BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: RFI Responses to LLB GC Firm Questions

ADDENDUM #1 REQUEST FOR PROPOSAL: LEASE-LEASEBACK GENERAL CONTRACTOR SUNKIST MODERNIZATION & RECONSTRUCTION PROJECT Facilities & Planning Department

DATE: 08-16-2017 REQUEST FOR INFORMATION (RFI) RESPONSES TO LLB GC FIRM QUESTIONS

RFI 001

RFI 002

RFI 003

RFI 004

LLB GC:

1. 2. 1. 2.

“Will you be coming out with a different RFP for commissioning services?” “Is this an “At Risk” project?” Commissioning will be a deliverable of the LLB GC, as part of the project. LLB GC is responsible for all aspects of the project from bidding through closeout.

1. 2. 1. 2.

“Is the “Schedule with Work Plan” required to be submitted with the proposal?” “How does the Schedule with Work Plan factor into the scoring?” Only firms invited to interview are required to complete the Fee Proposal (Attachment 3). The fee proposal (Attachment 3) will be used to calculate the Best Value Score.

LLB GC:

1.

“Where do we get a copy of the plans?"

AESD:

1.

Please reference Architect’s CONCEPTUAL DESIGN DRAWINGS included with this addendum.

1. 2. 1. 2.

“There appears duplicate questions in Attachment 1: Prequalification Questionnaire (pages 8 & 9). Questions 22.a. and 22.b. appear to be identical to questions 22.c. and 22.d. Please clarify.” “In question 22, “on or after what “Date”” is unclear. Please clarify.” Delete questions 22.c. and 22.d. For both questions 22.a. and 22.b., projects shall be those completed on or after 2010.

LLB GC:

1.

“Are the existing utilities to be removed and replaced, or modified to support the new design?”

AESD:

1.

New utilities shall be provided from point of connection (City) to fixture.

LLB GC:

1.

“Will this be an active campus or a phased project?”

AESD:

1.

Staff and students will be relocated to a temporary site during construction.

LLB GC:

1.

“What is the extent of modernization to existing buildings to remain?”

1.

It is anticipated that the buildings to remain will be upgraded with finishes, systems, and equipment compatible and complimentary to the new construction.

AESD:

LLB GC: AESD:

LLB GC: AESD:

RFI 005

RFI 006

RFI 007

AESD:

ADDENDUM #1: RFI RESPONSES, JOB WALK SIGN-IN, and AOR CONCEPTUAL DRAWINGS (RFP for LLB GC (Sunkist)

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: RFI Responses to LLB GC Firm Questions ADDENDUM #1 REQUEST FOR PROPOSAL LEASE-LEASEBACK GENERAL CONTRACTOR ~ SUNKIST MODERNIZATION & RECONSTRUCTION PROJECT ANAHEIM ELEMENTARY SCHOOL DISTRICT: Facilities & Planning Department

RFI 008

RFI 009

RFI 010

RFI 011

RFI 012

RFI 013

LLB GC:

1.

“Is there civil engineering work in this project?”

AESD:

1.

Site work includes Code compliant accessibility upgrades, and associated path of travel.

LLB GC:

1.

“Will there be any changes made to the RFP timeline?”

1.

District has modified the RFP TIMELINE as follows: Short List Interviews to be held on Monday, September 11, 2017. No other changes to RFP timeline are anticipated.

LLB GC:

1.

“May we visit the site during the school day?”

AESD:

1.

There is to be no access to the school site from 6:30 AM to 6:30 PM on school days.

LLB GC:

1. 2. 1. 2.

“How many points for each Proposal Evaluation Category; what is the Maximum Total Score?” “Does the calculation for scoring include General Conditions? What is the construction duration?” Proposal Evaluation and Best Value Score examples can be found in Article X: Proposal Evaluation and Best Value Score, beginning on page 19 of 22 of the RFP. Refer to RFP Article II: Background on the Project, beginning on page 6 of 22.

LLB GC:

1.

“What is the status of the project in terms of design and DSA submission?”

AESD:

1.

The architect is in Design Development; hence, the need for preconstruction services for this project.

LLB GC:

1. 2. 1.

“What is the requirement for prequalification of subcontractors?” “What is the scope of work so Contractors know what trades to list for subcontractors?” Please reference, beginning on page 5 of 22 of the AESD LLB RFP, I: Notice for Request for Proposals for Preconstruction and Lease-Leaseback Services, the following: “Each proposer shall submit with its proposal on the form furnished with the RFP with a list of the designated subcontractors on this Project as required by the Subletting and Subcontracting Fair Practices Act, California Public Contract Code section 4100 et seq.” Also reference VII: Subcontractor Designations and information contained therein. Please reference II: Background on the Project, on page 6 of 22 of the AESD LLB RFP, for Preconstruction and LLB Services for general scope of work. Please refer to the architect’s conceptual design drawings, included with this addendum.

AESD:

AESD:

AESD: 2.

LLB GC:

RFI 014

RFI 015

1.

“How do we calculate our fees: Preconstruction, Lease-Leaseback, General Conditions?”

1.

Please reference, beginning on page 14 of 22 of the AESD RFP, VIII: Contents of the Proposal, section D: Fee Proposal – Preconstruction Fee, Lease-Leaseback Fee, and General Conditions – “Attachment 3” and the contents denoted therein; paying particular attention to “Only those Firms that are invited to interview will be required to complete the Fee Proposal (Attachment 3).” Attachment 3 outlines expression of fees for Preconstruction Services, Lease-Leaseback Services, and General Conditions.

LLB GC:

1.

“Do we need to include a list of MEP subcontractors in our response to RFP?”

AESD:

1.

Please reference AESD’s answer to RFI 013, this Addendum.

AESD:

ADDENDUM #1: RFI RESPONSES, JOB WALK SIGN-IN, and AOR CONCEPTUAL DRAWINGS (RFP for LLB GC (Sunkist)

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: RFI Responses to LLB GC Firm Questions ADDENDUM #1 REQUEST FOR PROPOSAL LEASE-LEASEBACK GENERAL CONTRACTOR ~ SUNKIST MODERNIZATION & RECONSTRUCTION PROJECT ANAHEIM ELEMENTARY SCHOOL DISTRICT: Facilities & Planning Department

LLB GC:

RFI 016

RFI 017

RFI 018

1. 2. 1.

“How long is the Short List Interview?” “Can we bring presentation boards or slide presentations?” Please reference X: Short List Interviews Contents of the Proposal, of the RFP. The first paragraph has been modified to read (the word “will” has been revised to read “may” as follows: After each Firm’s final score is calculated, the Proposal Evaluation Committee, based on the final scores, will determine the short list of Firms that will be invited to interview with the Proposal Evaluation Committee. The interview may consist of a short presentation (15 minutes) followed by a question and answer period (30 minutes). After the interview, the Proposal Evaluation Committee will re-evaluate the scores for the Firms invited to interview and make adjustments to the scores, if any, based on the information presented at the interviews. The re-evaluated final scores will be used to calculate the Best Value Scores (as defined in Education Code section 17400) in accordance with Section X.D. A Best Value Score will not be calculated for those Firms not invited to interview with the Proposal Evaluation Committee.

AESD:

2.

Presentation Boards and Slide Presentations are permitted; however, selected candidates need to provide their own easels, computer and overhead projection equipment. AESD cautions selected candidates to be mindful of time constraints of interview duration.

LLB GC:

1.

“Can we make changes to the Agreement, Attachments, or Leases?”

AESD:

1.

No changes are allowed. Exceptions or Changes requested will deemed non-responsive.

LLB GC:

1.

“How many copies of the RFP and Agreement Documents are required?”

1.

District has modified the RFP Proposal quantities, denoted in the first paragraph in VIII: Contents of the Proposal to nine (9) hard copies as follows:

AESD:

Firms must submit one (1) original copy that contains a copy of the RFP and ATTACHMENTS, along with nine (9) hard copies, and a digital copy (thumb drive) of the proposal. All proposals should address the requested information for each of the evaluation categories below. The proposal shall demonstrate the qualifications, competence, and capacity of the Firm:

ADDENDUM #1: RFI RESPONSES, JOB WALK SIGN-IN, and AOR CONCEPTUAL DRAWINGS (RFP for LLB GC (Sunkist)

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Mandatory Project Walk-Through Sign-In Sheet

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Mandatory Project Walk-Through Sign-In Sheet

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Mandatory Project Walk-Through Sign-In Sheet

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Mandatory Project Walk-Through Sign-In Sheet

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Mandatory Project Walk-Through Sign-In Sheet

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Architect's Conceptual Drawings

view along sunkist street - entry

sunkist elementary school

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Architect's Conceptual Drawings

master plan – sunkist existing site

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Architect's Conceptual Drawings

drop-off

site program

SUNKIST ST

parking 4

1

5

relocated crosswalk

relocated field

admin.

(e) field

new classroom BLDG

RIC 2

MPR new BLDG

food svc.

parking

3

7

10

(e) classroom BLDG

6

8

9

(e) classroom BLDG

(e) classroom BLDG

2

bus drop off

3

kinder parking lot – 17 stalls

4

parking lot – 101 stalls

5

entry plaza

6

artist courtyard

7

sunkist stage

8

the grove

9

outdoor learning spaces

10

artist alley

11

shaded kinder play

12

hardcourts

new total parking spaces: 118 existing parking spaces: 75 new bus drop off: 207’ existing bus drop off: 120’ existing parent drop off: 223’

parking

sunkist elementary school

shaded parent drop off

new parent drop off: 405’

11

N

12

1

PIONEER PARK

legend

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Architect's Conceptual Drawings

all buildings - first floor

Entry

playfields

grounds stg.

Multi-Use / Music / Flex Research & Innovation Center

entry plaza

lounge

T T

20 20 12

1 17 14 15 16 11

4 7 T

T

counsl.

learning se / rsp se / rsp center psych J

3rd

T 18 av E

3rd

learning T center

8

Administration

3rd 3rd

se / rsp

T

learning commons

3rd

Faculty/ Staff work & lounge Classrooms Kindergarten / Pre K

M.R. up

up

2

ticket booth

9

10 13 work

3 5

11

Food Services

up

T 6

Building Support Learning Commons MPR.

sunkist st. drop-off

stage.

lunch shelter

outdoor stage.

music

custodial grounds stg.

T T stg.

stg. T

K

Work/sto.

20

Work/sto.

J

K

Pre-K

T T K- outdoor sto.

40

1st

T

grounds stg.

flex

20

1st

outdoor learning

the grove food service

0

E

sto.

2nd

2nd

AV

T

1st

serving line

Pre-K

N

2nd

sto.

stg. storage

2nd

2nd

60

sunkist elementary school

T T K

K

1st

K

1st

Work/sto.

E T stg.

Work/sto.

K T T

pioneer park

1. book stacks 2. innovation lab 3. self check in/out 4. circulation area 5. reading area 6. tech work room 7. textbook storage 8. DLC, TA & curric. coach 9. parent resource 10. lobby & reception 11. conference room 12. records storage 13. health clerk 14. flex office 15. assistant principal 16. principal 17. anaheim achieves office 18. calm room 19. support pod 20. restroom – staff

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Architect's Conceptual Drawings

new building - second floor

legend playfields Entry

6th

6th RIC

6th

learning commons

6th

5th

J 19 stg. 20 20 18 t

dn

t learning commons

IDF

below

5th

5th

4th

4th

Classrooms

4th

Building Support 5th

MDF

se / rsp

learning commons dn

dn

Learning Commons

4th

18. calm room 19. support pod 20. restroom – staff

MPR below

Existing Roof

CLASSROOM TOTALS mech. well

Existing Roof

2 Pre-K 6 Kindergarten 15 1st - 3rd 12 4th – 6th 4 Special education / RSP __________________________ 39 TOTAL 2

N

0

20

40

60

sunkist elementary school

pioneer park

Learning Centers

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Architect's Conceptual Drawings

artist courtyard

sunkist elementary school

BID NO. 90506 ~ LLB RFP_SUNKIST ADDENDUM: Architect's Conceptual Drawings

sunkist way

sunkist elementary school

ADDENDUM #1_LLB RFP_RFI Responses w attachments ...

ADDENDUM #1_LLB RFP_RFI Responses w attachments 20170816 (Sunkist).pdf. ADDENDUM #1_LLB RFP_RFI Responses w attachments 20170816 ...

6MB Sizes 0 Downloads 216 Views

Recommend Documents

Addendum PDF.pdf
Page 1 of 3. Consumers For Responsible Home Inspections Dedicated to Consumer Protection. Feb.%28,%2017. Presentation!Addendum: Bill259!Sec!#1. Again%we% thank% the%Committee%on%Social%Policy% for% their%attention%and%respect%shown to% the. presenter

Addendum No1_12831A.pdf
BACA: Pesan Kamar Abdulaziz. ..., hal 7. Page 1. Whoops! There was a problem loading this page. Retrying... Whoops! There was a problem loading this page. Retrying... Addendum No1_12831A.pdf. Addendum No1_12831A.pdf. Open. Extract. Open with. Sign In

Addendum-DSPC.pdf
8. IW S. Corpuz Guiwan VS. 9. Christine Guinacaran ZCHS Main. 10. Christina Columbres DPLMHS. 11. Fe Vilos PPLMHS. 12. Linda Arcillas MNHS. Secondary.

Addendum Wireman.pdf
Page 1 of 1. Page 1 of 1. Addendum Wireman.pdf. Addendum Wireman.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Addendum Wireman.pdf. Page 1 of 1.

Addendum Merged.pdf
Home Office: 514-331-6343. Home: 514-333-4124. [email protected]. Condo Office Phone: 514-338-1941. Condo Office Fax: 514-338- ...

Addendum 3I.pdf
Page 1 of 2. ADDENDUM 3I: 1262 AD: From Livonian and Novgorod Chronicles. A Russian Raid on the Town of Dorpat (Yuryev). 1. From the Livonian Rhymed ...

Addendum 3 Questions.pdf
Page 1 of 1. Addendum 3 Questions.pdf. Addendum 3 Questions.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Addendum 3 Questions.pdf.

Addendum 3 _TolmanHall.pdf
Page 1 of 109. Tolman Hall Seismic Replacement - Berkeley Way Project No. 12629A. University of California, Berkeley. ADDENDUM NO. 3. to the. CM/GMP Bidding Documents. March 19, 2015. The following clarifications, changes, additions, or deletions sha

Addendum No.1_17869A_Lewis.pdf
ceiling support grid as shown in the attached photos. Are these obstructions to be. relocated, or shall framing members and drywall be placed around these.

Addendum No. 1_17644A_CKC Water Line.pdf
May 10, 2018 - Page 3 of 4. Addendum No. 1_17644A_CKC Water Line.pdf. Addendum No. 1_17644A_CKC Water Line.pdf. Open. Extract. Open with. Sign In.

Attorney General Memorandum Aug 2013 Addendum-Page2ofLA.pdf ...
Attorney General Memorandum Aug 2013 Addendum-Page2ofLA.pdf. Attorney General Memorandum Aug 2013 Addendum-Page2ofLA.pdf. Open. Extract.

HVAC Addendum 1.pdf
Page 1 of 1. Lancaster County. State of South Carolina. Invitation for Bid. Addendum 1. Solicitation Number: Date Issued: Procurement Officer: Phone: E-Mail Address: 500170222. 02/14/2017. Jill Newman. 803-416-9511. jnewman@lancastercountysc. net. DE

Addendum April 26, 2018.pdf
Point Pleasant HS Antrim ES Ocean Township. HS. 1 May 10, 2018. 5:15 to 9:00 p.m.. $299. Monmouth County. Vocational. Monmouth County. Vocational.

Read PDF Attachments: A Novel
... E-Books, Attachments: A Novel Online , Read Best Book Online Attachments: A Novel, Read Online ... &Park, Fangirl, and Landline ... applied to be "internet.

Printer Fleet Addendum 2.pdf
Page 1 of 3. Lancaster County. State of South Carolina. Invitation for Bid. Addendum 2. Solicitation Number: Date Issued: Procurement Officer: Phone:.

Addendum #03_06-06-16.pdf
FIRE PROTECTION, PLUMBING, HVAC,. ELECTRICAL/FIRE ALARM/TELEDATA. SUBCONTRACTOR BID DOCUMENTS. for. University of California, Berkeley.

With Responses by Howard Gardner
Massachusetts Institute of Technology. Patricia Albjerg Graham, Dean of the Harvard Graduate School of. Education from 1982 to 1991, is Professor of ...

Functions, Responses, and Effectiveness.pdf
United States of America: Secularist, Humanist, Atheis ... ed States; Functions, Responses, and Effectiveness.pdf. United States of America: Secularist, Humanist, ...

Brokerage Duties Addendum to Property Management Agreement.pdf ...
Brokerage Duties Addendum to Property Management Agreement.pdf. Brokerage Duties Addendum to Property Management Agreement.pdf. Open. Extract.

Addendum #06_06-23-16.pdf
REQUIREMENTS AND INFORMATION. END OF ADDENDUM NO. 6. Page 2 of 2. Addendum #06_06-23-16.pdf. Addendum #06_06-23-16.pdf. Open. Extract.