RFB: 1531

4.03

General Conditions and Contract

LiquidatedDamages

a. Contractor

and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penaby), Contractor shall pay Owner $590.00 for each day that expires after the time specified in Paragraph 4.02 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or ARTICLE 5

-

CONTRACT PRICE

5.01 a. b. c.

Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined in the bid documents:

N/A For all Work other than Unit Price Work, a lump sum of: $ price. All specific cash allowances are included in the above For all Unit Price Work, an amount equal to the sum of the established unit price for each For all Work, at the prices stated in Confractor's Bid, affached hereto as an exhibit.

ITEM

DESCRIPTION

#

UNIT

QUANTITY

7

Mobilization

LS

9

2

Traffic Control

LS

9

3

Cement Modified Recycled Base (8" Uniform) Method 2

SY

129998

4

Portland Cement for Cement Modified Recycled Base

TON

3576

5

Maintenance Stone

TON

420

6

8

HMA Surface Course Type E (liquid included) 75LBS/SY HMA Surface Course Type C (liquid included) 2" Uniform HMA Surface Course Type C (liquid included) 175 LBS/SY

9

Permanent Construction Signs (Ground Mounted) Scheme

10

Permanent Construction Signs {Ground Mounted) Scheme

1L

Permanent Vegetation

72

7

13 1.4

15 16 17

18

SY

64189

SY

80763

SY

64189

E

SF

L296

C

SF

532

MSY

70.3

Permanent Yellow Markers Bi-Dir-4"x4" 4" White Solid Lines (Pavement Edge Lines) Fast Dry Paint

EA

1.1.46

LF

86298

24" White Solid Lines (Stop) Fast Dry Paint 4" Yellow Solid Line (No Passing Zone) Fast Dry Paint

LF

534

LF

86298

4" White Solid Lines (Pavement Edge Lines)Thermoplastic90 mil 4" Yellow Solid Line (No Passing Zone)Thermoplastic-9O mil 24" White Solid Lines (Stop)Thermoplastic-125 mil

LF

86298

LF

534

19

Street Signs

EA

20

Full Depth HMA Patching 6" uniform

SY

600

21.

Railroad Crossing Symbols-Fast Dry Paint

EA

4

22

Railroad Crossing Symbols-Thermoplastic 125 mil

EA

4

LANCASTER 2015 SCDOT SECONDARY ROADS ONE TIME MONEY

EXTENDED PRICE

86298

LF

GRAND

UNIT PRICE

51

TOTAL

Page 17

Bid Form

RFB:1531

ITEM

DESCRIPTION

#

UNIT

QUANTITY

t

Mobilization

LS

9

2

Traffic Control

LS

9

3

Cement Modified Recycled Base (8" Uniform) Method 2

SY

129998

4

Portland Cement for Cement Modified Recycled Base

TON

3576

5

Maintenance Stone

TON

420

6

HMA Surface Course Type

SY

64189

7

HMA Surface Course Type C (liquid included) 2" Uniform

SY

80763

8

SY

64789

SF

1,296

10

HMA Surface Course Type C (liquid included) 175 LBS/SY Permanent Construction Signs (Ground Mounted) Scheme E Permanent Construction Signs (Ground Mounted) Scheme C

SF

532

L1,

Permanent Vegetation

MSY

70.3

12

Permanent Yellow Markers Bi-Dir-4"x4" 4" White Solid Lines (Pavement Edge Lines) Fast Dry Paint

EA

11"46

LF

86298

24" White Solid Lines (Stop) Fast Dry Paint 4" Yellow Solid Line (No Passing Zone) Fast Dry Paint 4" White Solid Lines (Pavement Edge Lines)Thermoplastic-g0

LF

534 86298

9

13 14 15 1,6

E

(liquid included) 75LBS/SY

LF

LF

mil

85298

4" Yellow Solid Line (No Passing Zone) Thermoplastic-9O mil 24" White Solid Lines (Stop)Thermoplastic-125 mil

LF

86298

LF

534

19

Street Signs

EA

51

20

Full Depth HMA Patching 6" uniform

SY

600

2t

Railroad Crossing Symbols-Fast Dry Paint

EA

4

22

Railroad Crossing Symbols-Thermoplastic 125-mil

EA

4

17 18

UNIT PRICE

GRAND TOTAL

Page 3

of4

LANCASTER 2015 SCDOT SECONDARY ROADS ONE TIME MONEY

Page 57

EXTENDED PRICE

1 2

UNIT

DESCRIPTION

Item # Mobilization Traffic Control

QUANTITY

LS

9

LS

9

Cement Modified Recycled Base (8" Uniform) Method 2 Portland Cement for Cement Modified Recycled Base

SY

129998

TON

3576

5

Maintenance Stone

TON

420

6

HMA Surface Course Type E (liquid included) 75LBS/SY

SY

64189

7

HMA Surface Course Type C (liquid included) 2" Uniform HMA Surface Course Type C (liquid included) 175 LBS/SY

SY

80763

SY

64189

SF

L296

3

4

8

9 10

Permanent Construction Signs (Ground Mounted)Scheme Permanent Construction Signs (Ground Mounted) Scheme

E

C

SF

532

MSY

74.3

71

Permanent Vegetation

12

Permanent Yellow Markers Bi-Dir-4"x4" 4" White Solid Lines (Pavement Edge Lines) Fast Dry Paint

EA

1,L46

LF

86298

24" White Solid Lines (Stop) Fast Dry Paint 4" Yellow Solid Line (No Passing Zone) Fast Dry Paint

LF

534

LF

86298

LF

86298

t7

4" White Solid Lines (Pavement Edge Lines)Thermoplastic-90 mil 4" Yellow Solid Line (No Passing Zone)Thermoplastic-90 mil

LF

85298

18

24" White Solid Lines (Stop)Thermoplastic-125 mil

LF

534

19

Street Signs

EA

51

20

SY

600

21

Full Depth HMA Patching 6" uniform Railroad Crossing Symbols-Fast Dry Paint

EA

4

22

Ra

EA

4

13 1,4

15

16

ilroad Crossing Symbols-Thermoplastic 125-mil

T,ETCASTER 2015 SCDOT SECONDARY ROADS ONE TIME MONEY

Page 61

Hough Road 5-29'275 Name: CamP Creek Road Start: Stop:EndSCDoTMaintenance l)897 Road Length in feet: 2A ft. Width in feet: 0.359 Miles:

Road

ITEM NO

DESCRIPTION

UNIT

QUANTIW

t

Mobilization

LS

1,

2

Traffic Control

LS

1

SY

4426

4

Cement Modified Recycled Base (8" Uniform) Method 2 Portland Cement for Cement Modified Recycled Base

TON

122

5

Maintenance Stone

TON

50

7

SY

4555

9

HMA Surface Course Type C (liquid included) 2" Uniform Permanent Construction Signs (Ground Mounted) Scheme

E

SF

48

10

Permanent Construction Signs (Ground Mounted) Scheme

C

SF

76

L1,

Permanent Vegetation

MSY

2.3

12

Permanent Yellow Markers Bi-Dir-4"x4"

EA

39

13

4" White Solid Lines (Pavement Edge Lines) Fast Dry Paint

LF

3794

1,4

24" White Solid Lines (Stop) Fast Dry Paint

LF

1_O

4" Yellow Solid Line (No Passing Zone) Fast Dry Paint 4" White Solid Lines (Pavement Edge Lines)Thermoplastic-90 mil

LF

3794

LF

3794

LF

3794

18

4" Yellow Solid Line (No Passing Zone)Thermoplastic-90 mil 24" White Solid Lines (Stop)Thermoplastic-125 mil

LF

10

19

Sileet Signs

EA

3

3

15 1,6

L7

MONEY T,ANCASTER 2015 SCDOT SECONDARY ROADS ONE TIME

Page 62

Name: Start: Stop: Road Length in feet: Width in feet: Miles: Road

ITEM NO

Neill Road Shiloh UnitY Road SC200

t24tg 24 2.351 UNIT

QUANTITY

LS

1

2

Mobilization Traffic Control

LS

t

3

Cement Modified Recycled Base (8" Uniform) Method 2

SY

34481,

4

Portland Cement for Cement Modified Recycled Base

TON

948

5

Maintenance Stone

TON

100

6

SY

33101

7

HMA Surface Course Type E (liquid included) 75LBS/SY HMA Surface Course Type C (liquid included) 2" Uniform

SY

1020

8

HMA Surface Course Tvpe C (liquid included) 1-75LBS/SY

SY

33101

E

SF

168

(Ground Mounted)scheme c

SF

76

MSY

75.2

1

9

10

DESCRIPTION

ffins ffigns

(Ground Mounted)scheme

LL

Permanent Vegetation

12

Permanent Yellow Markers Bi-Dir-4"x4" 4" White Solid Lines (Pavement Edge Lines) Fast Dry Paint

EA

249

LF

24826

24" White Solid Lines (Stop) Fast Dry Paint

LF

96

LF

24826

1.6

4" Yellow Solid Line (No Passing Zone) Fast Dry Paint 4xVVhit" srlid Lines (Pavement Edge Lines)Thermoplastic-90 mil

LF

24826

17

A y"tto* Solid Line (No Passing Zone)Thermopla+rcfgix!

LF

24826

18

24" White Solid Lines (Stop)Thermoplastic-l2S mil

LF

96

19

Street Signs

EA

7

13 L4 15

MONEY r,amcASrrR 2015 FCnOt SECONDARY ROADS oNE TIME

Page 69

lnformation

RFB:1531

Road

Name:

Start: Stop:

Cedar Pines Lake, Caskey, Westshore, and South Lake Roads 5-29-205 Riverside Road

Riverside Road

feet: Width in feet: Miles: Road Lenglh in

ITEM NO

tlgtT 20

2.257 UNIT

QUANTITY

Mobilization Traffic Control

LS

1

LS

1.

27806

4

Cement Modified Recycled Base (8" Uniform) Method 2 Portland Cement for Cement Modified Recycled Base

SY

TON

76s

5

Maintenance Stone

TON

50

7

HMA Surface Course Type C (liquid included) 2" Uniform Permanent Construction Signs (Ground Mounted) Scheme

SY

27742

SF

216

L

2 3

9

DESCRIPTION

E

SF

L52

MSY

14.6

EA

239

LF

23834

L2

Permanent Construction Signs (Ground Mounted)Scheme Permanent Vegetation Permanent Yellow Markers Bi-Dir-4"x4"

13

4"

t4

24" White Solid Lines (Stop) Fast Dry Paint

LF

720

15

4" Yellow Solid Line (No Passing Zone) Fast Dry Paint 4" White solid Lines (Pavement Edge Lines)Thermoplastic-90 mil

LF

23834

LF

23834

LF

23834

18

4" Yellow Solid Line (No Passing Zone) Thermoplastic-90 mil 24" White Solid Lines (Stop)Thermoplastic-125 mil

LF

120

t9

Street Signs

EA

9

21.

Railroad Crossing Symbols-Fast Dry Paint

EA

4

22

Ra il

EA

4

10

t1

1-6

L7

Whi@

C

Edge Lines) Fast DrY Paint

road Crossi ng Sym bols-Thermoplastic 125 mil

LANCASTER 2015 SCDOT SECONDARY ROADS ONE TIME MONEY

Page70

Road'Name: Start: Stop: Road Length in feet: width in feet: Miles:

Old Hickory/Lute Lane 5-29-35 and 5-29-438 Riverside Road West North Corner Rd 11658 24

2.208 UNIT

QUANTITY

Mobilization

LS

1,

Traffic Control

LS

1.

SY

32383

4

Cement Modified Recycled Base (8" Uniform) Method 2 Portland Cement for Cement Modified Recycled Base

TON

891

5

Maintenance Stone

TON

50

SY

31088

ITEM # 1.

2 3

DESCRIPTION

8

HMA Surface Course Type E (liquid included) 75 LBS/SY HMA Surface Course Type C (liquid included) 2" Uniform HMA Surface Course Type C (liquid included) 175 LBS/SY

9

Permanent Construction Signs (Ground Mounted) Scheme

E

SF

96

10

Permanent Construction Signs (Ground Mounted) Scheme

C

SF

L52

11

Permanent Vegetation

MSY

L4.3

t2

EA

225

13

Permanent Yellow Markers Bi-Dir-4"x4" 4" White Solid Lines (Pavement Edge Lines) Fast Dry Paint

LF

2331,6

1.4

24" White Solid Lines (Stop) Fast Dry Paint

LF

48

23316

LF

23316

17

4" Yellow Solid Line (No Passing Zone) Fast Dry Paint +, wr'ite solid Lines (Pavement Edge Lines)Thermoplastic-90 mil a" vottn* Solid Line (No Passing Zone)Thermoplastic-90 mil

LF

LF

2331.6

18

?4" white Solicl Lines (Stoo)Thermoplastic-125 mil

LF

48

19

Street Signs

EA

5

6 7

15

t6

Ler.rCairsR 2015 iCnOr SECSNDARY RSADS oNE TIME MSNEY

SY

460

SY

31088

Page 71

1531 addendum #1 attachment.pdf

20 Full Depth HMA Patching 6" uniform SY 600. 21. Railroad Crossing Symbols-Fast Dry Paint EA 4. 22 Railroad Crossing Symbols-Thermoplastic 125 mil EA 4.

5MB Sizes 0 Downloads 180 Views

Recommend Documents

HVAC Addendum 1.pdf
Page 1 of 1. Lancaster County. State of South Carolina. Invitation for Bid. Addendum 1. Solicitation Number: Date Issued: Procurement Officer: Phone: E-Mail Address: 500170222. 02/14/2017. Jill Newman. 803-416-9511. jnewman@lancastercountysc. net. DE

1531-3_Hampton_SpecsPlansBid.pdf
Page 1 of 118. Request for Bids. For. Improvements to Hampton Avenue (S-29-68). SCDOT SECONDARY ROADS ONE-TIME MONEY. In Lancaster County.

Cat-Addendum-1.pdf
MEN - Heather Black, Heather Light Blue. WOMEN - Heather Purple, Heather Light Blue. N star C. MEN - Heather Royal, Heather Black, Heather Purple.

1531-3_Hampton_SpecsPlansBid.pdf
Page 1 of 118. Request for Bids. For. Improvements to Hampton Avenue (S-29-68). SCDOT SECONDARY ROADS ONE-TIME MONEY. In Lancaster County. Advertisement Date: December 1, 2016. Project Number: 1531-3. Bids Due: Length: 2:00 PM, January 4, 2017. 0. 69

Addendum PDF.pdf
Page 1 of 3. Consumers For Responsible Home Inspections Dedicated to Consumer Protection. Feb.%28,%2017. Presentation!Addendum: Bill259!Sec!#1. Again%we% thank% the%Committee%on%Social%Policy% for% their%attention%and%respect%shown to% the. presenter

Addendum No1_12831A.pdf
BACA: Pesan Kamar Abdulaziz. ..., hal 7. Page 1. Whoops! There was a problem loading this page. Retrying... Whoops! There was a problem loading this page. Retrying... Addendum No1_12831A.pdf. Addendum No1_12831A.pdf. Open. Extract. Open with. Sign In

Addendum-DSPC.pdf
8. IW S. Corpuz Guiwan VS. 9. Christine Guinacaran ZCHS Main. 10. Christina Columbres DPLMHS. 11. Fe Vilos PPLMHS. 12. Linda Arcillas MNHS. Secondary.

ILFD Metal Building Addendum 1.pdf
DESCRIPTION: INDIAN LAND FIRE DEPARTMENT METAL BUILDING. Please note the following changes to the scope of work highlighted in yellow below: II.

ADDENDUM-1-JULY-2017-MVHS-Roofing Project.pdf
Mountain View Monte High School. Addendum No. 1. EL MONTE UNION HIGH SCHOOL DISTRICT. 3537 JOHNSON AVENUE. EL MONTE, CA 91731.

ADDENDUM-1-JULY-2017-SEM-PRESSBOX.pdf
Try one of the apps below to open or edit this item. ADDENDUM-1-JULY-2017-SEM-PRESSBOX.pdf. ADDENDUM-1-JULY-2017-SEM-PRESSBOX.pdf. Open.

Addendum Wireman.pdf
Page 1 of 1. Page 1 of 1. Addendum Wireman.pdf. Addendum Wireman.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Addendum Wireman.pdf. Page 1 of 1.

Addendum Merged.pdf
Home Office: 514-331-6343. Home: 514-333-4124. [email protected]. Condo Office Phone: 514-338-1941. Condo Office Fax: 514-338- ...

Inmate Phone Services Addendum 1.pdf
Duration(Secs) 34,343,915. Duration(Mins) 572,398.58. Page 1 of 1. Inmate Phone Services Addendum 1.pdf. Inmate Phone Services Addendum 1.pdf. Open.

AD-FOR-BIDS for Website - Addendum 1.pdf
University of California, Berkeley ... BERKELEY, CA; ALAMEDA COUNTY ... the last ten (10) years that the organization, any affiliate, parent or subsidiary company, ... at: realestate.berkeley.edu for the Planholder's List and Site Tour attendees.

Addendum-1 - Appointment of Centre Superintendent and Instructions ...
Addendum-1 - Appointment of Centre Superintendent a ... n Semester (Regular & Back) Examination 2017-18.pdf. Addendum-1 - Appointment of Centre Superintendent an ... en Semester (Regular & Back) Examination 2017-18.pdf. Open. Extract. Open with. Sign

Addendum 3I.pdf
Page 1 of 2. ADDENDUM 3I: 1262 AD: From Livonian and Novgorod Chronicles. A Russian Raid on the Town of Dorpat (Yuryev). 1. From the Livonian Rhymed ...

Addendum 3 Questions.pdf
Page 1 of 1. Addendum 3 Questions.pdf. Addendum 3 Questions.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Addendum 3 Questions.pdf.

Addendum 3 _TolmanHall.pdf
Page 1 of 109. Tolman Hall Seismic Replacement - Berkeley Way Project No. 12629A. University of California, Berkeley. ADDENDUM NO. 3. to the. CM/GMP Bidding Documents. March 19, 2015. The following clarifications, changes, additions, or deletions sha

Addendum No.1_17869A_Lewis.pdf
ceiling support grid as shown in the attached photos. Are these obstructions to be. relocated, or shall framing members and drywall be placed around these.

1531 specs - KM FINAL 1-5-16 send out.pdf
Download. Connect more apps... Try one of the apps below to open or edit this item. 1531 specs - KM FINAL 1-5-16 send out.pdf. 1531 specs - KM FINAL 1-5-16 ...

Addendum No. 1_17644A_CKC Water Line.pdf
May 10, 2018 - Page 3 of 4. Addendum No. 1_17644A_CKC Water Line.pdf. Addendum No. 1_17644A_CKC Water Line.pdf. Open. Extract. Open with. Sign In.

Attorney General Memorandum Aug 2013 Addendum-Page2ofLA.pdf ...
Attorney General Memorandum Aug 2013 Addendum-Page2ofLA.pdf. Attorney General Memorandum Aug 2013 Addendum-Page2ofLA.pdf. Open. Extract.

Addendum April 26, 2018.pdf
Point Pleasant HS Antrim ES Ocean Township. HS. 1 May 10, 2018. 5:15 to 9:00 p.m.. $299. Monmouth County. Vocational. Monmouth County. Vocational.