Baifa  History   1992

1998

Established in Yunan, Southwestern China

2001

2002

Current office/ workshop started operation ; Achieved ISO14000 certificate

Baifa moves its manufact ure plant into Wuxi, Jiangsu China Start corporation with VOLVO PENTA in Industrial generators

2005

Achieved ISO9001 Certificate

2006

Boarder our Business into exportati on, Supplied our gensets for UN Project

2009

Became MTU Global partner

2010

Sales revenue reached 75 million USD. Overall export value 30 million USD

2011

Awarded for Highdistinctio n Brand in Wuxi by Wuxi Governm ent

2012

2015

New facility put into service with production 30 million capacity of capital 6000 genregistered sets for Baifa Power(Wu xi), meanwhile 60 million USD investmen t for our new facility

Key  numbers   Number of Employees: 180 Company Assets: 35 Million USD Production Capacity: 5000 gen-set/year Product range: 25-3250KVA diesel/gas gen-sets with varies of types Sales Revenue: 50 Million USD 30 Million for export Market: Export over 75 countries

Geographic  Advantage  

Wuxi   Wuxi  

Wuxi  

To Wuxi Int. airport: 5mins To Shanghai: 30mins by train Shanghai port: 2hrs

Shanghai  

Wuxi  

Wuxi  

Shanghai  

Wuxi  

Suzhou  

Baifa, located in Wuxi National High-Tech Industrial Development Zone, known as area of the world manufacture center as it gathers Baifa most main suppliers: CAT, VOLVO PENTA, Cummins Stamford, MTU, Mitsubishi and etc.

 

Cer;ficates  

           Trademark Registration

                               High-Tech Enterprise

ISO9001

ISO14000

Jiangsu Distinction Brand

CE Certificate

Wuxi Distinction Brand

Part  of  Awards  and  Cer;ficates    

10  Years  Excellent   Partner  with  VOLVO  

STAMFORD   Best  OEM  AWARD  

Perkins   OEM  CerDficate  

MTU   OEM  CerDficate  

DAEWOO     AppreciaDon  Award  

DEUTZ   OEM  CerDficate  

MTU   MILLION  EURO  AWARD  

SCANIA   OEM  CerDficate  

Corporate  Culture  

Corporate  Responsibility   “Baifa has been corporately and socially responsive as our employees are putting concerns more into the welfare of entire society. We invested more physical and nonphysical resources into trying to solve problems in our communities and society since established in 1992.”

Product  Summary-­‐Product  Series  

ENGINE   BF-C

ALTERNATOR  

series

Cummins

BF-DE series

DEUTZ

BF-DW series

DOOSAN

BF-SM series

MITUSUBISHI

BF-M series

MTU

BF-P

series

Perkins

BF-SC series

SCANIA

BF-V

series

VOLVO

           

 

CONTROL  PANEL  

Product  Summary-­‐Power  Range  

Minimum  

4000   3000  

2500   2250   2250  

2000   1000   0  

Maximum  

3250  

700   770   825  

625  

9   85   250   275   KVA   KVA   60   KVA   KVA   KVA  

P  Series   V  Series  

SC  Series  

635   25   KVA KVA

DW   DE  Series   C  Series   Series  

SM   Series  

800   KVA

M  Series  

Maximum   Power  Range  

Product  Summary-Types  

  OPEN  TYPE  

  LIGHT  TOWER  

    SOUNDPROOF  TYPE  

 

HIGH  VOLTAGE  

  CONTAINER  TYPE  

MOBILE  TYPE  

GAS  GEN-­‐SET  

 

Warehouse-­‐  Parts  &  Material    

Receive   parts  

Immediate   Quality   InspecDon  

At Baifa, we maximize warehouse floor space for more parts storage in order to meet customers’ delivery date.

Approved   Parts/ Material  

Unqualified   Parts/ Material  

Well  Packed   and  stored  in   designed  area  

Return  to   Supplier   directly  

WaiDng  for   installaDon  

Immediate   Repair  or   Replace  

Warehouse-­‐Assembly  Line  

Vast space for assembly line ensures quality, safety and efficiency. All products will be fully tested (under ISO8528) before delivery.

Warehouse-­‐  State-­‐of-­‐art  Machinery  

CNC  Punching  machine     CNC  Shearing  machine     Laser  CuIng  machine     Bending  machine     Generator  Tes;ng  Machine    

All Machinery are well maintained according to the service requirement and all data are kept in log book

Product  quality  management  circle   TesDng/inspecDng  

R&D/ Engineers    

Customers’   feedback  

Equipment   coordinate    

Assembly  line  

Produc;vity  management-­‐Enterprise  Resource  planning   storage  for   main  parts  

ERP   manufacture  capacity  

Market,  Clients  and  Projects  

hbp://www.baifapower.com/SoluDons/Typical-­‐Projects.html    

Global  Sales  Distribu;on  

Interna;onal  Organiza;on-­‐  UN  Sudan  safe-­‐keeping  project    

2006, Sudan  

Gen-set model: BF-C550 Prime power: 500kVA Quantity: 10 units

In 2006, after 1 year of technical inspection, Baifa is qualify to become gen-set vendor as we achieved UN Quality Authentication

Venezuela  Na;onal  Electric  Bureau:Distributed  electric  genera;on  

2012, Gensets to Venezuela Gen-set model: Variety of Baifa M-series Power: 1000kVA to 2500kVA Quantity: 23 units

In 2012, Baifa provided in total of 23 containerized gen-sets, power ranged from 730kw to 1500kw for Venezuela National Electric Bureau’s distributed electric generation project.

Indonesia:  Power  sta;on  black-­‐start  

Our technician proceeding on-site commissioning.

2013, Indonesia Black Start Project

Gen-set model: BF-M2500HV Standby power: 2500kVA, 6.3KV Quantity: 4 units

In 2012, Indonesia government invested in a coal-fired power station on Balikbapan Island, main power outage of this power station is from two 15MW gas turbine. While lots of generator manufacture all over the world were in this bidding competition, Baifa relies on our quality and capability successfully became the only vendor for this Black-start project. Black start project required a total capacity of 8MW, Baifa provided with four 2000KW MTU diesel gen-sets with auto-control panel, ATS and auto paralleling system.

Hydropower  sta;on  emergency  power  supply  

2009, EPC Project in China Genset model: BF-C1100 Prime power: 1000kVA Quantity: 14 units

One of the biggest Hydro-station in China, Baifa provide full emergency power supply solution for EPC project.

Botswana:  Power  rental/  Power  Sta;on  Prime  power  supply  

Time: 2006 Cooperate with Alstom Power Rental Country: Tanzania Genset model: BF-C1100, BF-M1100 Prime power: 1000kVA Quantity: 50 units

In 2006, we corporate with Alstom and winning a fifty 1000kva containerized gen-sets for power-station project in Africa. The customer set 45 days tight delivery time, and we successfully accomplish the manufacture and delivered on time. This project further approves Baifa’s production efficiency and convincing quality.

Botswana:  Power  rental/  Power  Sta;on  Prime  power  supply  

Time: 2008 Cooperated with Alstom Power Rental Country: Costa Rica Genset model: BF-M1100-60 Prime power: 1100kVA Quantity: 77 units We corporate with Alstom to supply 77 high power containerized diesel generators with (highvoltage) for Costa Rica government power project. All gen-sets are paralleled with total capacity of 60MW

Botswana:  Power  rental/  Power  Sta;on  Prime  power  supply  

Time: 2009 Cooperated with APR for power rental business Country: Botswana Genset model: BF-M1100; Prime power: 800kVA Quantity: 88 units

In 2009, Baifa corporate with APR global energy company, provide Botswana 88 high-voltage 800KW containerized diesel generators powered by MTU, all paralleled together as a high-voltage output power station.

Samsung:  Factory  High-­‐voltage  back-­‐up  power  supply  

2013, Samsung Factory in China

In 2013, Baifa provided auto transferred, auto paralleled high-voltage 10.5KV diesel gen-sets and auto-control system powered by four 2000KW MTU engine, total capacity reached 8MW.

Genset model: BF-M2500HV Standby power: 2500kVA, 10.5KV Quantity: 4 units

MTU engine has world most advanced fuelling system and injection system, technology allows MTU engines to have advantages on high reliability, fuel economic and low emission compare to other engines.

Toyo:  Office  building/factory  high-­‐voltage  stand-­‐by  power  

2013, Toyo Factory in Korea Gen-set model: BF-M2000,HV-60 Standby power: 2200kVA, 6.9KV Quantity: 4 units

In 2013, we provide 4 sets of 2000KW diesel generators as back-up power for Toyo Factory in Korea. 60Hz , 6.6KV high-voltage, fully auto controlled and paralleled

Telecom/data  center  stand-­‐by  power  

Time: 2012 Country: Tianjin, China Gen-set model: MTU powered gen-sets Power range: 1250kVA to 2000kVA Quantity: 12 units

Since 2008, Baifa started stretching business into providing diesel generators for telecom industry. We supplied telecom facilities with varies of reliable, efficient and environtal Baifa products, including: BF-Volvo series; BFMTU series and etc.

Mongolia:  Mining  industry  prime  power  supply  

Time: 2013 Country: Mongolia Gen-set model: BF-M2500SHV Standby power: 2500kVA, 10.5KV Quantity: 2 units

In 2012, Baifa provided 2 sets of BF-M series 2000KW containerized diesel generators, boosted and auto paralleled for prime power supply on Mongolia mining site. Gen-set and electric transformer all contained in well built sand and all weatherproof 40ft container.

Mongolia:  Mining  industry  prime  power  supply    

2011 Mine site in Mongolia Genset model: BF-C825; Prime power: 750kVA; Quantity: 11 units

Oil  field  standby  power/Prime  power  

2008 Oil Field in China Gen-set model: BF-C688 Standby power: 688kVA Quantity: 1 unit

2009 Niger in Africa Gen-set model: BF-M1700HV Prime power: 1550kVA, 6.6KV Quantity: 2 units  

Gen-set model: BF-M1000 Prime power: 910kVA Quantity: 3 units  

Hotel  Standby  power      

We provide different solutions tailored for different clients: High-voltage diesel generators with remote radiator outside building(Tianjing) Sound-proof diesel generators for motel(Overseas) Qatar hotel Container type diesel generator(Crown Beijing )

More visit: http://www.baifapower.com/Solutions/Typical-Projects.html  

   

Quiet Powerful Environmental

Banking  and  Hospital  

Our product reaches lots of bank clients in China domestic market Almost half of hospitals/medical facility in our capital city Beijing and Tianjin is now using Baifa products

Airport/Railway     China Southern Airline Gen-set model: BF-P1800 Prime power: 1650kVA Quantity: 1 unit

Beijing Railway ministry Standby power with remote radiator

South  Africa  world  cup:  Stadium/Arena  Standby  power  

2009 Lubango Stadium in Angola (African Cup )

Genset model: BF-M1100 Prime power: 1000kVA Quantity: 4 units

Special  requirement/Customize  design   Containerized trailer

Vehicle mounted generator

Special  requirement/Customize  design  

Bridge girder erection machine

Railway maintenance vehicle

Special  requirement/Customize  design  

Emergence power vehicle

Hoisting machine

Special  requirement/Customize  design   Crushing machine

Our  New  Facility  

Baifa Power New facility Total Investment:60,000,000 USD Covered Area:40,000m2

End  of  Presenta;on  

Download Bafapower PPT presentation.pdf

Geographic Advantage Wuxi. Wuxi Wuxi. Wuxi. Suzhou Wuxi. Shanghai. Shanghai Wuxi. Page 4 of 41. Download Bafapower PPT presentation.pdf. Download ...

12MB Sizes 7 Downloads 233 Views

Recommend Documents

PPT
Two-way OS/app communication via process memory. Safe: designed for non-wizard use ... samples call stacks. DTrace isolates samples where threads wait on.

PPT
probe cost. Instrument majority of OS and all user-level ... Two-way OS/app communication via process memory ... Work breakdown. Sample-based profiling.

TMA PPT Jail PPT[8376] - Sharon Schmitz.pdf
Investigating. & Resolving. Justice. Center Issues ... Texas County, MO. Monroe County, TN Loudon County, TN ... Abuse, Mental Health. Page 4 of 23. TMA PPT ...

PPT Format.pdf
of earlier one within 1 slide. Page 4 of 11. PPT Format.pdf. PPT Format.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying PPT Format.pdf.

ppt-EICM.pdf
Page 2 of 16. Outline. Major Cause of Climate Change. Climate Change Impact. Solutions. General Condition of Indonesia. Potential of Solar Energy. Potential ...

TMA PPT Jail PPT[8376] - Sharon Schmitz.pdf
Lawrence, KS Lincoln County, NE. Campbell County, TN. Belleville, IL. Anderson County, TN. Texas County, MO. Monroe County, TN Loudon County, TN.

PS5_13_30.ppt
Interoperate Spatial Data Stored in. SQL and NoSQL Databases. Cláudio de Souza Baptista,. Odilon Francisco de Lima Junior,. Maxwell Guimarães de Oliveira,.

TiDE(PPT).pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. TiDE(PPT).pdf.

PPT embedded SHB.pdf
Page 5 of 6. PPT embedded SHB.pdf. PPT embedded SHB.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying PPT embedded SHB.pdf. Page 1 of 6.

jeje ppt titip.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. jeje ppt titip.pdf.

PPT-MS-SMER.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. PPT-MS-SMER.Missing:

(全編)PPT to ePub_FUSEe Beta PPT to ePub.pdf
【参考】:MyBooks.jp :ブログデータから本を作成できるサービス. 【引用】:http://mybooks.jp/. Page 4 of 79. (全編)PPT to ePub_FUSEe Beta PPT to ePub.pdf. (全編)PPT to ...

Contoh PPT Pen.Ayam Pedaging.pdf
Whoops! There was a problem loading this page. Contoh PPT Pen.Ayam Pedaging.pdf. Contoh PPT Pen.Ayam Pedaging.pdf. Open. Extract. Open with. Sign In.

Triad PPT Jan 2017.pdf
Page 3 of 21. Triad PPT Jan 2017.pdf. Triad PPT Jan 2017.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Triad PPT Jan 2017.pdf. Page 1 of 21.

PPT-Webinar-ServiceTips-June2017.pdf
Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more ...

PPT Zona 2.pdf
... y rejillas, incluidas las acometidas, de. la red de saneamiento en cualquiera de las poblaciones mencionadas. Page 3 of 18. PPT Zona 2.pdf. PPT Zona 2.pdf.

PPT SAINS T1 2016 .pdf
Page 1 of 18. SULIT 55/1. SCIENCE. Ogos 2012. 1 jam. Kertas ini mengandungi 29 halaman bercetak. 55/1 © 2012 Hak Cipta BPSBPSK [Lihat Halaman ...

Cougar Camp PPT-2017.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Cougar Camp ...

GreenStar Introduction Webinar ppt [Compatibility Mode].pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. GreenStar ...

TemplateProjectDisplayBoard (1).ppt (1).pdf
Frame construction is used throughout. the aerospace industry in the creation of. welded steel-tube fuselages, piston- engine motor mounts, ribs, and landing.

PPT on technicality of Aadhaar.pdf
Page 1 of 53. Page 1 of 53. Page 2 of 53. Page 2 of 53. Page 3 of 53. Page 3 of 53. Page 4 of 53. Page 4 of 53. Main menu. Displaying PPT on technicality of ...

PPT-Webinar-TimeManagement-March2016.pdf
8th / early 9th century – modern clocks make meaningful. appearances in the Middle East (Iraq). • 11th century – clock mechanisms are well in use, mostly ...

PPT-II Machine Maintenance.pdf
Download. Connect more apps... Try one of the apps below to open or edit this item. PPT-II Machine Maintenance.pdf. PPT-II Machine Maintenance.pdf. Open.

PPT. REGIMENES Y SISTEMAS POLITICOS.pdf
Page 1 of 7 . NANCY RODRIGUEZ POLO. Abogada & Administradora de Empresas. Especializada en. Gobierno y Políticas Públicas. Universidad de los Andes. Page 1 ...