RSSP Clark Kerr Campus Water Line University of California, Berkeley
Project No.: 17644A
ADDENDUM NO. 1 to the BID DOCUMENTS Thursday, May 10, 2018
General:
The following changes, additions, or deletions shall be made to the following documents as indicated and shall be a part thereof as if originally specified and/or shown. All other conditions shall remain the same. Item No. 1:
Item No. 2:
Item No. 3:
Item No. 4:
Ref:
Advertisement for Bids – Description of Work
Scope:
REVISE to read: “Install new 8” combined fire waterline from curb side in Derby Street into Clark Kerr campus supplying buildings 16 and 17. Provide new fire hydrant as shown on Southwest Place. Provide all potholing, excavation, pipe installation, pressure tests, backfill and patch paving to existing conditions. Include an additional estimated 6’ length of 6” PVC, to be measured on plan, that extends the current fire waterline POC to the interior of Building 17. This added scope should include the additional length of underground trenching, and a new wall penetration, including flexible joints as specified on Wall Penetration Details on Sheet 3.0 – Detail Sheet”.
Ref:
Information Available to Bidders
Scope:
INSERT the attached Information Available to Bidders (2 pages) immediately after Supplementary Instructions to Bidders.
Ref:
01 11 00 - Summary of Work – 2. Description of Work – b.
Scope:
REVISE to read: “b. Scope of work includes but is not limited to: “Install new 8” combined fire waterline from curb side in Derby Street into Clark Kerr campus supplying buildings 16 and 17. Provide new fire hydrant as shown on Southwest Place. Provide all potholing, excavation, pipe installation, pressure tests, backfill and patch paving to existing conditions. Include an additional estimated 6’ length of 6” PVC, to be measured on plan, that extends the current fire waterline POC to the interior of Building 17. This added scope should include the additional length of underground trenching, and a new wall penetration, including flexible joints as specified on Wall Penetration Details on Sheet 3.0 – Detail Sheet”.
Ref:
Drawing C2.0 – Plan Sheet Bidder Question: “Please reference key note 8 on C2.0. Note calls for 6” Fire Lateral Building Connection. Plan view shows 6” FW +/- 8LF from building. Please confirm if 6” FW is to be brought to interior of building 17 and then picked up by NIC interior sprinkler retrofit project by others.”
Scope:
Clarification: Confirmed, the new 6” FW is to be brought to the interior of the building. See revised drawing C2.0, Plan Sheet, 1 page, attached immediately hereinafter. END OF ADDENDUM NO. 1
Page 1 of 4
Addendum No. 1
RSSP Clark Kerr Campus Water Line University of California, Berkeley
Project No. 17664A
INFORMATION AVAILABLE TO BIDDERS The following information is made available for the convenience of bidders and is not a part of the Contract. The information is provided subject to the provisions of Article 3 of the General Conditions. 1. Drawing FP‐1.0 – Basement Piping Plan, UCB CLC BLDG 17, Job No. 18038, dated 04‐27‐18, prepared by Walschon Fire Protection, Inc., 1 page, attached immediately hereinafter.