CPTSB BOARD NEWS

Contents 1.

Draft of the August 25, 2016 Board meeting notes

2.

Updated CPTSB Form 139-16 for reporting tramway incidents

3.

CPTSB Form 25-06 Items to be Completed Prior to Operation

4.

Temporary blanket variance for relief from ANSI Rule 3.1.4.3.4.3 Incorrect attachment

5.

2015-2016 Incident and Component Log Reports

Draft of the August 25, 2016 Board meeting notes

DRAFT - NOTES COLORADO PASSENGER TRAMWAY SAFETY BOARD

1560 Broadway, Conference Room 1250-C Denver, CO 80202

August 25, 2016

This meeting of the Board was publicly noticed according to the Division of Professions and Occupations' Policy 80-17. I.

CALL TO ORDER Richard Burkley, Board Chair, called the meeting to order at 9:00 a.m.

RECOGNITION OF MEMBERS PRESENT Board Members Present:

Richard Burkley, Chair Bryce Beecher, Member Maria Dominguez, Member Elizabeth Howe, Member (via conference call) Mike Lane, Member Jon Mauch, Member

Board Members Absent:

Ann Sheflin, Vice Chair

Staff Members Present:

John Roberts, Assistant Attorney General Larry Smith, CPTSB Staff Nicki Cochrell, CPTSB Staff

Others Present (elected to sign in): Geoff George, Crested Butte Mountain Mark Kramer, Copper Mountain Resort Doug Allen, Steamboat Ski & Resort Erik Shellman, Breckenridge Ski Resort Rob Ware, Arapahoe Basin Phil Patterson, Beaver Creek Ben Morton, Arapahoe Basin Jim Loebe, Mountain Village Gondola Larry Forsythe, Mountain Village Gondola

II.

REVIEW OF MINUTES It was moved and seconded to approve the May 4, 2016 meeting minutes as written. The motion carried with Maria Dominguez abstaining from the vote.

g:\business and technical\tramway\board meetings 082516 board meeting\082516 minutes

CPTSB Meeting Minutes August 25, 2016 Page 2

III.

INTRODUCTION OF JOE NEGUSE, DORA EXECUTIVE DIRECTOR Joe Neguse, DORA’s Executive Director, was planning to attend the meeting but could not make it. He will be formally introduced and discussed his goals for DORA during his tenure at a future meeting.

IV.

INTRODUCTION OF RONNE HINES, DIVISION DIRECTOR, DPO Ronne Hines, Division Director of the Division of Professions and Occupations, was invited to formally introduce herself to the Board. She shared her goals for the division during her tenure and thanked the Board for their service.

V.

STAFF UPDATE Nicki Cochrell, Program Manager, said Staff had some new business at the end of the meeting that is not on the agenda. Ms. Cochrell said the fall inspectors’ meeting will be held on August 30, 2016. More information regarding this meeting is posted on the Board’s website calendar. Ms. Cochrell said Board members have a list of the 2017 meeting dates in their folders. The meeting dates are posted on the Board’s website calendar. Ms. Cochrell said the next Board meeting would be held on October 27, 2016 in Denver at 1560 Broadway in Conference Room 1250-C at 9:00 a.m. The deadline for agenda items is October 6, 2016. She also stated the next Technical Committee is scheduled for October 7, 2016 via conference call at 1560 Broadway, Suite 1550-Small Conference Room at 9:00 a.m. The deadline for the meeting is September 23, 2016. Updates about these meetings will be posted on the Board’s website calendar. Ms. Cochrell said the Board will be having their next training session after the October 27, 2016 meeting. Ms. Cochrell said this year’s renewals would be going out around the first of September. Like last year, areas are to send their renewal(s) and the correct fee(s) to the Board office. Also like last year, areas should plan on some minor delays when submitting renewals. Therefore, areas are asked to plan ahead when renewing their licenses this year. Ms. Cochrell said the process for printing tramway licenses will also be like last year. Licenses will no longer be mailed. When a license is approved, the area’s designated agent and current substitute designated agent will receive an email with a PDF attachment of the license to print. Like the inspection reports, designated agents are responsible of forwarding the email to other staff at their area if needed.

CPTSB Meeting Minutes August 25, 2016 Page 3

Ms. Cochrell said the Crisis Management Plan will be updated and the Board will be going over the plan during the October training session. Ms. Cochrell said Board members have in their folders the Board Confidentiality Agreement and Policy 8 that staff and Board members have to sign each year. She asked Board members to sign the forms and return them to her at the end of today’s meeting. Larry Smith, Supervisory Tramway Engineer, said the Lieutenant Governor and DORA’s Executive Director recently went on a tour with him at Keystone. He thanked Keystone for a great tour. Both the Lieutenant Governor and Executive Director were impressed with the complexity, size and scope of the tramway equipment and the quality of the tramway inspection program. Mr. Smith said Purgatory has proposed installing in a new two-way rope tow that is somewhat similar to the one at the Alta Ski Resort in Utah. He is planning to go to Salt Lake around the end of September to meet with Skytrac, the equipment designer, on the equipment and visit Alta to see their equipment. He informed the Board there will be multiple variance requests coming in for this equipment. Mr. Smith said the latest ANSI ballot is completed. The final ballot will be coming out this winter. There will be a lot of changes in the Colorado rules when the next ANSI is adopted and Mr. Smith will inform the Board of the items that will require changing at the next Board meeting. Mr. Smith said the Division is in process of sending out surveys to industry constituents to get feedback on how we are doing. Tramway will be sending out a link to the Tramway Board survey with each inspection report email starting this licensing season. Mr. Smith announced that Mr. Bob Ernest passed away. He was a form Board member and Board Chair in the late 80s. He was also a previous tramway inspector. Mr. Smith announced that Mr. Bill Alsup passed away in a crane accident. Mr. Alsup was very involved in the tramway industry. Mr. Smith showed pictures of the Bogus Basin work chair incident that recently occurred in Boise, Idaho. The chair fell to ground at tower 3 and caught a cable catcher due to a use of short shank Riblet clip workchair. Two workers had multiple injuries. Mr. Smith showed pictures of the cracks discovered on several towers on the Silver Queen quad lifting frame and handrail supports at Crested Butte. The cracks were discovered through the areas visual inspection program. Mr. Smith showed pictures of a foundation failure at Sunday River Resort in Maine. The foundation designed utilized a concrete foundation poured directly onto a rock surface and was pinned using rebar to holes drilled into the rock surface. The grout used was a water-soluable grout and after years of exposure, the grout failed. Mr. Smith stated a memo was sent to Colorado areas asking them to inform the Board if they have any

CPTSB Meeting Minutes August 25, 2016 Page 4

foundations using this type of foundation and also requested they complete an evaluation of their chairlift terminal foundations as a precautionary measure. Mr. Smith show pictures of the Howelsen Hill mud slide that was discovered at the area’s jumping hill and the movement that affected the conveyor foundations. The conveyor was adjusted back to specifications and was re-opened for summer ski jumper usage. Mr. Smith showed photos and videos of the new 1,000 foot long conveyor at Copper Mountain that was granted a variance to operate at its full speed of 240 feet per minute this past summer. Richard Burkley, Board Chair, had no current updates regarding maintenance training.

FINAL COMPLETED MINUTES FROM THIS MEETING WILL BE POSTED AFTER THE BOARD APPROVES THEM AT A FUTURE MEETING.

Updated CPTSB Form 139-16 for reporting tramway incidents

Business and Inspections Branch Passenger Tramway Safety Board

MEMORANDUM TO:

Area Operators

FROM:

Lawrence R. Smith, P.E., Supervisory Tramway Engineer

DATE:

September 14, 2016

RE:

Updated CPTSB Form 139-16

The following is the new CPTSB Form 139-16 for reporting tramway incidents. This form has been modified with an updated contact list.

Please discard ALL copies of the old form that you have and use this updated form when filing a tramway incident with the Board. You can also locate this form on the Board’s web page at www.dora.colorado.gov/professions/tramways. Please contact the Board office at [email protected] or at 303/894-7785 if you have any questions regarding this updated CPTSB form.

LRS/npc

1560 Broadway, Suite 1350, Denver, CO 80202 P 303.894.7800

F 303.894.2310 www.dora.colorado.gov/professions

2016-2017 Passenger Tramway Safety Board

PASSENGER TRAMWAY INCIDENTS Pursuant to Rule 23.2 of the Colorado Passenger Tramway Safety Board’s Rules and Regulations, during the operating season, all “passenger tramway incidents” must be verbally reported to the Board, as soon as reasonably possible, but no later that twenty-four (24) hours after the time of such an incident. A written report must be mailed or faxed to the Board, on forms approved by the Board, within five (5) days of such incident.

Name of Staff Member to whom this incident was orally reported:

____________

Date and Time Incident was orally reported:

Please supply the following information: (Use separate sheet if additional space is required)

______

A. Name of Area: B. Name of Tramway:

Lift ID Number ____________

C. Date of incident: D. Failure Code(s) (required - CPTSB Form 141-99): Description:

E. Cause Code(s) (required - see CPTSB Form 141-99): Description:

F. Action taken as a result of this incident, if any:

G. Length of time the tramway was down:

CPTSB Form 139-16

Page 1

2016-2017 Passenger Tramway Safety Board

PASSENGER TRAMWAY INCIDENTS H. Names, addresses and statements of witnesses, if any:

I. Nature and extent of injuries that may have been suffered, including names and addresses of injured:

J. Designate how tramway was stopped: K. Evacuation (yes or no):

If yes, Rope or Evac. Power Unit (R or EPU):

Note: (Evacuation by Rope or Evac. Power Unit - NOT by Diesel Prime Mover) L. Number of affected persons and total time for evacuation (from time tramway first stopped to the end of evacuation): M. Name, title and signature of person reporting: N. Signature of Designated Agent: ____________________________________________________________________________

Submit this form via mail, fax, or email to: Colorado Passenger Tramway Safety Board 1560 Broadway, Suite 1350 Denver, Colorado 80202 FAX: 303-869-0235 EMAIL: [email protected] Telephone numbers are listed herein to aid in compliance with Rule 23.2

CPTSB OFFICE (303) 894-7785 Larry Smith Joyce Young

CPTSB Form 139-16

Office:

Cell:

Location:

(303) 894-7786 (303) 894-7781

(303) 929-3494 (720) 331-8985

Arvada Denver

Page 2

CPTSB Form 25-06 Items to be Completed Prior to Operation

Business and Inspections Branch Passenger Tramway Safety Board

MEMORANDUM TO:

All Area Operators

FROM:

Lawrence R. Smith, P.E., Supervisory Tramway Engineer

DATE:

September 14, 2016

RE:

CPTSB Form 25-06/Items to be Completed Prior to Operation

This is just a reminder that CPTSB Form 25-06, Items To Be Completed Prior To Opening, is being addressed in the inspectors’ reports as a general deficiency for all tramways. The areas must respond to the general deficiency by stating that the items listed on CPTSB Form 2506 will be completed prior to public operation. This is the only deficiency whereby the response may state, “will be completed prior to public operation.” All other deficiencies must be completed before a license is issued. If there is no response to this general deficiency, the tramway licenses listed in the response will not be issued. Please also note that if the items on CPTSB Form 25-06 are not completed prior to opening to the public, they may be considered a previous deficiency during the unannounced inspection. A copy of CPTSB Form 25-06 follows this memo and is also located on the Board’s web page at https://www.colorado.gov/pacific/dora/Tramway_Applications. Once you get to the page, click on the Prior to Opening tab and then you click on the document. Please contact the Board office at [email protected] or at 303/894-7785 if you have any questions.

LRS/npc

1560 Broadway, Suite 1350, Denver, CO 80202 P 303.894.7800

F 303.894.2310 www.dora.colorado.gov/professions

CPTSB ITEMS TO BE COMPLETED PRIOR TO OPENING During the licensing annual inspection, all of the following items may or may not be in place for the Inspector to observe. For winter operation, it is understood that with early season snow conditions, snow may be nonexistent and that you remove many of these items because of vandalism, construction etc., when the lift is not being operated for public operation.

IT IS THE RESPONSIBILITY OF THE OPERATOR TO HAVE ALL OF THESE ITEMS IN PLACE PRIOR TO OPERATION OF THE LIFT FOR PUBLIC USE. X.1.1.5.1

Vertical clearances. Install appropriate barriers where there is inadequate clearance under the lift line.

X.1.1.5.1

Vertical clearances. Remove temporary closure barriers that do not have adequate clearance under the lift.

X.1.1.9

Loading and unloading areas. Properly prepare the surface at loading and unloading areas.

X.1.2.6

Brakes and rollback devices. Torque test all brakes according to the approved torque test procedures.

X.1.2.10.2

Counterweights. Install appropriate fencing around counterweights to prevent unauthorized persons from coming in contact with or passing under counterweight.

X.1.5

Provisions for operating personnel. Supply operating instructions and emergency procedures in all operators and attendants stations.

X.2.3.2

Stop Gates. Where appropriate, properly install all removable stop gate wands or ropes.

Annex F.7

Provisions for operating personnel. Provide properly certified fire extinguishers that are correctly hung in all operator and attendants stations and in the machine room.

X.2.13.4

Emergency lighting. For those lifts that operate at night, verify that the emergency lighting is properly installed and is functional.

X.3.1.2

Signs. Post all required signs at loading and unloading areas.

X.3.2.1.5

First aid. Provide all required first aid equipment, personnel, and supplies prior to public operation.

X.3.2.4.1

Control of passengers. Install appropriate fencing and gates at the loading area for the marshaling of passengers.

X.3.3

General (Maintenance). Complete all tramway maintenance that is defined on the maintenance schedule as required prior to public operations.

If these items are not completed upon opening to public operation, they may be considered a PREVIOUS DEFICIENCY during the Unannounced Inspection. g:\business and technical\tramway\forms\prior to operation form-06

CPTSB FORM 25-06

Temporary blanket variance for relief from ANSI Rule 3.1.4.3.4.3 Incorrect attachment

Business and Inspections Branch Passenger Tramway Safety Board

MEMORANDUM TO:

Area Operators

FROM:

Lawrence R. Smith, P.E. Supervisory Tramway Engineer

DATE:

September 14, 2016

RE:

Temporary blanket variance for relief from ANSI Rule 3.1.4.3.4.3 Incorrect attachment

At the August 25, 2016 meeting, the Board granted a temporary blanket variance for relief from ANSI Rule 3.1.4.3.4.3 Incorrect attachment beginning August 25, 2016 through October 15, 2017. The following requirements for this blanket variance are as follows: 3.1.4.3.4.3 Incorrect attachment (Previously 3.1.4.3.7 in ANSI 1992) May 2, 2011 to Present: The designer shall incorporate provisions to stop the grip and carrier in a controlled fashion when a grip is incorrectly attached to the rope. a) monocable systems The path of the rope from the terminal where passengers are loaded shall be approximately level or inclined upward for a length at least equal to: =

V 2 (ft/minute) 14,400

L (meters) =

V 2 (meter/sec) 1.22

L (feet)

or

L = Length of level or inclined upward rope V = rope speed during passenger loading at that station An incorrectly attached grip tripping the last checking switch shall cause the rope to stop in a distance not greater than the calculated length “L” or in the case where a greater length of level or inclined upward rope is provided, in a distance not greater than the length provided. b) bicable systems On bicable systems terminals, the designer shall incorporate provisions to stop in a controlled fashion an incorrectly attached carrier after the grip attachment point. A sign, visible to the operating personnel in the station requiring the reduced rope speed, is required. It shall state the “maximum rope speed during loading” (see table D-1(s)) if the aerial lift must be slowed below the designed speed to comply with 3.1.4.3.4.3(a).

1560 Broadway, Suite 1350, Denver, CO 80202 P 303.894.7800

F 303.894.2310 www.dora.colorado.gov/professions

May 15, 2000 to May 2, 2011: The designer shall incorporate provisions to stop the grip and carrier in a controlled fashion when a grip is incorrectly attached to the rope. The path of the rope from the terminal where passengers are loaded shall be approximately level or inclined upward for a length at least equal to: L (feet)

=

V2(ft/minute) 14,400

L (meters)

=

V2(meter/sec) 1.22

or

L = Length of level or inclined upward rope V = rope speed during passenger loading at that station An incorrectly attached grip tripping the last checking switch shall cause the rope to stop in a distance not greater than the calculated length “L” or in the case where a greater length of level or inclined upward rope is provided, in a distance not greater than the length provided. Jan 1, 1994 to May 15, 2000 The designer shall incorporate provisions to stop the grip and carrier in a controlled fashion when a grip is incorrectly attached to the rope. The path of the rope from the terminal where passengers are loaded shall be approximately level or inclined upward for a length at least equal to: L (feet)

=

V2(ft/minute) 14,400

L (meters)

=

V2(meter/sec) 1.22

or

L = Length of level or inclined upward rope V = rope speed during passenger loading at that station An incorrectly attached grip tripping the last checking switch shall cause the rope to stop in a distance not greater than the calculated length “L” or in the case where a greater length of level or inclined upward rope is provided, in a distance not greater than the length provided. Nov. 1, 1991 to Jan 1, 1994 At each carrier launching position (any area where a grip is designed to attach to the haul rope), devices shall be installed that will stop the aerial lift if any grip incorrectly attaches to the haul rope. When a grip is detected to be incorrectly attached to the rope, the designer shall incorporate provisions to stop the grip and carrier so that it will come to a stop in a controlled fashion, or the path of the rope from the terminal where passengers are loaded shall be approximately level or inclined upward for a length at least equal to the calculated stopping distance. The level or sloping length of rope shall be measured from the last switch where the grip is checked for attachment to the rope. Calculated stopping distance for this subsection is equal to: D=

V2(ft/minute) 14,400

D= V=

stopping distance rope speed during passenger loading at that station

or

D=

V2(meter/sec) 1.22

1560 Broadway, Suite 1350, Denver, CO 80202 P 303.894.7800

F 303.894.2310 www.dora.colorado.gov/professions

Upon clamping to the haul rope or haul-carrying rope, the carrier velocity and rope speed shall not vary sufficiently to introduce unduly either passenger discomfort or mechanical wear.

The Board determined that: 1.2.3 (a)

The granting of such an exception would be consistent with, and would aid in, implementing the legislative policy set forth in C.R.S. 25-5-701; and

1.2.3 (b)

Compliance with applicable rules and regulations from which an exception is sought would create an unreasonable operational or design.

Please contact the Board office at 303/894-7785 if you have any questions regarding this variance.

LS/nc

1560 Broadway, Suite 1350, Denver, CO 80202 P 303.894.7800

F 303.894.2310 www.dora.colorado.gov/professions

2015-2016 Incident and Component Log Reports

COLORADO PASSENGER TRAMWAY SAFETY BOARD

INCIDENT REPORT 01-Jul-15

Through 30-Jun-16

ALL AREAS BY FAILCODE DATE OF INCIDEN MANUFACTURER T 1 2

7/3/2015 DOPPELMAYR 3/13/2016 POMA

LIFT LIFT FAIL YEAR TYPE CODE

FAILURE DESCRIPTION

CAUSE CODE

CAUSE

1990

314 .7.2

NDT INDICATION BEYOND REPAIR DS-104 GRIP BODY

2.3

FATIGUE

1996

414 2.0

PASS FELL FROM CHAIR 108 FEET BELOW MIDWAY UNL

8.1

PASS LOST CONCIOUSNESS BEFORE FALL

3 12/20/2015 RIBLET

1969

412 3.8.1

GRIP ON CHAIR 115 CAME OUT OF ROPE

2.0

LOADING ERROR CAUSING CHAIR TO HIT GUIDAGE

4

9/8/2015 LIFT ENGR

1970

412 3.8.7

DEROPEMENT OF TWR 1 HS

2.2

MECHANICAL ERROR - ROLLBACK DURING MAINT TESTIN

5

1/8/2016 SCHIPPERS

1998

651 34.7.

CRACK IN UPPER BULLWHEEL

2.4

WEAR IN BULLWHEEL

6 12/26/2015 POMA

1985

413 4.1

GEARBOX INPUT SEAL FAILUREDUE TO BEARING FAILUR 2.5

MECHANICAL MALFUNCTION

7

7/22/2015 DOPPELMAYR

2013

316 4.10

CRACK INDICATION IN WELD OF MAIN DRIVE SHAFT

2.7

UNKNOWN

8

2/29/2016 POMA

2008

328 4.2

GRIP STUCK IN PRINCIPAL RAIL

2.3

BEARING FAILURE ON LEAD SUPPORT ROLLER

9

4/14/2016 HERON POMA / LIFT EN

1984

412 4.3.1

SERVICE BRAKE PUMP MOTOR FAILED

2.3

FATIGUE

10

9/14/2015 HERON POMA / LIFT EN

1972

412 4.3.3

HS ROLLBACK DID NOT HOLD LOAD

2.3

11

2/28/2016 LEITNER-POMA

2.3

12

4/3/2016 POMA

2.4

FOUND DURING DYNAMIC TESTING AND REPLACED BRAK

2015

413 4.3.3

HS ROLLBACK FAILED

2005

314 4.3.3

HS ROLLBACK FAILED DURING MONTHLY BRAKE INSPEC 2.5

FATIGUE - UNKNOWN MECHNICAL MALFUNCTION

13

4/23/2016 LIFT ENGR

1978

412 4.3.4

BW DROPDOG FAILED

2.3

FATIGUE, BROKEN WELD

14

1/23/2016 GARAVENTA CTEC

1999

414 4.4

THE APU SPED UP WITHOUT THE COMMAND TO DO SO

2.9

FLYWHEEL PROX SENSOR FAILED

15

4/19/2016 LIFT ENGR

2.4

1978

413 4.5.4

HYDRAULIC VALVE BODY FAILURE

16

2/1/2016 DOPPELMAYR

2005

314 4.6

DRIVELINE FAILURE BETWEEN ELEC MTR AND GEARBOX 2.5

SHEARED DRIVELINE IN FRACTURED WELD

17

5/24/2016 LEITNER-POMA

2006

328 4.6

FOUND 3 CRACKS IN TOP FLANGE OF UPPER BW

2.7

POSSIBLE FATIGUE

18

1/11/2016 POMA

1996

314 4.6

DETACH MECHANISM TIRE AXLE FAILURE

2.3

FATIGUE

19

7/13/2015 POMA

1999

314 4.6

OVERRUNNING CLUTCH IN CONTOUR FAILED DRV TERM 2.3

FATIGUE

20

7/10/2015 POMA

1990

314 4.6

364 SHEAVE BEARING FAILURE

2.4

WORN OUT BAD BEARING

21

1/3/2016 POMA

2012

331 4.6

CRACK IN FLANGE OF PTO DRIVE TERMINAL

2.3

CASTING FLAW, SEVERE COLD

1998

314 4.7.1 7.1.2 MONTHLY INSPECTION FOUND CRACKS IN TWRS #1 & #7 2.3

22

1/22/2016 DOPPELMAYR

WEAR

FATIGUE

23

2/5/2016 DOPPELMAYR

1990

314 4.7.2

NON-REPAIRABLE NDT INDICATION GRIP BODY

2.3

FATIGUE

24

2/15/2016 DOPPELMAYR

1990

314 4.7.2

NON-REPAIRABLE NDT INDICATION ON DS-104 GRIP BOD 2.3

FATIGUE

25

4/19/2016 HERON

1975

412 4.7.2

NDT INDICATION AFTER GRINDING ON GRIP

3.1

NDT INDICATION

26

4/26/2016 GARAVENTA CTEC

1996

328 4.7.3

CRACKS IN ALL 8 LOWER HUB GUSSETS ON DRV BW

2.3

FATIGUE

27

2/3/2016 POMA

1990

314 4.7.3

CRACKED WELD HOLDING PRINCIPLE RAIL

2.3

FATIGUE

28

3/1/2016 RIBLET

1979

412 4.7.3

WELD BROKE ON CABLE TACH ARM

2.3

FATIGUE

29

4/1/2016 POMA

1993

314 4.7.4

BROKEN X-Y BOLT TWR 6 HS

2.3

FATIGUE

1

EVAC ROPE INJURY AUX

A

DATE OF INCIDEN MANUFACTURER T

LIFT LIFT FAIL YEAR TYPE CODE

FAILURE DESCRIPTION

CAUSE CODE

CAUSE

30

4/10/2016 POMA

1999

314 4.7.4

BROKEN X-Y BOLT HS TWR 13

2.3

FATIGUE

31

4/14/2016 POMA

1994

314 4.7.4

BROKEN TIRE HOUSING BOLTS

2.3

FATIGUE

32

2/6/2016 POMA

2004

314 4.7.4

THREE TIRE AXLE HOUSING BOLTS FAILED

2.5

MECH MALFUNCTION - MAY HAVE BEEN LOOSE

33

1/12/2016 POMA

1990

314 4.7.4

BROKEN SERVICE BRAKE PIVOT PIN

2.3

FATIGUE

1994

314 4.8

CRACKS IN BW SPOKES #1&2 NEAR HUB

2.3

FATIGUE

1986

314 4.8

DRV BW CRACK IN SPOKE NEAR HUB RETURN BW CRAC 2.3

FATIGUE

34 35

9/2/2015 GARAVENTA CTEC 7/16/2015 POMA

EVAC ROPE INJURY AUX

36

4/3/2016 DOPPELMAYR

2006

314 5.1

LOST POWER ON CONTROL SWITCH AND LOST TOTAL C 2.6

BURNED UP AND MELTED WIRE CAUSED FUSE IN CABNET

A

37

2/13/2016 DOPPELMAYR

1999

314 5.1

INCOMING POWER FAILURE-TENSION FAULT WOULD NO 1.5

ROCK FALL TOOK OUT POWER LINE

A

38

7/24/2015 GARAVENTA CTEC

1996

328 5.2

LIFT ACCELERATED WITHOUT COMMAND

2.6

FAULTY CONTROL BOARD ON DRIVE

39 12/29/2015 LIFT ENGR

1982

413 5.2

BEARING FAILURE ON ELEC MTR

2.7

2.4

UNKNOWN

40

1993

314 5.2

LIFT SPED UP AND SLOWED DOWN WITHOUT COMMAND 2.6

2.7

ENCODER WAS FAILING

3/14/2016 POMA

41 11/19/2015 DOPPELMAYR

1991

414 5.3

LIFT ACELERATED BEYOND MAX SPEED

42 12/23/2015 POMA

2011

314 5.3

EMERGENCY STOP CIRCUIT CHANNEL 2 DIAGNOSTIC W 2.2

2.6

WHEN INITIAL FAULT WAS NOT FOUND, BYPASS SWITCH

43

2007

316 5.3

LOW VOLTAGE FAILURE, COMM FAILURE, COLLISION OF 1.4

2.1

PROBABLE LIGHTNING STRIKE AND OPERATOR ERROR AF

8/3/2015 POMA

5.5

2.6

44

2/14/2016 SKI LIFT INT'L/RIBLET

1991

412 5.3

LIFT WOULD NOT RESET

2.6

45

2/12/2016 DOPPELMAYR

DIODES IN RECTIFIER IN LOW VOLTAGE CONTROLS FAILE

GROUND ON CONTROL CABINET LED WAS DROPPING DER

1991

326 5.3.1

E-SHUTDOWN FAILED TO STOP LIFT - SET BRAKE

2.6

RELAY IN DIESEL CONTROL BOX NOT FULY SET

4/7/2016 POMA

2007

316 5.3.2

DUEL CLUTCH SYSTEM OUTPUT MODULE FAILED

2.6

ELECTRICAL MALFUNCTION

47 12/30/2015 POMA

1985

413 5.3.2

NON-RESETABLE PLC ERROR

2.6

ELECTRICAL MALFUNCTION

48

2005

316 5.3.2

PLC FAULT

2.7

UNKNOWN - PLC HAD TO BE PWERED OFF THEN BACK ON

46

49

1/11/2016 POMA 2/7/2016 DOPPELMAYR

2013

314 5.5

LIFT WOULD NOT START - LIFT CLEARED ON APU UNTIL

2.6

FAILED ANTI-COLLISION SWITCH WOULD NOT ALLOW LIFT

50 11/21/2015 DOPPELMAYR

1997

314 5.5

LIFT ACELERATED TO 110% ON APU

2.6

THE ELECTRONIC FUEL CONTROL MODULE FAILED

51

1991

326 5.5

RELAY IN DIESEL CONTROL BOX REMOVED FOR MAINT. 2.2

MAINT. ERROR

1978

412 5.5

NEW THROTLE SERVO WAS REVERSED, LIFT ACCELERA 2.6

ELEC. MALFUNCTION

2/14/2016 DOPPELMAYR

52 11/22/2015 LIFT ENGR 53

1/10/2016 POMA

2008

328 5.5

SERVICE BRAKE CARD FAILED

54 12/24/2015 POMA

1996

314 5.5

APU WENT TO FAST SPEED UPON START UP. SLOW SPE 2.5

55

1975

412 6.1

56 11/18/2015 LEITNER-POMA

2014

316 6.1

CHAIR DAMAGE WHEN COMFORT BAR CAUGHT ON TWR 1.1

100+ GUST OF WIND

57

2/7/2016 POMA

2008

328 6.1

TRAILING DOOR ON CABIN 37 BROKE OFF

2.3

CRACKED ALONG TOP ANGLE PLATE OF DOOR NEAR PIVO

58

8/1/2015 POMA

1986

326 6.1.3

CABIN 96 COLLIDED WITH CABIN 11 WHEN ZONE CLEAR

2.1

OPERATOR ERROR - LIFT STARTED UNDER BYPASS AND

59 11/20/2015 LEITNER-POMA

2006

328 6.11

CABIN MISSED ENTRY RAIL UPON ENTERING BOTTOM T 1.1

GUST OF WIND PUSHED CABIN SIDEWAYS UPON ENTERIN

60

4/2/2016 POMA

1990

314 6.11

LATERAL ROLLER JAMMED ENTERING TOP TERM

NUT HOLDING LATERAL ROLLER IN PLACE MISSING CAUSI

61

1/1/2016 POMA

1986

314 6.11

CARRIER CAUGHT ON TRANSFER RAIL AND KICKED OUT 2.7

62

2/10/2016 POMA

1972

543 6.12

CARRIER FAILUREBOLT FROM GRIP WORKED ITS WAY O 2.7

63

1/7/2016 POMA

1972

543 6.2

INNER SPRING ON PLATTER BROKE

2.3

FATIGUE

1990

314 6.7

NDT TESTING FOUND CRACK IN GRIP

3.1

NON-REPAIRABLE NDT INDICATION

8/24/2015 HERON

64 12/18/2015 DOPPELMAYR

4.7.3 CHAIR 107 CRACK IN WELD @ STEM TO BAIL

2

A

2.3

FATIGUE 2.6

2.3

THROTTLE BODY OR INPUT TO IT STUCK IN COLD WEATHE FATIGUE

2.2

TRANSFER RAIL PIN POPPED OUT OF HOUSING 2.3

FATIGUE - UNKNOWN

R

A

A

A

DATE OF INCIDEN MANUFACTURER T

LIFT LIFT FAIL YEAR TYPE CODE

FAILURE DESCRIPTION

CAUSE CODE

CAUSE

65 12/21/2015 DOPPELMAYR

1991

326 6.7

25 MM INDICATION FOUND IN FIXED JAW OF DS-108 GRIP 3.1

NON-REPAIRABLE NDT INDICATION

66

1/4/2016 DOPPELMAYR

1990

314 6.7

NDT INDICATION ON GRIP AXLE

3.1

NON-CORRECTABLE NDT INDICATION

67 12/26/2015 DOPPELMAYR

1990

314 6.7

NDT INDICATION ON ACTUATING AXLE BORE GUSSET

3.1

NON-REPAIRABLE NDT INDICATION

68

2008

328 6.7

NDT INDICATION IN CRITICAL AREA O FGRIP

3.1

NDT INDICATION

69 11/13/2015 GARAVENTA CTEC

1996

314 6.7

OUTSIDE GUIDE ROLLER FELL OFF CARRIER 188

2.7

UNDER INVESTIGATION

70

2015

314 6.7

GRIP GUIDE CAME OUT OF GRIP RAIL

2.9

CHAIR 33 HELD BACK BY CLOSURE ROPE

8/17/2015 LIFT ENGR

1977

412 6.7

GRIP 125 HAD NDT INDICATION IN FIXED JAW

3.1

NDT INDICATION

3/9/2016 LIFT ENGR

71 72

1/9/2016 DOPPELMAYR

4/2/2016 LEITNER-POMA

1973

412 6.7

FRONT GRIP NEEDLE FAILED ON CARRIER 33

2.3

FATIGUE

73

10/6/2015 POMA

1992

314 6.7

NDT INDICATION ON GRIP 922025 CHAIR 31

3.1

NDT INDICATION REJECTING JAW

74

1/12/2016 POMA

1998

314 6.7

INDICATIONX IN GRIP AXLE PROPOGATING FROM BOLT

3.1

75

7/23/2015 POMA

2003

314 6.7

GRIP DETACHED FROM HAUL ROPE WHEN STOPPED IN

2.2

76

2.3

NDT INDICATION FOUND MAINT ERROR - WORKCHAIR PLATFORM NOT LOWERED U

7/21/2015 POMA

1981

413 6.7

INDICATION OBSERVED IN FIXED JAW BEYOND NDT CRIT 3.1

NDT INDICATION

77 12/27/2015 POMA

1989

314 6.7

EXTERNAL SPRING FAILED ON CHAIR #103

2.3

FATIGUE POSSIBLY AGGREVATED BY COLD TEMPERATUR

78

7/6/2015 POMA

1993

314 6.7

7 FIXED GRIP JAWS FAILED NDT

3.1

NDT INDICATIONS

79

8/11/2015 POMA

1987

314 6.7

4 FIXED GRIP JAWS FAILED NDT

3.1

NDT INDICATIONS

80

12/9/2015 POMA

1994

314 6.7

SIEZED COMPRESSION ROLLER CHAIR 47

2.4

WORN OUT BEARING

81

5/17/2016 RIBLET SKI LIFT INT

1975

412 6.7

NDT INDICATIONS IN CARRIER GRIPS 42, 84 ON BARREL 3.1

NDT INDICATION UNKNOWN

82

1/7/2016 POMA

1972

543 6.8

POMA GRIP LOOSENED AND SLIPPED BACKWARDS

83

1/9/2016 POMA

1995

314 6.9

LATERAL ROLLER FELL OFF CAUSING GRIP TO NOT ATT 2.5

2.7

NUT HOLDING ROLLER CAME LOOSE

84

1/9/2016 POMA

1995

314 6.9

LATERAL ROLLER FELL OFF AS CHAIR EXITED TOP TER

2.5

85

9/9/2015 POMA

2005

427 7.1

CRACK IN TWR 2 TUBE AT TOP OF BASEPLATE GUSSET

3.1

86

10/7/2015 POMA

2000

316 7.1.2 7.1.3 INDICATIONS ON CROSSARM TO LIFTING FRAME ON TW 2.3

FATIGUE

87

2/23/2016 DOPPELMAYR

1984

542 7.5

NUT HOLDING ROLLER CAME LOOSE 2.3

FATIGUE ? UNKNOWN

TWR 21 LS COMBO ASSY FAILURE

2.3

ASSY FAILED AT WELD

2.3

FATIGUE

88

9/22/2015 POMA

1986

326 7.5

CRACK FOUND ON TWR 22 HS SHV ASSY

89

4/7/2016 POMA

1995

314 7.5

RUBBER BUSHING FAILED CAUSING ROCKER TO TILT ON 2.4

90

12/3/2015 POMA

1998

316 7.5

DRV TERM 4S PORCH SHV #3 SEIZED

2.7

91

3/25/2016 DOPPELMAYR

1986

314 7.6

LINE SHV AXLE BACKED OUT TWR 16 LS

2.5

92

8/6/2015 HERON/POMA

ONE SIDE OF RUBBER BUSHING HAD COLLAPSED 2.4

POSSIBLE SNAP RING WORKED LOOSE MECHANICAL MALFUNCTION

1989

412 7.6

BAD BEARING, SHV BEGAN TO WOBBLE TWR 9 HD #6

2.4

WEAR

93 11/18/2015 LIFT ENGR

1985

413 7.6

SHEAVE FAILURE

2.5

SHV BOLTS FAILED TWR 14 LS #4 SHV

94

8/19/2015 POMA

1993

314 7.6

BROKEN HUB ON SHV 2 ON LIGHT SIDE OF TWR 10

2.2

MAY HAVE BEEN DAMAGED WHEN SHEAVE WAS REBUILT

95 12/29/2015 CTEC

1982

413 8.1

PASSENGER SLIPPED OUT NEAR LOAD RAMP AND HUNG 2.0

96

1/9/2016 DOPPELMAYR

2.1

2000

316 8.1

SKIER FALL FROM LIFT TWR 20 SPROX 28 FEET DOWN

2.0

SKIER ERROR - RAISED ARMBAR AND SLIPPED FROM CAR

412 8.1

SKIER FELL FROM LIFT NEAR TWR 4 HS

2.0

SKIER ERROR

98 12/19/2015 POMA

1994

314 8.1

SNOWBOARDER SLIPPED FROM CHAIR PAST TWR 1

2.0

SKIER ERROR - EVAC'D BY ROPE

99

2005

316 8.1

OFF DUTY EMPLOYEE FELL BETWEEN TWRS 4 & 5

2.0

REACHING FOR SOMETHING IN HIS BACKPACK

2/27/2016 HERON POMA / LIFT EN

2/18/2016 POMA

3

R

PASS DID NOT MAKE IT FULLY INTO CHAIR AT LOADING

1984

97

EVAC ROPE INJURY AUX

R

DATE OF INCIDEN MANUFACTURER T 100

FAILURE DESCRIPTION

CAUSE CODE

CAUSE

1996

414 8.1

PASSENGER FELL FROM CHAIR PAST MIDWAY UNLOAD

2.0

SKIER ERROR

101 12/23/2015 SKI LIFT INT'L/RIBLET

1991

412 8.1

SKIER FELL FROM LIFT

2.0

SKIER ERROR

102 12/10/2015 POMA

1990

314 8.2

GUEST JUMPED FROM CARRIER

2.0

SKIER ERROR

103

1/2/2016 POMA

LIFT LIFT FAIL YEAR TYPE CODE

1987

412 8.2

SKIER FELL FROM LIFT TWR 2

2.0

BAR DOWN AND SKIER SLID UNDERNEATH

104 12/27/2015 RIBLET

2/27/2016 POMA

1969

412 8.2

SKIER JUMPING FROM CHAIR PAST UNLOAD POINT

2.0

SKIER JUMPED FROM CARRIER PRIOR TO COMING TO A C

105 11/21/2015 DOPPELMAYR

2013

314 9.1

GRIP ON TUCK TRIPPED SWITCH

2.1

WRONG SWITCH WAS LOOKED AT UNTIL 24 MIN. INTO EVA

106

1996

328 9.1

PASSENGER LEFT ON LIFT AFTER SHUTTING DOWN FOR 2.1

PASSENGERS SLIPPED BY OPERATOR AND PAST SIGNS UNKNOWN CLEARED LINE OF PASSENGERS AND MANUAL

11/7/2015 GARAVENTA CTEC

107 11/22/2015 POMA

2008

328 9.1

SPACING ISSUES CAUSING CABINS TO COLLIDE

108

2007

770 9.2

FOOT PASS GOT FOOR AUGHT IN KICK PLATE AT TOP TE 2.0

2/12/2016 SUNKID

4

2.7

PASS ERROR

EVAC ROPE INJURY AUX

A

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

2015

314

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

5.1.1

2-800 AMP FUSES FAILED FOR DRIVE

2.7

1

2/28/2016

2

12/6/2015

CTEC

1988

413

5.2

DRIVE BOARD FAILED

2.6

3

12/26/2015

CTEC

1982

413

5.3.2

PLC MEMORY WIPED CLEAN. SWAPPED WITH SPARE PLC

2.7

4

3/27/2016

DOPPELMAYR

2001

314

4.3.4

ROLLBACK BRAKE SHUTTLE VALVE FAILED

2.9

5

1/4/2016

DOPPELMAYR

1986

314

4.6

PULLEY AND SHAFT WALLOWED OUT DRV TERM

2.4

6

12/28/2015

DOPPELMAYR

1988

314

4.7.3

CRACK IN INCOMING PROX BRACKET

2.3

7

1/25/2016

DOPPELMAYR

1986

314

4.7.3

BROKEN WELD ON A TIRE RIM

2.3

8

3/22/2016

DOPPELMAYR

2001

314

5.3

SNOCAT CRUSHED SAFETY GATE

2.1

9

12/9/2015

DOPPELMAYR

2008

328

5.4.

TWR 11, LOOP 1 EFFECTOR SWITCH FAILED

2.6

10

1/3/2016

DOPPELMAYR

2001

543

5.4.1

BROKEN BRITTLE BAR

2.6

11

3/30/2016

DOPPELMAYR

1988

314

6.1

BROKEN FOOTREST SPRING CARRIER 139

2.3

12

12/16/2015

DOPPELMAYR

1985

314

6.1

BROKEN FOOTREST SPRING CARRIER 129

2.3

13

12/2/2015

DOPPELMAYR

1985

314

6.1

BROKEN FOOTREST SPRING CARRIER 112

2.3

14

1/6/2016

DOPPELMAYR

1985

314

6.1

BROKENT FOOTREST SPRING CARRIER 109

2.3

15

2/26/2016

DOPPELMAYR

1985

314

6.1

BROKEN FOOTREST SPRING CARRIER 24

2.3

16

3/17/2016

DOPPELMAYR

1985

314

6.1

BROKEN FOOTREST SPRING CARRIER 108

2.3

17

3/22/2016

DOPPELMAYR

1985

314

6.1

BROKEN FOOTREST SPRING CARRIER 46

2.3

18

3/25/2016

DOPPELMAYR

1985

314

6.1

BROKEN FOOTREST SPRING CARRIER 57

2.3

19

12/4/2015

DOPPELMAYR

1985

314

6.1

BROKEN FOOTREST SPRING CARRIER 21

2.3

20

12/10/2015

DOPPELMAYR

1985

314

6.1

BROKEN FOOTREST SPRING CARRIER 88, 89

2.3

21

12/30/2015

DOPPELMAYR

1985

314

6.1

BROKEN FOOTREST SPRING CARRIERS 16,31

2.3

22

2/8/2016

DOPPELMAYR

1974

413

6.1

BROKEN FOOTREST SPRING CARRIER 19

2.3

23

2/14/2016

DOPPELMAYR

1972

543

6.1

BROKEN RETRACTION SPRING #9

2.3

24

2/15/2016

DOPPELMAYR

1972

543

6.1

BROKEN RETRACTION SPRING #12

2.3

25

2/6/2016

DOPPELMAYR

1972

543

6.1

BROKEN RETRACTION SPRING #46

2.3

26

3/13/2016

DOPPELMAYR

1972

543

6.1

BROKEN RETRACTION SPRING #31

2.3

27

1/26/2016

DOPPELMAYR

1972

543

6.1

BROKEN RETRACTION SPRING #5

2.3

28

1/23/2016

DOPPELMAYR

1972

543

6.1

BROKEN RETRACTION SPRING #11

2.3

29

1/1/2016

DOPPELMAYR

1994

314

6.7

2 BROKEN WASHERS DS 104 GRIP

2.3

1

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

30

1/10/2016

DOPPELMAYR

1994

314

6.7

BROKEN GRIP SPRING WASHER CHAIR 11

2.3

31

4/26/2016

DOPPELMAYR

1992

314

6.7

FOUND BROKEN ROLL PIN FOR JAW LINK TO MOVABLE JAW

2.3

32

1/20/2016

DOPPELMAYR

1992

314

6.7

NDT SECONDARY SPRING HOUSING CRACK DS-104 GRIP 118

2.3

33

7/3/2015

DOPPELMAYR

1990

314

6.7

NDT INDICATION IN GRIP HOUSING

2.3

34

2/5/2016

DOPPELMAYR

1994

314

6.7

BROKEN WASHER IN SPRING PACK CHAIR 15

2.3

35

2/14/2016

DOPPELMAYR

1994

314

6.7

BROKEN GRIP SPRING WASHER CHAIR 104

2.3

36

12/7/2015

DOPPELMAYR

1994

314

6.7

BROKEN DISC SPRING WASHER CHAIR 3

2.3

37

1/22/2016

DOPPELMAYR

1994

314

6.7

BROKEN DISC GRIP SPRING CHAIR 13

2.3

38

1/28/2016

DOPPELMAYR

1986

328

6.7

BROKEN SPIRAL ROLL PIN ON FRONT GRIP ON LINK PIN CABIN 71

2.3

39

1/14/2016

DOPPELMAYR

1986

328

6.7

BROKEN SPIRAL ROLL PIN ON FRONT GRIP ON LINK PIN CABIN 109

2.3

40

3/12/2016

DOPPELMAYR

1986

328

6.7

BROKEN PIN, FRONT GRIP,LINK PIN TO MOVABLE JAW CABIN 105

2.3

41

1/4/2016

DOPPELMAYR

1986

328

6.7

BACK GRIP CABIN 84 FAILED TO CLOSE DUE TO LACK OF LUBE AND COLD TEMPS

2.2

42

4/7/2016

DOPPELMAYR

1986

328

6.7

FRONT GRIP ON CABIN 100 LEFT UPPER TERM W/O CLOSING

2.7

43

2/5/2016

GARAVENTA CTEC

1993

314

3

CRACK ON MOTOR ROOM DECK

2.3

44

9/23/2015

GARAVENTA CTEC

1998

314

4.1

CHIPPED TOOTH ON SUN GEAR IN PLANETARY

2.7

45

12/4/2015

GARAVENTA CTEC

1997

414

4.1

GEARBOX OIL COLOLER INTAKE HOSE FAILED

2.3

46

11/11/2015

GARAVENTA CTEC

1996

328

4.6

4.7.

CRACKED SEAM IN GUIDERAIL BOX TUBE ENTRY RET TERM

2.3

47

11/7/2015

GARAVENTA CTEC

1996

328

4.6

4.7.

BROKEN WELD GUIDE RAIL AT YOKE CONN DRV TERM

2.3

48

11/14/2015

GARAVENTA CTEC

1996

328

4.6

4.7.

CRACKED SEAM IN GUIDERAIL BOX TUBE ENTRY

2.3

49

11/7/2015

GARAVENTA CTEC

1996

328

4.6

4.7.

CRACKED SEAM IN GUIDERAIL BOX TURE DRV TERM

2.3

50

11/5/2015

GARAVENTA CTEC

1996

328

4.6

4.7.

CRACK IN RAIL WELD IN RUNNING RAIL RET TERM

2.3

51

11/5/2015

GARAVENTA CTEC

1996

328

4.6

4.7.

FAILED REPAIR IN GUIDERAIL COUP AREA RET TERM

2.3

52

11/17/2015

GARAVENTA CTEC

1996

328

4.6

4.7.

BW LINER RETAINING RING CRACKING

2.3

53

1/29/2016

GARAVENTA CTEC

1996

330

4.7.3

INDICATION ON THE L SUPPORT FOR 12X12 BOX AT TIRE 7

2.3

54

3/24/2016

GARAVENTA CTEC

1996

328

4.7.4

BOLT FELL OUT ON MAIN CATWALK TWR 1

2.7

55

11/18/2015

GARAVENTA CTEC

1996

328

4.7.4

BROKEN ADJ BOLT ENTRY 3-SHV BEAM

2.3

56

8/15/2015

GARAVENTA CTEC

1997

414

5.3

REPLACED SEVERAL DIODE BLOWN BY LIGHTNING STRIKE TWR 6

1.4

57

12/27/2015

GARAVENTA CTEC

1996

328

5.5

EMERGENCY STOP COINTACT BUTTON FAILED IN OPEN POSITION

2.4

58

1/18/2016

GARAVENTA CTEC

1995

314

6.1

BROKEN HEIM JOINT ON FOOTREST CARRIER 26

2.3

2

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

59

2/29/2016

GARAVENTA CTEC

1995

329

6.1

CABIN #8 DOORS FAILED TO CLOSE

2.0

60

1/9/2016

GARAVENTA CTEC

1993

314

6.7

BROKEN TRACTION PLATE CARRIER 60

2.3

61

12/11/2015

GARAVENTA CTEC

1995

329

6.7

BROKEN TRACTION PLATE CHAIR 18

2.4

62

7/9/2015

GARAVENTA CTEC

1995

329

6.7

BROKEN CUP WASHER IN GRIP SPRING PACK #54

2.3

63

7/13/2015

GARAVENTA CTEC

1995

329

6.7

BROKEN CUP WASHER IN GRIP SPRING PACK #42

2.3

64

9/14/2015

GARAVENTA CTEC

1996

328

7.6

BAKED SHV LINER TWR 8 SHV 4 LS

2.4

65

3/19/2016

GARAVENTA CTEC

1996

328

7.6

BEARING FAILURE ENTRY GS #2 RET TERM

2.3

66

1/15/2016

HERON

1975

412

4.3.2

COTTER PIN MISSING FROM SERVICE BRAKE SHOE SHAFT STARTED MOVING

2.5

67

1/6/2016

HERON

1975

412

5.5

VONTACTOR FOR SPACING CLUTH FAILED AT TOP TERM

2.6

68

8/24/2015

HERON

1975

412

6.1

CHAIRS 46, 175 BROKEN BACK STRAP, CENTER TOP

2.4

69

9/3/2015

HERON POMA

1979

543

4.6

DRIVE SHAFT COUPLE SET SCREW LOOSE AND CAUSED EXCESSIVE WEAR

2.3

70

2/1/2016

HERON-WRIGHT / LIFT EN

1979

412

5.2

POWER SUPPLY BOARD FAILED AT DRIVE TERM

2.6

71

12/23/2015

LEITNER-POMA

2006

328

4.4

FAILED AUX FUEL PUMP FOR AUX #1

2.7

72

12/26/2015

LEITNER-POMA

2015

314

4.6

CONTOUR COG BROKEN TOOTH

2.3

73

1/7/2016

LEITNER-POMA

2006

328

4.6

TWO BROKEN BOLTS ON PULLEY NEXT TO CONTOUR GEARS

2.7

74

1/26/2016

LEITNER-POMA

2006

328

4.6

BROKEN AXLE MID TERM HS CADENCE CLUTCH #2

2.3

75

3/16/2016

LEITNER-POMA

2006

328

4.6

BROKEN AXLE FOR #2 HS CLUTCH AT MID TERM

2.7

76

10/14/2015

LEITNER-POMA

2010

314

4.7.1

2 RET CONTOUR TIRE BEAM BRACKETS CRACKED

2.3

77

11/6/2015

LEITNER-POMA

2010

314

4.7.3

CRACK AT GRIP FORCE OPENING RAIL FLEX ZONE

2.3

78

12/17/2015

LEITNER-POMA

2010

314

4.7.4

RET ARV SIDE BROKEN CONTOUR PLATE BOLT TIRE 1

2.3

79

11/22/2015

LEITNER-POMA

2010

314

4.7.4

DRV CONTOUR TIRE BEAM BRACKET CRACK

2.3

80

4/19/2016

LEITNER-POMA

2010

314

4.7.4

RET DEP TIRE 24 COUNTER PLATE BOLT BROKE

2.3

81

3/24/2016

LEITNER-POMA

2010

314

5.1.1

OP PEDESTAL RODENT DAMAGE

1.9

82

11/7/2015

LEITNER-POMA

2010

314

5.3

START RELAY FAILED - LIFT WOULD NOT START

2.6

83

11/27/2015

LEITNER-POMA

2010

314

5.3

LIFT WOULD NOT START - UNDER INVESTIGATION

2.6

84

10/22/2015

LEITNER-POMA

2010

314

5.3

PROOF OF TORQUE AND SERVICE BRAKE FAULT RELAYS FAILED

2.6

85

3/2/2016

LEITNER-POMA

2010

314

5.3.2

DRIVE PANEL VIEW FAILED

2.6

86

3/22/2016

LEITNER-POMA

2010

314

5.5

OIL FLOW SWITCH FAILED

2.9

87

9/3/2015

LEITNER-POMA

2010

314

6.1

OUTSIDE ARMREST VADALIZED BY GUEST

1.8

3

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

88

3/9/2016

LEITNER-POMA

2006

328

6.1

BROKEN DOOR CABLE CABIN 110

2.3

89

3/19/2016

LEITNER-POMA

2006

328

6.1

BROKEN DOOR CABLE CABIN 81,14

2.7

90

3/7/2016

LEITNER-POMA

2006

328

6.1

BROKEN DOOR CABLE CABIN 58,17

2.7

91

12/24/2015

LEITNER-POMA

2015

314

6.7

BROKEN GRIP SPRING

2.5

92

10/17/2015

LEITNER-POMA

2010

314

7.1.2

CRACK IN XARM TWR 2 HS,LS,TWR8 HS, TWR 4 HS

2.3

93

12/17/2015

LIFT ENGR

1992

413

4.3.1

SERVICE BRAKE PUMP AND MOTOR FAILED

2.5

94

2/1/2016

LIFT ENGR

1992

413

4.3.2

BW BRAKPADS CRACKED AND REPLACED

2.4

95

2/12/2016

LIFT ENGR

1978

412

4.5.4

BRAKE PUMP FAILED ON E-BRAKE

2.4

96

4/23/2016

LIFT ENGR

1978

412

4.7.3

WELD FAILED ON BULLWHEEL DROP DOG

2.3

97

9/10/2015

LIFT ENGR

1979

413

4.7.3

YAN BULLWHEEL BRAKE SPINDLE TO SHOE WELD CRACKED

3.1

98

11/25/2015

LIFT ENGR

1978

412

5.1.1

DRIVE BREAKER FAILING - REPLACED

2.3

99

3/1/2016

LIFT ENGR

1978

412

5.3

BASE 1O RELAY FAILED

2.6

100

11/27/2015

LIFT ENGR

1992

413

5.3

SPEED AND DIRECTION SENSOR FAILED

2.6

101

3/21/2016

LIFT ENGR

1978

412

6.1

CHAIR 4 CONFORT BAR DAMAGE

2.3

102

2/14/2016

LIFT ENGR

1978

412

6.1

GAS SHOCKS ON COMFOT BAR FAILED

2.4

103

12/13/2015

LIFT ENGR

1995

412

6.7

BROKEN DISC SPRING WASHER

2.3

104

4/12/2016

MAGIC CARPET

2012

770

4.7.2

RETURN DRUM HUB WELD FAILED

2.3

105

3/29/2016

MAGIC CARPET

2012

770

4.7.3

RET DRUM WELDS FAILED AROUND HUB BOTH SIDES

2.3

106

3/10/2016

POMA

1986

314

4.1

BURST GEARBOX COOLING HOSE

2.2

107

12/26/2015

POMA

1998

314

4.1

GBOX INPUT OIL SEAL AND BEARING REPLACED

2.5

108

7/16/2015

POMA

1990

314

4.2

BAD PTO HOUSING BEARING

2.3

109

4/12/2016

POMA

2007

414

4.3.3

ROLLBACK CAM WHEEL DAMAGE

2.5

110

12/28/2015

POMA

1993

314

4.4

BATTERY POST MELTED DURING AUX START

2.7

111

7/19/2015

POMA

1993

314

4.6

2 DEPART BARREL MTG BOLTS FAILED NDT RET TERM

2.3

112

7/19/2015

POMA

1993

314

4.6

2 DEPART BARREL MTG BOLTS FAILED NDT DRV TERM

2.3

113

7/12/2015

POMA

1999

314

4.6

OVERRUNNING CLUTCH IN CONTOUR FAILED LS DRV TERM

2.3

114

8/17/2015

POMA

1993

314

4.6

PRINCIPLE RAILS CRACKS AT TIRES 13,14 ARRIVE,6,9,13,18 DEPART DRV TERM

2.3

115

8/17/2015

POMA

1993

314

4.6

CRACKS IN TIRE BEAMS AT CENTER COUNTOUR RET. TERM

2.3

116

12/31/2015

POMA

1995

314

4.6

BROKEN TACH BELT

2.7

4

5.5

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

117

12/29/2015

POMA

1994

314

4.6

RET TERM SHV 550 BRACKET HAD 3 BOLTS BROKEN

2.4

118

4/28/2016

POMA

1995

314

4.6

FAILED BEARINGS ON TIRE AT TIRES 11 & 28 DEPART OF RET TERM

2.7

119

9/22/2015

POMA

1987

314

4.6

CRACKED SUPPORT RAIL ARRIVAL AT DRV TERM

2.3

120

8/17/2015

POMA

1993

314

4.6

PRINCIPALRAIL CRACKS DEPART TIRES 7,11-13,17 RET TERM

2.3

121

1/9/2016

POMA

2003

412

4.6

BROKEN CABLE TACH BELT

2.7

122

6/1/2016

POMA

1992

314

4.7.2

INDICATIONS ON OUTSIDE BOOMERANG ON MULTIPLE CHAIRS

2.3

123

2/26/2016

POMA

1999

314

4.7.3

CRACK IN TURN-A-ROUNDBEAM RET TERM

2.3

124

1/21/2016

POMA

1998

314

4.7.3

INDICATION ON MAINT RAIL GATE BOLT PLATE

2.3

125

2/10/2016

POMA

2012

331

4.7.3

CRACKED WELDS IN EXIT COUPLING AREA RET TERM

2.3

126

1/6/2016

POMA

1998

314

4.7.4

BROKEN TIRE AXLE MOUNT BOLT DRV TERM D2

2.3

127

11/30/2015

POMA

1998

314

4.7.4

BROKEN TIRE AXLE MOUNT BOLT RET TERM

2.3

128

11/30/2015

POMA

1998

314

4.7.4

BROKEN TIRE AXLE MOUNT BOLT DRV TERM D26

2.3

129

4/10/2016

POMA

1999

314

4.7.4

BROKEN X-Y BOLT HS TWR 13

2.3

130

1/29/2016

POMA

1998

314

4.7.4

BROKEN TIRE AXL MOUNT BOLT RET TERM DT23

2.3

131

4/1/2016

POMA

1993

314

4.7.4

BROKEN X-Y BOLT HS TWR 6

2.3

132

2/19/2016

POMA

1994

314

4.7.4

PRINCIPAL RAIL ADJ BOLTS BROKEN RET TERM ARR SIDE

2.3

133

1/21/2016

POMA

1998

314

4.7.4

BROKEN TIRE AXLE MOUNT BOLT RET TERM D12

2.3

134

1/11/2016

POMA

2007

316

4.7.4

RET TERM DEPART #1 TIRE HOUSING BOLT FAILED

2.3

135

2/24/2016

POMA

1998

316

4.7.4

DRV TERM D27 BROKEN TIRE AXLE BOLT

2.3

136

2/3/2016

POMA

1998

316

4.7.4

BROKEN TIRE AXLE MT BOLT FAILED RET TER

2.3

137

12/25/2015

POMA

1998

316

4.7.4

BROKEN AXLE MOUNT BOLT DR TER AST2

2.3

138

2/10/2016

POMA

1998

316

4.7.4

BROKEN LATERAL RAIL EYE BOLT DT ARR SIDE

2.3

139

1/26/2016

POMA

2007

414

4.7.4

RET LS GS B-BAR BRACKET CLAMP FAILED

2.3

140

12/11/2015

POMA

1985

543

5.2

PULLYSIDE BEARING FAILED ON MAIN ELEC. MOTOR

2.4

141

11/30/2015

POMA

1998

314

5.3

SPACING CLUTCH RELAY FAILED

2.6

142

12/30/2015

POMA

2001

413

5.3

LIFT WOULD NOT RETURN TO FAST WHEN GIVEN THE COMMAND - FAILED CONTACT

2.6

143

4/7/2016

POMA

2007

316

5.3.2

OUTPUT MODULE FOR DUAL CLUTCH SYSTEM STUCK HIGH

2.6

144

3/3/2016

POMA

2003

412

5.4.1

145

3/9/2016

POMA

2001

413

5.5

5

2.3 MTR BLOWER CONTACTOR/DC CONVERTER FAILED

2.6

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

146

3/23/2016

POMA

2001

413

5.5

OIL FLOW SWITCH FAILED

2.9

147

3/8/2016

POMA

2007

414

5.5

COM LINE GUY GRIP FAILED AT DRV TERM

2.3

148

5/3/2016

POMA

2007

414

5.5

GUY GRIP ON COMM-LINE FAILED

2.3

149

3/3/2016

POMA

1992

314

6.1

OUTSIDE BOOMERANG FAILED AT COMFORT BAR MOUNT

2.3

150

2/22/2016

POMA

1989

314

6.1

BROKEN OUTER BOOMERANG CHAIR 39

2.3

151

2/12/2016

POMA

1987

314

6.1

BROKEN COMFORT BAR CHAIR 16

2.7

152

2/10/2016

POMA

1989

314

6.1

BROKEN COMFORT BAR CHAIR 35

2.3

153

1/4/2016

POMA

2000

316

6.1

CHAIR 69 PIVOT BAR WAS CRACKED

2.3

154

8/5/2015

POMA

1987

314

6.2

4 CRACKED TREADPLATES

2.3

155

1/8/2016

POMA

1972

543

6.2

ROLLPIN BROKE & ALLOWED SPRING TO EXTEND AND BREAK

2.3

156

11/4/2015

POMA

1990

314

6.5

FREEZE CRACK ON CWT SIDE OF OLD STYLE STEM, CHAIR 130

3.0

157

2/12/2016

POMA

1986

314

6.7

BROKEN OUTER SPRING GRIP 1283

2.3

158

9/19/2015

POMA

1990

314

6.7

BROKEN INNER SPRING CHAIR 137, GRIP 903631

2.3

159

8/13/2015

POMA

1994

314

6.7

REPAIRED TREADMILL GRIP 941847

2.3

160

4/25/2016

POMA

1997

314

6.7

TREE FELL ON LINE AND SLIDE DOWN CABLE DAMAGING TRACTION PLATE OF GRIP

1.3

161

12/27/2015

POMA

1989

314

6.7

BROKEN OUTER SPRING CHAIR 103

2.3

162

3/24/2016

POMA

1993

314

6.7

REPLACED FIXED JAW GRIP 931549 CARRIER 76

2.4

163

1/25/2016

POMA

1989

314

6.7

BROKEN INNER GRIP SPRING CHAIR 52

2.3

164

3/16/2016

POMA

1994

314

6.7

BROKEN OUTER SPRING CHAIR 52

2.3

165

3/14/2016

POMA

1996

314

6.7

BROKEN INNER SPRING CHAIR 99 GRIP 96611

2.3

166

3/9/2016

POMA

1985

314

6.7

BROKEN OUTER SPRING CHAIR 134 GRIP 911808

2.3

167

3/19/2016

POMA

1993

314

6.7

BROKEN GRIP SPRINGS ON CARRIER 26

2.3

168

11/21/2015

POMA

1996

314

6.7

BROKEN INNER SPRING GRIP 96611

2.3

169

1/13/2016

POMA

1990

314

6.7

CHAIR 10 LEADING PRINCIPLA ROLLER BEARING FAILED

2.4

170

12/11/2015

POMA

1989

314

6.7

BROKEN INNER GRIP SPRING

2.3

171

11/15/2015

POMA

1993

314

6.7

REPLACED 17 CRACKED TREADPLATES

2.3

172

2/29/2016

POMA

1994

314

6.7

BROKEN OUTER SPRING GRIP 942211 CHAIR 15

2.4

173

2/19/2016

POMA

1994

314

6.7

FAILED FIXED JAW GRIP 941816 CHAIR 63

2.4

174

11/25/2015

POMA

1985

314

6.7

BROKEN INNER SPRING GRIP 911805

2.3

6

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

175

11/25/2015

POMA

1986

314

6.7

NDT INDICATIONS ON FIXED JAWS 85-865258, 115-865296

3.1

176

2/11/2016

POMA

1993

314

6.7

BROKEN OUTER SPRING ON CHAIR 10

2.3

177

12/28/2015

POMA

1985

314

6.7

BROKEN OUTER SPRING CHAIR 112 GRIP 91-1887

2.3

178

7/4/2015

POMA

1993

314

6.7

BROKEN OUTER SPRING GRIP 93626 CHAIR 52

2.3

179

4/5/2016

POMA

1993

314

6.7

REPLACED FIXED JAW GRIP 93 0947 ON CHAIR 081

2.4

180

2/22/2016

POMA

1989

314

6.7

BROKEN HANGER PLATE ROLL PIN CHAIR 40

2.3

181

2/16/2016

POMA

1990

314

6.7

BROKEN INNER SPRING CHAIR 106

2.4

182

2/26/2016

POMA

1986

314

6.7

BROKEN OUTER GRIP SPRING CHAIR 154

2.3

183

3/7/2016

POMA

1993

314

6.7

REPLACED FIXED JAW GRIP 930916 CARRIER 72

2.4

184

8/13/2015

POMA

1994

314

6.7

BROKEN INNER SPRING GRIPS 941807,941810

2.3

185

7/12/2015

POMA

1993

314

6.7

BROKEN OUTER SPRING GRIP 93635 CHAIR 20

2.3

186

4/12/2016

POMA

1993

314

6.7

REPLACED FIXED JAW GRIP 93 1571 ON CHAIR .83

2.4

187

1/23/2016

POMA

1994

314

6.7

BROKEN OUTER SPRING GRIP 942235 CHAIR 48

2.4

188

1/26/2016

POMA

1994

314

6.7

BROKEN OUTER SPRING GRIP 941893 CHAIR 26

2.4

189

1/27/2016

POMA

1989

314

6.7

BROKEN INNER GRIP SPRING CHAIR 84

2.3

190

2/19/2016

POMA

1994

314

6.7

REPLACED FIXED JAW GRIP 941814 CARRIER 01

2.4

191

1/27/2016

POMA

1989

314

6.7

BROKEN OUTER GRIP SPRING

2.3

192

1/20/2016

POMA

1989

314

6.7

BROKEN INNER GRIP SPRING CHAIR 117

2.3

193

1/18/2016

POMA

1990

314

6.7

BROKEN INNER SPRING CHAIR 62 GRIP 903634

2.4

194

1/28/2016

POMA

1993

314

6.7

BROKEN INNER SPRING CARRIER 36

2.3

195

1/25/2016

POMA

1989

314

6.7

BROKEN HANGER PLATE BOLT CHAIR 52

2.3

196

2/22/2016

POMA

1989

314

6.7

BROKEN HANGER PLATE BOLT CHAIR 44

2.3

197

12/28/2015

POMA

1993

314

6.7

BROKEN OUTER SPRING CHAIR 43 GRIP 13

2.3

198

2/23/2016

POMA

1986

314

6.7

BROKEN OUTER GRIP SPRING CHAIR 83

2.3

199

8/14/2015

POMA

1990

314

6.7

BROKEN INNER SPRING CHAIR 27 GRIP 903514

2.3

200

2/24/2016

POMA

1989

314

6.7

BROKEN INNER GRIP SPRING CHAIR 79

2.3

201

1/10/2016

POMA

1987

314

6.7

BROKEN OUTER SPRING CHAIR 41

2.3

202

4/1/2016

POMA

1993

314

6.7

REPLACED FIXED JAW GRIP 93 1535 ON CHAIR 080

2.4

203

2/24/2016

POMA

1989

314

6.7

MISSING HANGERS ON CHAIRS 86,119,123

2.3

7

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

204

4/27/2016

POMA

1993

314

6.7

REPLACED FIXED JAW GRIP 93 1566 ON CHAIR 091

2.4

205

7/15/2015

POMA

1993

314

6.7

BROKEN INNER SPRING CHAIR 52

2.3

206

7/15/2015

POMA

1993

314

6.7

REPLACED 10 CRACKED TREADPLATES

2.3

207

7/6/2015

POMA

1993

314

6.7

REPLACED 7 CRACKED TREADPLATES

2.3

208

1/21/2016

POMA

1993

314

6.7

BROKEN OUTER SPRING CARRIER 14, 49

2.3

209

11/29/2015

POMA

1986

326

6.7

BROKEN MIDDLE SPRINGS CABIN 009,GRIP 1054, CABIN 109,GRIP 0941

2.4

210

11/29/2015

POMA

1986

326

6.7

BROKEN INNER SPRING CABIN 8, GRIP 1059

2.4

211

7/7/2015

POMA

1986

326

6.7

NEW INNER SPRING ON GRIPS 1002 CABIN 44, 1029 CABIN 053

2.3

212

7/7/2015

POMA

1986

326

6.7

REINFOECEMENT PLATE INDICATION GRIPS 0972, 1029, 1035

2.3

213

2/22/2016

POMA

1986

326

6.7

BROKEN OUTER SPRING CABIN 137 GRIP 0950

2.4

214

4/27/2016

POMA

1986

326

6.7

GRIP 1043 ON CABIN 074 GRIP FRAME INDICATION

2.3

215

3/19/2016

POMA

1986

326

6.7

GRIP 1005 ON CABIN 043 REINFORCEMENT PLATE INDICATION

2.3

216

3/2/2016

POMA

1986

326

6.7

GRIP 0924 ON CABIN 040 GRIP FRAME INDICATION

2.3

217

3/19/2016

POMA

1986

326

6.7

GRIP 0981 ON CABIN 039 GRIP FRAME INDICATION

2.3

218

12/30/2015

POMA

1986

326

6.7

PLATE INDICATION GRIP 028, 2958, 1034, 0973, 0916 1058, 1063, 1053

2.3

219

12/30/2015

POMA

1986

326

6.7

PLATE INDICATION GRIP 0920,0926,0944,0948,0941,1060,0936,0950,0972

2.3

220

12/30/2015

POMA

1986

326

6.7

PLATE INDICATION GRIP 0994

2.3

221

4/27/2016

POMA

1986

326

6.7

GRIP 1061 ON CABIN 132 GRIP FRAME AND REINFORCEMENT PLATE INDICATION

2.3

222

4/13/2016

POMA

1986

326

6.7

GRIP 1033 ON CABIN 117 GRIP FRAME INDICATION

2.3

223

4/1/2016

POMA

1986

326

6.7

GRIP 0904 ON CABIN 104 GRIP FRAME INDICATION

2.3

224

3/3/2016

POMA

1986

326

6.7

GRIP 1002 ON CABIN 044 REINFORCEMENT PLATE INDICATION

2.3

225

4/14/2016

POMA

1986

326

6.7

GRIP 0965 ON CABIN 079 GRIP FRAME INDICATION

2.3

226

3/31/2016

POMA

1986

326

6.7

GRIP 0914 ON CABIN 014 GRIP FRAME INDICATION

2.3

227

4/27/2016

POMA

1986

326

6.7

GRIP 1041 ON CABIN 063 GRIP FRAME INDICATION

2.3

228

4/28/2016

POMA

1986

326

6.7

GRIP 1047 ON CABIN 060 GRIP FRAME INDICATION

2.3

229

4/28/2016

POMA

1986

326

6.7

GRIP 1047 ON CABIN 060 BROKEN LEAD INNER SPRING

2.4

230

4/20/2016

POMA

1986

326

6.7

GRIP 0986 ON CABIN 053 GRIP FRAME AND REINFORCEMENT PLATE INDICATION

2.3

231

4/15/2016

POMA

1986

326

6.7

GRIP 0992 ON CABIN 049 GRIP FRAME INDICATION

2.3

232

4/15/2016

POMA

1986

326

6.7

GRIP 1016 ON CABIN 031 BROKEN OUTER LEAD SPRING

2.4

8

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

233

4/20/2016

POMA

1986

326

6.7

GRIP 0987 ON CABIN 020 GRIP FRAME INDICATION

2.3

234

1/1/2016

POMA

1986

326

6.7

GRIP 0946 ON CABIN 003 REINFORCEMENT INDICATION

2.3

235

1/1/2016

POMA

1986

326

6.7

GRIP FRAME BODY 0908 CABIN 129 SHOWED INDICATION

2.3

236

1/1/2016

POMA

1986

326

6.7

GRIP FRAME BODY 1049 CABIN 141 SHOWED INDICATION

2.3

237

4/16/2016

POMA

1986

326

6.7

GRIP 0977 ON CABIN 083 GRIP FRAME INDICATION

2.3

238

3/19/2016

POMA

1986

326

6.7

GRIP 0945 ON CABIN 128 REINFORCEMENT PLATE INDICATION

2.3

239

3/19/2016

POMA

1986

326

6.7

GRIP 0933 ON CABIN 090 GRIP FRAME INDICATION

2.3

240

3/31/2016

POMA

1986

326

6.7

GRIP 0951 ON CABIN 066 GRIP FRAME INDICATION

2.3

241

3/19/2016

POMA

1986

326

6.7

GRIP 1042 ON CABIN 139 REINFORCEMENT PLATE INDICATION

2.3

242

3/19/2016

POMA

1986

326

6.7

GRIP 0926 ON CABIN 100 GRIP FRAME INDICATION

2.3

243

3/8/2016

POMA

1986

326

6.7

GRIP 0937 ON CABIN 093 GRIP FRAME INDICATION

2.3

244

3/19/2016

POMA

1986

326

6.7

GRIP 0934 ON CABIN 111 BROKEN TRAILING INNER SPRING

2.4

245

3/19/2016

POMA

1986

326

6.7

GRIP 0988 ON CABIN 103 GRIP FRAME INDICATION

2.3

246

3/19/2016

POMA

1986

326

6.7

GRIP 1027 ON CABIN 123 REINFORCEMENT PLATE INDICATION

2.3

247

3/31/2016

POMA

1986

326

6.7

GRIP 1000 ON CABIN 131 GRIP FRAME INDICATION

2.3

248

3/19/2016

POMA

1986

326

6.7

GRIP 0950 ON CABIN 137 GRIP FRAME INDICATION

2.3

249

3/19/2016

POMA

1986

326

6.7

GRIP 0950 ON CABIN 137 BROKEN OUTER SPRING

2.4

250

3/19/2016

POMA

1986

326

6.7

GRIP 1050 ON CABIN 140 BROKEN LEAD INNER SPRING

2.4

251

3/5/2016

POMA

1986

326

6.7

GRIP 0972 ON CABIN 046 REINFORCEMENT PLATE INDICATION

2.3

252

1/8/2016

POMA

1972

543

6.8

GRIP BOLTS LOOSENED AND ALLOWED MORE SLIPPAGE THAN ALLOWED

2.7

253

7/18/2015

POMA

2003

412

7.1.1

CRACKS IN CATWALKS TWRS 7 LS, 8 HS, 10 LS, 13 HS, 14 HS

2.3

254

7/7/2015

POMA

2006

414

7.1.1

CRACKED CATWALK TWR 2 HS

2.3

255

1/30/2016

POMA

1999

314

7.1.2

INDICATION FOUND ON TAB FOR CATWALK ON CROSSARM TWR 5

2.3

256

3/11/2016

POMA

2003

412

7.1.3

CRACKED HORZ TUBES ON LIFTING FRAMES TWR 3 HS, 5 HS

2.7

257

7/14/2015

POMA

1994

314

7.5

BROKEN ARTICULATING ARM BOLT, HS TWR 4

2.3

258

11/28/2015

POMA

1986

326

7.5

VERTICAL X-Y BOLT BROKEN TWR 3 LS

2.2

259

5/25/2016

POMA

2007

316

7.6

CRACKED FLANGES ON 550 DEFLEC HORZ TERM SHV

2.9

260

1/25/2016

POMA

2012

331

7.6

BROKEN SIDE FLANGE PTO SHV #1 DT ARRIVAL SIDE

2.3

261

3/3/2016

POMA

1997

541

7.6

FAILED BEARING TWR 11 HS

2.7

9

COLORADO PASSENGER TRAMWAY SAFETY BOARD

COMPONENT REPORT 7/1/2015 Through 6/30/2016 FOR ALL AREAS DATE OF INCIDENT

MANUFACTURER

LIFT YEAR

LIFT TYPE

FAIL CODES

FAILURE DESCRIPTION

CAUSE CODE

262

3/3/2016

POMA

1997

541

7.6

FAILED BRG ON SHV TWR 11 HS

2.7

263

12/15/2015

POMA

1994

314

706

TWR 24 HS SNAP RING ILL-SEATED AND REPLACED

202

264

10/14/2015

POMA / RIBLET

1957

412

7.6

BROKEN FLANGE SHV 1 TWR 19 LS

2.3

265

12/20/2015

RIBLET

1969

412

3.8.1

MISLOADEDCHAIR LODGED IN GUIDAGE CAUSING GRIP 115 TO COME OUT OF CABLE

2.0

266

9/22/2015

RIBLET

1976

412

4.7.2

NDT INDICATIONS ON ANCHOR BOLTS

2.3

267

9/22/2015

RIBLET

1980

412

4.7.2

NDT INDICATIONS ON ANCHOR BOLTS

2.3

268

3/1/2016

RIBLET

1979

412

4.7.3

CABLE TACH WELDMENT FAILED AT SUPPORT ARM

2.3

269

3/13/2016

RIBLET

1967

413

5.4.1

INSULATION WORN THROUGH ON RET BW

2.3

270

3/11/2016

RIBLET

1966

412

9.1

SWING DAMPENER FAILED CHAIR 6 & 161

2.3

271

3/11/2016

RIBLET

1966

412

9.1

2.3

5.4.1

272

12/20/2015

RIBLET / HERON

1973

412

5.4.1

BROKEN SCREW ON DEROPE CONNECTION

2.3

273

3/25/2016

RIBLET SKI LIFT INT

1975

412

5.3.1

WILD CHAIR SWING ON UNLOAD CAUGHT CONTROL PEDESTAL

2.0

10

Tramway August 25, 2016 Board News.pdf

Mark Kramer, Copper Mountain Resort. Doug Allen, Steamboat Ski & Resort. Erik Shellman, Breckenridge Ski Resort. Rob Ware, Arapahoe Basin.

258KB Sizes 3 Downloads 220 Views

Recommend Documents

Tramway August 25, 2016 Board News.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Tramway August 25, 2016 Board News.pdf. Tramway August 25, 2016 Board News.pdf. Open. Extract. Open with. Si

Tramway 2016-02-25 Board News.pdf
Elizabeth Howe, Member (via conference call). Mike Lane, Member. Board Members Absent: Jon Mauch, Member. Staff Members Present: John Roberts, First ...

August 25
their use in foreign language courses and in a course on language learning from an academic perspective. They have also been ... Maximizing Study Abroad project, she has continually worked towards helping others both understand .... managing re-entry

NSE/CML/33062 Date : August 25, 2016 Circular Re
Aug 25, 2016 - Managers Private Limited, SBI Funds Management Private Limited. In pursuance of Regulation 3.1.2 of the National Stock Exchange (Capital ...

NSE/CML/33051 Date : August 25, 2016 Circular Re
Aug 25, 2016 - Divya Poojari. Manager. Telephone No. Fax No. Email id. 022-26598235/36 ... Direct Plan - ... Email: [email protected]. Address of ...

NSE/CML/33062 Date : August 25, 2016 Circular Re
Aug 25, 2016 - RP-GO. DWSFNE32RG INF223J013L1 MF. Redemption. 29-Aug-. 2016. 26- ... Manager. Telephone No. Fax No. Email id. 022-26598235/36.

NSE/CML/33051 Date : August 25, 2016 Circular Re
Aug 25, 2016 - Sub : Listing of units issued by UTI Asset Management Company Limited (UTI-Capital ... Regulations Part A, it is hereby notified that the list of securities further ... Manager. Telephone No. Fax No. Email id. 022-26598235/36.

August 25 Express.pdf
... PTA First Meeting 5:30 pm HBV. library. 9/13 Open House 5-6:30 pm. Become Part of the Team! Parent Teachers Association. Parents, please consider becoming a PTA. member and or classroom representative. This is a way to be involved in schoolwide.

Board Briefs Regular Meeting August 15, 2016.pdf
Aug 15, 2016 - Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect ...

Tramway 2017-09-19 Board News.pdf
g:\business and technical\tramway\board meetings 091917 board meeting\091917 minutes. DRAFT - NOTES. COLORADO PASSENGER TRAMWAY SAFETY BOARD. 1560 Broadway, Conference Room 1250-C September 19, 2017. Denver, CO 80202. This meeting of the Board was pu

August 25, 2015 Minutes.pdf
... Pugh and seconded by William Campbell to. adjourn the meeting. Motion carried 6-0. Katie Daniel, Secretary. Page 2 of 2. August 25, 2015 Minutes.pdf.

NSE/CMTR/33056 Date : August 25
Aug 25, 2016 - user ids for login into the 'Tender Offer Facility'. For members who do not ... Fax No. Email id. 1800 266 0053. 022-26598447 [email protected] ...

25 August Dainik Jagran.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 25 August Dainik Jagran.pdf. 25 August Dainik Jagran.pdf. Open. Extract. Open with. Sign In. Main menu.

August 25 Jolly Mountain.pdf
the southwestern edge and crossed to the west. ... Sheriff's department issued Evacuation Level 2 notifications yesterday in the Morgan Creek, Bell Creek and.

NSE/CMTR/33056 Date : August 25
Aug 25, 2016 - National Aluminium Company Limited has approached the Exchange for usage of web based bidding platform for ... Mock URL for Members.

august 2016 -
Line Dancing 1 - 2:30 p.m.. Get Fit Kids (Ages 6-12). 3:30 - 4:30 p.m.. Pilates. 6 - 7 p.m.. Zumba for Adults. 9 -10 a.m.. First Aid Training. 10:30 a.m. - 12:30 p.m..

September 25, 2016 25 de septiembre 2016 White Plains
Sep 25, 2016 - Center C200. Questions? If you have a need or just a question, please call the church office, 919-467-9394, or [email protected]. You can also ...

September 25, 2016 25 de septiembre 2016 White Plains
Sep 25, 2016 - Page 1 ... you check in on Facebook to White Plains a donation ... MESSAGE. From the Past to the Future: “Believer? Fan? Follower? Disciple?”.

August 14 2015 Board Mtg.pdf
Larry Wormington, Tom Parrish, Henry Ramirez, Linda Kowalski and Charles Campbell. Absent: Melissa. Hardgrave. Guest: Bill Harlien. Ouorum established. {} ) BijSINESS. Minutes from 7/17/15 read by Tom Parrish. ... Shelly Mark will continue to update

August 2016 Newsletter_Publish.pdf
Antelope Valley and three student advisors (Jonathan Campos, Jillian. Vickers, Carmen Baltazar) who serve the rest of Southern California. They. are all college ...