690.12 Rapid Shutdown product differentiators RENVU.pdf. SOLADECK PV Roof-Mount Flashed ...

185KB Sizes 1 Downloads 131 Views

Recommend Documents

FAC-PV AG 2014-signé.pdf
Safety Inspector (RCS). Tax Consultant (CES. Whoops! There was a problem loading this page. Retrying... Whoops! There was a problem loading this page. Retrying... FAC-PV AG 2014-signé.pdf. FAC-PV AG 2014-signé.pdf. Open. Extract. Open with. Sign In

PV ATHLETICS & ACTIVITIES PARTICIPATION AGREEMENT ...
PV ATHLETICS & ACTIVITIES PARTICIPATION AGREEMENT 2014.15.pdf. PV ATHLETICS & ACTIVITIES PARTICIPATION AGREEMENT 2014.15.pdf. Open.

PV 10 USB.pdf
playing back digital audio (compatible with Mac OSX, Windows XP, ME & 2000). It also includes pre-fader. monitor sends; post-fader effects send; inserts on all ...

Earthing PV module frame … PV String GC Inverter -
electrical equipment and extraneous conductive parts. NOTE: Additional equipotential bonding requirements apply for ... (e) photovoltaic arrays, in accordance with AS/NZS 5033. 5.6.3.2 Size. (a) ...the equipotential bonding conductor required ... sha

PV FAQs: What Is the Energy Payback for PV? Solar Energy - OSTI.gov
Producing electricity with photovoltaics (PV) emits no pollu- tion, produces no greenhouse gases, and uses no finite fossil- fuel resources. The environmental benefits of PV are great. But just as we say that it takes money to make money, it also tak

2014-04-11 CCC lttr to PV-over drains.pdf
and thus could not have been somehow approved in concept by the Commission. Page 3 of 9. 2014-04-11 CCC lttr to PV-over drains.pdf. 2014-04-11 CCC lttr to ...

PV Délibération S4 2014-2015 Ratt + Rachat (NOUR).pdf ...
PV Délibération S4 2014-2015 Ratt + Rachat (NOUR).pdf. PV Délibération S4 2014-2015 Ratt + Rachat (NOUR).pdf. Open. Extract. Open with. Sign In.

PV sedinta 16.09.2016.PDF
Prin Dispozifia Ilr.35/24.08.2016 al gefului arJministraliei al Administra{iei. judetene a Finanlelor Publice Harghita privind repartizi:rea sumei defalcate din TVA.

PV mai 2016.PDF
U.2076 ptivihd qprcboteo ptelungh'ti. contructului pentru ocotdoteq de seruicii sociol-medicole m. 7695/16,03.2075 incheiqtintue. Comuno Cdpilnita ii Asociotio ...

PV POS 2016 - 2017.pdf
Page 1 of 34. TABLE OF CONTENTS. PENQUIS SCHOOLS MISSION STATEMENT 3. FOUR – YEAR EDUCATION PLAN 3. GRADUATION REQUIREMENTS 3.

PV PSY CONS ET PES.pdf
Page 1 of 2. Stand 02/ 2000 MULTITESTER I Seite 1. RANGE MAX/MIN VoltSensor HOLD. MM 1-3. V. V. OFF. Hz A. A. °C. °F. Hz. A. MAX. 10A. FUSED.

pv-de-w-35.pdf
Page. 1. /. 2. Loading… Page 1. Page 2 of 2. pv-de-w-35.pdf. pv-de-w-35.pdf. Open. Extract. Open with. Sign In. Details. Comments. General Info. Type. Dimensions. Size. Duration. Location. Modified. Created. Opened by me. Sharing. Description. Down

Solar - Photovoltaic (PV) Systems.pdf
Loading… Page 1. Whoops! There was a problem loading more pages. Solar - Photovoltaic (PV) Systems.pdf. Solar - Photovoltaic (PV) Systems.pdf. Open.

PV sedinta 30.09.2016.PDF
... al Comunei Cdpilnila cq membri ai Consiliului de. administrolie ti ai Comisiei pentru evaluarea ti osigurareq cdlitdlii din $coola. Gimnaziold,,Krizo J dnos".

2 Day Solar PV Seminar -
mer board member of the Northern. California Solar Energy Association, and a volunteer with Engineers With- out Borders. Marvin R Hamon,. P.E., MScEE, Prin-.

PV matières M1 FCI.pdf
6 10SEGC377 BAZIZI Bilal 06,00 12,00 8,00 0 1 08,00 0 1 1. 7 11SEGC0411 BEKTACHE Syphax 00,00 Exclu ######### ##### ### ######### ### ### 1.

PV Conseil plenier 150514.pdf
Christian Cuesta, Didier Nicolle, Caroline Oliver-Yaniv, Guillaume Violet, Pierre Couraud. ***. 1) Échange avec l'équipe présidentielle sur le projet de création ...

PV COET.12.06.12.pdf
à l'école Ferdinand-Hodler, salle de réunion, premier étage. Page 4 of 4. PV COET.12.06.12.pdf. PV COET.12.06.12.pdf. Open. Extract. Open with. Sign In.

2011.10.04-PV-COET.Ami-Argand.Bon-Séjour.pdf
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps.

Suite PV INSTITUTEURS PDF.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Suite PV ...

PV 2017 01 23.pdf
Conformément au barème publié par l'URSSAF portant modification des avantages en nature,. A l'unanimité, le conseil municipal, après en avoir délibéré,.

Rapid #= -3449484
System Date/Time: 5/27/2010 9:36:48 AM MST .... Various recent extensions of this model include a general class of Markov processes for generating time-.

BMP280 - Rapid Electronics
Oct 15, 2015 - 6 Since most pressure sensors do not sample continuously, filtering can suffer from signals with a frequency higher than the ...... 160 ns. SCK low pulse. tLOW. HS mode, Cb≤100 pF. VDDIO = 1.2 V. 210 ns. The above-mentioned I2C speci

Rapid News
5 days ago - The application will also be available in the Counseling Office during this time period. Programs: The JRHS PTSO and the Chesterfield Federal Credit Union will host an educational program for parents and students about checking accounts